
Wael Nageh Moussa
Engineering Geologist / Geotechnical Engineer / Project Manager
Maadi, Cairo, EgyptWork Experience
Senior Geotechnical EngineerFull Time
Misr Consult Group MCG
May 2017 - Present -8 yrs, 3 months
Egypt , Cairo
- Job Details:Leading a team of Civil Engineers and Geologists, to deliver geotechnical interpretative reports, site investigations, lab and in-situ testing, geotechnical design and analysis; and Geotechnical construction supervision in order to completing project construction safely, on time and on budget while maintaining client’s or/and applicable codes, standards and specifications requirements. Selected Projects I. AHL MISR WALKWAY PROJECT; 2019-2020 Owner: Ministry of Housing, Utilities & Urban Communities. Prime Consultant: ACE Moharram-Bakhoum. Main Contractor: The Arab Contractors under Supervision of The Engineering Authority for the Armed Forces. Geotechnical Consultant: Misr Consult Group. ▪ As the project manager; leading to provide high quality and reliable geotechnical drilling, soil sampling and laboratory testing program, site instrumentations: piezometers and inclinometer. ▪ Foundation’s design: Pile design and analysis using PLAXIS (driven steel and Concrete displacement pipe piles / non-displacement HP piles), slope stability assessment and analysis using Slope/W. Riprap, rockfill columns, and ground anchors design and analysis. ▪ Follow up with site supervisor on: monitoring and inspections; excavations for foundations, installation of piles, embankment construction and anchorage. II. CAVO EIN SOKHNA PROJECT; 2018-2019 Owner and Main Contractor: Travco Properties. Prime Consultant: Nile Engineering Consulting Bureau. Geotechnical Consultant: Misr Consult Group. ▪ As the project geotechnical consultant; delivering site investigations, geophysical investigations (shallow seismic refraction; Foundation design; cemented rockfill CRF recommendations and monitoring; slope stability assessment and analysis; excavations, ground support and foundations monitoring, inspection and acceptance. III. El Alamein Desalination Plant Project; 2017 -2018; New Alamein City, Egypt. Owner: The Egyptian Ministry of Defense in partnership with Aqualia intech S.A, FCC Construction. Prime Consultant: AAW Consulting Engineers Geotechnical Consultant: Misr Consult Group. ▪ Design review for stone columns; ▪ Supervision on stone column installation and implementing preconstruction and during constructions QA QC specifications and inspections. ▪ Post-construction QA QC verification and in-situ testing: SPT borings, CPT probes and DCP Test. ▪ Design and construction supervision for the plant’s main access road. IV. 320 MW near-shore Windfarm Power Plant Project; 2019, Ras Shukeir, Ras Ghareb, Egypt Owner: NREA Egypt New and Renewable Energy Authority & Ras Ghareb Wind Energy. Main Contractor: Lekela Power &Orascom Construction. Geotechnical Consultant: Misr Consult Group. ▪ Providing a detailed geotechnical consulting services: Site investigation; sampling; in-situ testing; ▪ geophysical survey SASW and MASW and site instrumentations and Ground water monitoring. ▪ Geotechnical foundations design and flood hazard Assessment.
Senior Engineering Geologist / Geotechnical Engineer / Project ManagerFull Time
Arab Center For Engineering Studies
Mar 2015 - Feb 2017 -1 yr, 11 months
Saudi Arabia , Riyadh
- Job Details:Area of Experience: Field testing, geotechnical sampling, Soil and rock laboratory testing, Geotechnical studies reports for towers, dams, roads, buildings and retaining structures, geological and geotechnical mapping, Investigation, monitoring and analysis for slope stability, Piles design and testing, Dewatering system and Soil improvement (Dynamic Compaction). Duties and Responsibilities:- • Preparation of factual and routine Geotechnical reports, Q.C/Q.A plan, Method of Statement, Checklist and technical proposals • Ensure the geotechnical investigations (onshore & offshore), sampling and Testing carried out in accordance with BS 5930 and the design according to Eurocode 7 or according to customer’s requirements and contract specification international (ASTM, AASHTO, BS, EN and DIN) or approved in house policies and procedures. Process customer’s orders and ensure all customers’ requirements are carried out. • Assist Department Manager in contract review related to site investigation works. • Train entry-level and junior engineers and geologist and Review their geotechnical reports. • Respond to customer’s inquiries and provides professional advice in the fields of his/ her operation. • Supervise on laboratories staff and testing to ensure that meet the specs and standard requirement ISO9000, ISO9001 and ISO/IEC 17025. Projects: - Reporting and supervising geotechnical field