TM
Taha Mohamed Taha Marzouk
Project Manager infra-structure at Specialist Group for Engineering and Consulting
Sidi Bishr, Alexandria, EgyptWork Experience
Technical Support EngineerFull Time
Bee'ah Consultants
Dec 2021 - Jan 2024 -2 yrs, 1 month
Saudi Arabia , Riyadh
- Job Details:Technical Support for Planning, Training ending with ISO 9001, ISO 41001, ISO 45001, Environmental / Health / Safety International Standards + RECYCLING main Standards
Assistant Project Manager: Senior Electrical EngineerFull Time
Sustainable Architecture Consultants
May 2018 - Jun 2021 -3 yrs, 1 month
Saudi Arabia , Riyadh
- Job Details:RADISSON BLU Hotel; Exit10 , Riyadh. 4-Star Hotel. Redesign and Supervision of New Hotel of 160 Rooms. Works include As-Built Drawings, BIM and Cad Final Shop Drawings.
Project Manager infra-structureFull Time
Specialist Group for Engineering and Consulting
Dec 2013 - Present -11 yrs, 6 months
Saudi Arabia , Riyadh
- Job Details:Consultant- Project Manager / Infra-Structure renovation of Central Hospital - Southern Province 576 Bed Project Details : Area 285000 square meters, Budget 185 million Saudi Riyals, Project Period:2years, April2014 / April2016 extended 3 and 6 months successively. Scope of Work: Civil Works: New water, Rain Water, Drainage, Irrigation Tanks. Renovation of Hospital Buildings Architectural: Renovation of Wards, Theatres, Emergency and Intensive Care Units, and all direct servicing Rooms [Treatment, Laboratory, X-Ray, CT-Scan, Sterilization, Out-Patient Dep.(Totally/ Partially Wet Areas). Modification of Patient-Wards from 5-bed to 2-bed rooms, with equivalent electromechanical modification. Electrical Works: Medium/Low Voltage Systems, Bed-Head Units, CCTV, Access Control, Lighting, Public Address,... Mechanical Works: HVAC, Sterilization, Medical Gases, Sanitary, Boilers, Laundry, Kitchen, .... Consultant Team: Engineers: 2 Electrical, 2 Mechanical, 1 Architectural, 1 Civil [plus Quantity Survey] Supervisors: 1 Finishing, 1 Electrical, 1 Mechanical
Chief of Electrical DepartmentFull Time
Al-Etqan Consulting Company
Jan 2011 - Dec 2013 -2 yrs, 11 months
Saudi Arabia , Makkah
- Job Details:1. Leading a Team of 35 Electrical Consulting Engineer, plus 16 Assistant Engineers, for Day-to –Day Consulting Works all over the Project {2 square Kilometers}. 2. Updating and Modifying Design Drawings for all Electrical and/or Electronic Systems:- a. Modifying the Design Drawings of main supply [six Loops] to seven Loops to cover additional Buildings added upon request of Specified Authorities and Ministries. The additional Energy [48 MVA] consequently rose up to [63 MVA] which still in the range of the Agreement between Owner {Ministry of Finance} and Saudi Electricity Company; SEC/ {Western Province}. b. Separating the Fuel Station with its attachments [Commercial Area] to an additional Loop to be operated and maintained under the supervision of SEC. c. Co-ordination with SEC to approve Power Distribution and Power total Demand Loads according to SEC standards and Calculations. 3. Approval of Electrical Materials' Submittals. 4. Approval of All Shop Drawings. 5. Attending Periodical Meetings with Owner Representatives and Main Contractor to discuss obstacles, problems and solve suspended technical points. 6. Co-ordination with Quality Control Section for Defective Electrical Works. 7. Settling procedure of As-Built Drawings submission. Additional Tasks: Approval of Medical Buildings[ 50 Bed Hospital, Men's Isolation Building, Women's Isolation Building, Mortuary, Ancillary Building and Medical Complex] through Ministry of Health/ General Department of Holly-Capital. Approval of Medical Equipment according to Ministry of Health Specification
Education
Bachelor's of Electrical Engineering in Electrical Engineering
Alexandria University (ALEXU)Jan 1969 - Jan 1974 - 5 yr
Skills
Languages
Arabic
FluentEnglish
FluentFrench
IntermediateTurkish
Beginner
Training & Certifications
H.S.E. U.K.
Health and Safety United Kingdom·2014NEHES
NEW ENGLISH HEALTHCARE NONMEDICAL ENGINEERING SOCIETY·2011B.M.S.
HONEYWELL·2006