
Vivek Kumar Lodhi
Mine Planning and Production at pt. yuvaa works resources
Bhilai, IndiaWork Experience
pt. yuvaa works resources
Jan 2021 - Present -4 yrs, 6 months
Indonesia
- Job Details:Spearheaded the leasing of 10,000 hectares of coal-bearing land in the Sangatta region for greenfield mining development. Successfully acquired 212.56 hectares of strategic land for logistics infrastructure, including haul road and jetty access. Played a key role in project planning and land acquisition for a proposed large-scale coal mine with a production capacity of 12–15 million tons per annum (mtpa).
Planning and Production Manager
pt. oorja indonesia
Jun 2018 - Apr 2020 -1 yr, 10 months
Indonesia
- Job Details:Production manager in opencast coal mine at Batuah Samarinda East Kalimantan Indonesia. The annual production of the mine is 2.4 million tons with shovel mercy dumper technology in high stripping ratio and deep mining.
jms mining service pvt ltd
Jan 2018 - Jun 2018 -5 months
India
- Job Details:Achieved 60,000 te of coal per month from underground. Supervision of production, production planning, ventilation system, strata control and safety.
Education
Bachelor's Degree in Mining
Government Engineering College BilaspurJan 2007