
Tarek ziad noaman
Site engineer
Cairo, EgyptWork Experience
site engineerFull Time
Bahaa EL-Din for Contracting&\engineering Consultants
Oct 2014 - Mar 2015 -5 months
Egypt , Cairo
- Job Details:Implementation water plant in aboquir fertilizer factory Consists of 1- slap on grade with colum head and foundation to carry steel tanks And hanger to carry pipe lines system This slaps were restied on piles and piles cap 2- Administrative building consists of two floors
Plumbing&firefiting; Engineer (site engineer)Full Time
Arab contractors (osman ahmed osman)
Mar 2014 - Present -11 yrs, 3 months
Egypt , Cairo
- Job Details:Plumbing&firefiting; Engineer Implementation water&sewage; systems
site engineerFull Time
ECT (Egyptian Construction and Trading company(
Jan 2014 - Oct 2014 -9 months
Egypt
- Job Details:1-Implementation water plant Consists of three parts The first part consists of five sedimentation tanks (4.5*4.5) raw tank (24*2) The second part consist of two raw tanks (11.5*3) The third part is pump room and chemical store The cost of structure is 3 million pound 2-Draw shop drawings for three carseds frames draw shop drawing for two stairs for abulding 2-Treating water tanks using sika chemicals
Civil engineerFull Time
El-belbasy for Industry& trading
Aug 2013 - Dec 2013 -4 months
Egypt , Qalubia
- Job Details: draw shop drawings for steel tanks monitoring Manufacturing steel tanks
Education
Bachelor of Science (B.Sc.). in civil engineering
Benha Higher Institute of TechnologyJan 2008 - Jan 2013 - 5 yr
Activities
trainer at Societe Egyptienne D'entreprises (Moukhtar Ibrahim)
Student Activity
Jul 2012 - Aug 2012 -1 month
trainer at Arab contractor(OSMAN AHMED OSMAN)
Student Activity
Aug 2010 - Sep 2010 -1 month
Languages
English
Advanced
Training & Certifications
course in sap
elzohery·2012course
Cairo University·2010