and Laboratory work for more than 30 Project on Riyadh and cross Saudi Arabia and specifically; the responsible technical manager for the following projects: • Custodian of Two Holy Mosques King Abdullah Bin Abdul Aziz For Developing The Security Locations Of Ministry Of Interior Second Stage-KAP-2B2 With Al Arrab Contracting Company at DUMAT AL JANDAL- ALJOUF - K.S.A.; entail about 218 boreholes, 36 test pits, laboratory testing, Geotechnical calculation, analysis, recommendations and supervision on improving of dune sand soil by Dynamic compaction techniques. • Riyadh Metro Project (Package 3 (Lines 4, 5 & 6), FAST Consortium in Riyadh-K.S.A; for a different project of Site investigation (drilling more than 400 boreholes with depths (10m to 50m)and test pits excavation), in situ tests, geophysical investigation and Sinkhole investigation and cavity detection (Geophysical and probing) remediation (grouting). • AL FAWAZ TOWER (4 basements and 25 stories Hotel Residential Building) in RIYADH –KSA: Include Geotechnical Investigation & Evaluation including drilling 12 boreholes, in situ testing and foundation design (raft foundation) and concrete durability, slope stability, excavation method, groundwater control and dewatering recommendations. • Al Manfouha Sewage Treatment Plant Project:, Fourth Stream, Riyadh City for Al Muhaidib Contracting Company with WS Atkins & Partners Overseas Engineering Consultants; entail about 35 boreholes, laboratory testing Geotechnical calculation, analysis and recommendations. • Al Dabb’iya Surface Facilities Phase III Project with Maire Tecnimont S.p.A for ADCO; geotechnical investigation for Gas Pipeline Construction of approx. 100 km of Offshore. • Hassyan energy clean coal power plant geotechnical investigation in Dubai, U.A.E; with the Consolidated Contractors Company (CCC) and Nepti, the investigation program includes drilling of 135 offshore boreholes with depths up to 20 meters below seabed.
Geological EngineerFull Time
Mahran Consult
Jul 2010 - Feb 2015 -4 yrs, 7 months
Egypt , Giza
- Job Details:• Planning, coordinating & supervising the geotechnical activities of various infrastructural and civil projects. Responsibility includes client liaison at various stages of the project. • Sampling and core logging, preparation of lab schedules to suit design requirements, compilation and interpretation of data. Preparation of factual and interpretive reports. • Performing various in-situ tests; SPT, Field permeability test, vane shear test, plate load test, and Schmidt hammer test, ERT, PMT and CBR etc. • Site investigation drilling and sampling, geological analyses and reporting. Instrumentation installation. Improvements of rock and soil by drilling and grouting. Cast in-situ piling, secant pile walls, anchoring. Concrete investigations. • Co-ordinate with contractors to achieve work according to the project standards. • Review concrete mix design and Asphalt mix design for the assigned projects. • Subgrade, sub base, base course, M.C & R.C and Pavement inspection. • Carry out Soil Testing; • Field Concrete testing (Slump, Compressive Strength); • Supervision upon geotechnical site investigation & Field test (SPT, CPT, Pressure meter test, ERT, GPR) and technical reports • Subsurface & Site investigations and preparing reports. • Preparing and sending report to the administration. Projects: - • Hyde Park Compound Project; For Damac Properties. New Cairo, Egypt. • Beverly Hills Compound Project located in 6th October City Giza Governorate Egypt; the project was consist of Geotechnical investigation & & internal Road works (infrastructure project). • Mall of Arabia Extension (2nd Stage) project, Engineering Enterprises for civil & Steal Constructions EEC Egypt, 6th October, Gizah, Egypt • Samsung (Electronics Factory - SEEG) Project for Gama for Trading & Contracting S.A.E, Egypt in Kom Abu Rady, Beni Suef, Egypt. • Toyota Egypt Toyota El-Sadat project: Parts Distribution Centre: At El-Sadat City, Monufia Governorate, Egypt.
Education
M.Sc. in Engineering Geology
Cairo University (CU)Jan 2013 - Jan 2016 - 3 yr
College Diploma in Quality Engineering & TQM
American University in Cairo (AUC)Jan 2013 - Jan 2015 - 2 yr
College Diploma in Geotechnical Engineering
American University in Cairo (AUC)Jan 2013 - Jan 2014 - 1 Year
B.Sc. in Geology
Al-Azhar UniversityJan 2005 - Jan 2010 - 5 yr
Achievements
Skills
Languages
Arabic
FluentEnglish
FluentGerman
Intermediate
Training & Certifications
GIS
AUC·2018Effective Marketing Tools and Strategies
Arab Center for Engineering Studies ·2016OSHA 40 hrs. HAZOWPER
Safety Unlimited, Inc·2016Foundation Guidelines and Design
Arab Center for Engineering Studies ·2015Geotechnical and Geoenvironmental Data Management (gINT)
Bentley Systems·2015