profile-img

Wael Ahmed Mohamed

Planning Manager

Mokattam, Cairo, Egypt

Work Experience

  • Planning ManagerFull Time

    Electro Cable Egypt

    Feb 2016 - Present -9 yrs, 4 months

    Egypt , Cairo

    • Job Details:Position Summary Responsible for leading the production planning team to effectively create and maintain an efficient production schedule that meets customer requirements while minimizing cycle times and effectively utilizing inventory. Duties & Responsibilities - Oversee and mentor the Planning Group to ensure a high level of proficiency and development. - Create Master Production Schedule while maintaining targeted inventory levels. - Maintain a valid capacity requirement plan that supports the Master Production Schedule. - Identify and manage bottlenecks and capacity issues with the production management team. - Establish and monitor ERP system parameters, including safety stock levels for finished goods and raw material inventories. - Lead weekly/monthly Master Production Schedule meetings. - Liaise with Engineering, Purchasing, Manufacturing, Manufacturing Engineering, Installations and Client Services to achieve on time delivery at optimum cost with optimum inventory levels. - Create weekly/monthly reports and KPIs. - Maintain a high standard of professional knowledge, ethics and practices when dealing with customers, suppliers, peers, subordinates, supervisors and other key stakeholders of the company.
  • Planning ManagerFull Time

    Giza Power Industry

    Nov 2015 - Present -9 yrs, 7 months

    Egypt , Cairo

    • Job Details:Position Summary Responsible for leading the production planning team to effectively create and maintain an efficient production schedule that meets customer requirements while minimizing cycle times and effectively utilizing inventory. Duties & Responsibilities - Oversee and mentor the Planning Group to ensure a high level of proficiency and development. - Create Master Production Schedule while maintaining targeted inventory levels. - Maintain a valid capacity requirement plan that supports the Master Production Schedule. - Identify and manage bottlenecks and capacity issues with the production management team. - Establish and monitor ERP system parameters, including safety stock levels for finished goods and raw material inventories. - Lead weekly/monthly Master Production Schedule meetings. - Liaise with Engineering, Purchasing, Manufacturing, Manufacturing Engineering, Installations and Client Services to achieve on time delivery at optimum cost with optimum inventory levels. - Create weekly/monthly reports and KPIs. - Maintain a high standard of professional knowledge, ethics and practices when dealing with customers, suppliers, peers, subordinates, supervisors and other key stakeholders of the company.
  • Planning Section HeadFull Time

    Elsewedy Electric

    Jul 2008 - Oct 2015 -7 yrs, 3 months

    • Job Details:Duties & Responsibilities - Preparing Monthly Plan for Production [Master Production Schedule (MPS)]. - Monitoring MRP with stock controller to insure materials availability on time. - Analysing the KPIs Monthly Reports. - Responsible for all Export and Local Orders from receiving in the factory till being ready to be shipped to the customer. - Responsible for preparing production schedule and work order by analysing M/Cs free capacity and B.O.M. - Reviewing of work orders and assigning delivery dates according to machines free capacity and materials’ Stock. - Prepares defined work packages, including detailed instructions, drawings, bills of material, references, etc., to initiate and control production work. - Determining the status of assigned projects, expedites operations that delay schedules and alters schedules to meet unforeseen conditions. - Monitoring customer rejections and taking necessary steps to reduce the rejection level. - Monitoring daily and weekly production status. - Customer Situation and Finished Products Follow up.
  • Planning EngineerFull Time

    Elsewedy Electric

    Sep 2006 - Jun 2008 -1 yr, 9 months

    Egypt , Cairo

    • Education

      • MBA in Strategic Management

        Arab Academy for Science, Technology and Maritime Transport (AAST)

        Jan 2016 - Jan 2018 - 2 yr

      • BSc in Engineering; Communications and Electronics Engineering

        Helwan University

        Jan 1998 - Jan 2004 - 6 yr

      • High School - Thanaweya Amma

        Helwan Secondary School

        Jan 1998 

      Achievements

      Development of ERP System in Elsewedy Electric

      Skills

      • Supply Chain
      • Microsoft Office
      • Problem Solving
      • Customer Satisfaction
      • Troubleshooting
      • Programming
      • Computer Netowrks

      Languages

      • Arabic

        Fluent
      • English

        Advanced

      Training & Certifications

      • MBA

        Arab Academy for Science, Technology and Maritime Transport·2019
      • Supply Chain Management

        AUC·2010
      • Lean Manufacturing

        Elsewedy Electric·2010
      • Primavera

        Cairo University·2010
      • CPIM

        AUC·2010
      • Ms Project

        Computech·2009
      • MS Project

        ISI·2008
      • UMTS

        Cairo University·2008
      • HCSE

        NTI·2005
      • HCSE

        NTI·2005
      • HCNE

        NTI·2005
      • HCNE

        NTI·2005
      • VB Programming

        2002
      Share this Profile