
Wael Talal Sayed
Architect at Freelancer
Beirut, LebanonWork Experience
Site engineerFull Time
KARIM ETC
Mar 2017 - Aug 2017 -5 months
Lebanon , Beirut
- Job Details: Overseeing the progress at the site for our scope of work that's including the installation of wall cladding, flooring tiles, plaster, painting and block work. Managing the organization of the laborers to the satisfy client requirements and coordinate with the main contractor in order to handover at the lead time. Preparing the BOQ, PC and Variation orders. Interior design for the main headquarter for MTC touch competition.
ArchitectFull Time
Freelancer
Jan 2017 - Present -8 yrs, 5 months
- Job Details:Responsible for all architectural works, (Permit drawings, Site supervision, Execution works, Graphics, Presentation, Interior Design, Rendering) “Mr. Ahmad Awwad” Private Villa (Anout El Shouf – Lebanon): Producing design and responsible of all permit drawings, execution drawings, Site supervision, (area= 800 m2). “Mr. Bassam El Akoum” Private Villa (Bsaba El Shouf- Lebanon): Responsible of all architectural drawings (Avant Project, Permit and execution drawings) rendering and site supervision (area = 450 m2). “Mr. Nadim Abou Daher” Private Villa (Zaarouriyeh El Shouf – Lebanon): Renovation of an executed villa from interior and exterior (rendering, choosing of material, interior design decoration and execution works). “Mr. Ali Fakhreddin” Dairy & Cheese Factory (Anout El Shouf - Lebanon): Dairy & Cheese Factory with a farm 35 crow (600 m2) - Producing permit and shop drawings / Overseeing the progress on the site. “Mrs. Bilal and Mohammad Hasan Private Villa (Anout El Shouf – Lebanon): A project consists of two private villa on the same land, one is about 474 m2 and another about 1054 m2 in Anout Mount Lebanon: Producing design and responsible of all permit drawings, execution drawings, Site supervision, from A to Z (a turnkey project). “Saudi ICON company (Saudi Arabia)” : A project consists of a motel in Jizan in Saudi Arabia was built and need to be renovated, doing the rendering from the as-built drawings and choose the right material to be approved by the client.
Site engineerFull Time
A.R. HOURIE ENTREPRISES S.A.L.
Jun 2016 - Sep 2016 -3 months
Lebanon , Beirut
- Job Details:(Rive Gauche Tower project-Cornish El Naher-Beirut) Overseeing the finishing work on the side in charge of podium zone, that’s including the garden on the top. Overseeing the installation of materials and hand over it to the consultant (Floor tiles, wall cladding, false Ceiling tiles and its supporting system and Doors). Installation of curtain wall system on the elevation of the towers with its insulation and louvers on it.
Site and Office architectInternship
INSPIRATIONS architecture and urban planning studio
Jun 2015 - Aug 2015 -2 months
Lebanon , Beirut
- Job Details: Overseeing the site work and producing the execution drawings (plans and details) for Anout-Hill Project (Residential) / Lot 1265.
Education
Bachelor's Degree in architectural engineering
Beirut Arab UniversityJan 2016
Languages
Arabic
FluentEnglish
AdvancedFrench
Intermediate
Training & Certifications
RIBA
RIBA·2016