
Ibrahim Abdelraheem Ahmed
electrical maintenance engineer at Sunny Pharmaceutical
10th of Ramadan City, Cairo, EgyptWork Experience
electrical maintenance engineerFull Time
- Job Details:Working in “Sunny Pharmaceutical Company” as an electrical shift engineer. Responsibilities: 1- The main task is electrical maintenance (periodic and corrective) for production line machines. 2- Electrical maintenance (periodic and corrective) for utilities such as ( Transformer, MDBs, SDBs, fire alarm, boiler, water station and H VAC). 3- Providing prompt response to inquiries whenever there is a breakdown and resolve the issue as soon as possible 4- Set maintenance plan 5- Recommending replacement for old or faulty electrical components.
technical support engineerFull Time
Cairo trade
Dec 2014 - Jan 2016 -1 yr, 1 month
Egypt , Cairo
- Job Details:Working in “Cairo Trade” as a technical support engineer for electrical and some mechanical works. Responsbilities: 1- The main task was electrical maintenance (periodic and corrective) for machines that traded to the clients. 2- Electrical installations for new machines and production lines in the factories that dealing with the company. 3- There were machines that have been maintained ; like Lujima machine (Japanese cardboard cracking machine, which was having faults in almost every electric part in it.
electrical support engineerFull Time
Utility for advanced systems
Dec 2011 - Nov 2014 -2 yrs, 11 months
Egypt , Cairo
- Job Details:- Working in “utility company for advanced systems” in filed of low voltage panel design power panels ( distribution panels – power factor improvement panels – ATS panels - control panels which may be (classic or plc (SIEMENS , LG) or smart relays) , cooling and air conditioning panels . and so on…………. - I deal with all types of temperature controllers like (krk, emko ,enda ) instrument. - I deal with most types of encoder and counter timers. - I deal with INVERTERS (AC MOTOR DERIVES ) such as (LG - DELTA - HEYNDAI - YASKAWA). - Making many panel for power factor correction (from 100 kvar to 1 Mvar). - Design works for distribution panels within the modern industrial plants and the distribution of loads .
Education
electrical power and machine in electrical engineering
Zagazig University (ZU)Jan 2006 - Jan 2010 - 4 yr
High School - Thanaweya Amma
Hossainia secondary schoolJan 2005
Skills
Languages
English
IntermediateFrench
Beginner
Training & Certifications
POWER PLANT
East Delta Electricity production Co at Abo Soltan Esmaelia·2009manufacturing transformers
ABB COMPANY·2008Distribution
El qnah for Electrical Distribution·2008