    • Job Details:Project: Construct a Residential compound “SODIC West Town” The company has executed 4 residential building including all facilities, Parking Areas, Land Scape. The electrical work includes: - Installation of all electrical components inside the buildings “MDB – apartment’s panel – lighting system – HVAC System – Submersible Pump System - Installation of Low voltage cables inside the building. - Installation of all light current systems "T.V –Telephone – Intercom" - Installation of connections between the buildings and the outside networks.
  • senior electrical site engineerFull Time

    orascom

    Aug 2015 - Aug 2017 -2 yrs

    Egypt , Cairo

    • Job Details:Generally responsible for implementations and monitoring of all electrical related works at site. -Ensure and prepare the resources such as materials, consumables, equipment, tools, required for all electrical and related works before execution. -Manages directly a team of Technicians provide engineering and technical support to the entire electrical work group at site. - Prepare quantity survey and measurements -Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups. - Ensures that all the works done are in accordance with the approved design drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards. - Performs other related duties as may be required by the Project Manager PROJECT: (Residential compound "Palm Hills Village Gardens Katameya"). The project contains modern stand alone villas, townhouses and apartments and includes lushly landscaped gardens, streets and networks. I am responsible for sector A, which is estimated with the half of the project. The electrical work includes: - Installation of all electrical components inside the buildings. - Installation of all components at the power system rooms "Transformer -Ring Main Unit- MDB" - Installation of Street lighting Columns and lighting panels. - Installation of all pillars and dwelling boxes (coffree) - Supervise the installation of switchgear panels and connect the M.V terminals with it.
  • senior mep site engineerFull Time

    nile misr

    Feb 2011 - Aug 2015 -4 yrs, 6 months

    Egypt , Cairo

    • Job Details:Generally responsible for implementations and monitoring of all electrical related works at site. -Ensure and prepare the resources such as materials, consumables, equipment, tools, required for all electrical and related works before execution. - Review design drawings and studies the contract documents and applicable standards or specifications before execution of the project. -Manages directly a team of Technicians provide engineering and technical support to the entire electrical work group at site. - Prepare quantity survey and measurements - Establish invoices and supervise its proper application. -Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups. -Coordinates with the Consultant / Owner’s representatives for any site instructions and inspection of works. - Ensures that all the works done are in accordance with the approved design drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards. - Performs other related duties as may be required by the Project Manager Main Projects: 1-Renovation and development of central air conditioning plant at (Hurghada Airport). The electro-mechanical work included: Installation of all M.C.Cs to operate the machines. Installation of cables that feeds all M.C.Cs Renovation and development of A.H.Us Hall (lighting and power sockets) Installation of BMS to control every machine at the plant Installation of 3 chillers 550 K.W Installation of 11 A.H.U includes 3 fans (supply – return - smoke) 2-The rehabilitation of the (Le Meridian DAHAB Hotel). The project was constructing a Health club, Gym and Meeting room. The Company was responsible of all electro-mechanic works. The electrical work included: - Installation of all electrical components inside the buildings. "Lighting fixtures, panels and all accessory" - Installation of all light current systems and networks "T.V, Telephone, Data, Fire alarm and Public address" - Installation of Low voltage networks - Installation of Medium voltage cables and connections. - Installation of all components at the power system room "Transformer -Ring Main Unit- MDB" 3-Building an emergency power station for (MARSA MATROH Airport) The company was the main contractor and there was a subcontractor for civil works. The electro-mechanical work included: Installation of 2 generators 60 K.V.A Installation control panels and ATS panel Installationofthe fuel tanks (daily and monthly) Installation of all power connections with the basic electrical station. Installation of fire alarm system including the connections with the master system at the air port. Installation of all lighting, power sockets and the station service panel.
  • Electrical Site EngineerFull Time

    Etac Promo

    Feb 2010 - Feb 2011 -1 yr

    Egypt , Giza

    • Job Details:PROJECT (Residential city "EL KHAMAIL"). The company has executed 36 residential building in-cluding all facilities, streets and networks; I was responsible for a range of buildings estimated with 20 building include its networks. The electrical work includes: - Installation of all electrical components inside the buildings. - Installation of all light current systems "T.V –Telephone – Intercom" - Installation of Low voltage networks - Installation of Medium voltage network - Installation of Telephone network - Installation of all components at the power system room "Transformer -Ring Main Unit- MDB" - Street and Gardens Lighting network With Installation of lighting Columns
  • Education

    • Bachelor's Degree in electrical power and machines

      Helwan University

      Jan 2003 - Jan 2008 - 5 yr

    • High School - Thanaweya Amma

      ameen el raay

      Jan 2003 

    Skills

    • Construction
    • electrical engineer
    • Civil Engineering
    • Supervision
    • Microsoft Word
    • MEP Engineering
    • Microsoft Excel
    • AutoCAD
    • Microsoft Powerpoint

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • PRMG (Management of Project Resources)

      The American University in Cairo·2016
    • Primavera Project Management (P6)

      The American University in Cairo·2015
    • • Construction Safety and Health

      OSHAcademy·2015
    • Microsoft Project

      RITI Regional IT Institute ·2015