OE
Omar Abd El Momen El Khamry
Architecture Section Head /Shopdrawing,Leader,Coordinator
Giza, EgyptWork Experience
Architecture & ID Section HeadFull Time
AlKifah Contracting Company
Jan 2019 - Present -6 yrs, 5 months
Egypt , Cairo
- Job Details:*Leading a team of 11 Architecture & ID Engineers. *Responsible for Reviewing IFC AR & ID Package in parallelwith International building codes. *Responsible for Coordination With all Desiplines in addition to Site Requirements. * Responsible for all Shopdrawings submissions following Time schedule. * Following time Schedule & updating according to site requirements. * Attending all Coordination meetings * Following Suupliers & coordinate with them all the requirements. * Participate with tender team in preparing QC.
Senior Architecture Technical EngineerFull Time
Saudi Ben Laden Group
Jan 2013 - Present -12 yrs, 5 months
Egypt , Cairo
- Job Details:Project: •Holy Mosque Extension (El Haram) - Mecca – KSA Project Package: •Coordinated Model (AUTODESK REVIT) having the ability to take sections and wall sections anywhere in the building. •Studying Suppliers proposals regarding materials, Method statement, Method of fixation . •Coordination with other trades. •Detecting Clashes between Ceiling fixation systems with other utilities above Ceiling as We are dealing with Unique Ceiling material with Fixation system factor of safety 500% . •Coordination issues between Designer (DAR EL HANDASA) & Ceiling Manufacturer (Premiere Composite Technology) which require holding periodical meetings with manufacturer members (Different Nationalities) / Designer. •Attending Periodical Coordination meetings in Dubai with Ceiling manufacturer (Premiere Composite Technology), Provide them all required data needed in manufacturing process, Monitor the Manufacturing quality & Time progress. •Provide Site (Mecca) with all their requirements (Shop drawings – Details – Informations ………etc.
Senior Architect [Production department]Full Time
GENESIS Consultant
Jul 2012 - Jan 2013 -6 months
Egypt , Cairo
- Job Details:Projects : •King Khaled university campus, in Becha – KSA. •Buildings responsibility: Faculty of Computer Science building. Project Package: •Checking Building Design / Studies with International Codes Such as:- 1.National Fire Protection Association (NFPA). 2.International Building Code (IBC). 3.Metric Handbook Planning and Design Data. 4.Neufert – ADA – Graphic standard – Time saver. •Coordinated Base plan model ( AUTODESK REVIT) having the ability to take sections and wall sections anywhere in the building. •Plans – Elevations – Sections – Wall sections sheets. •Area plans sheets (stairs – toilets – kitchens) details. •Life safety plans (fire strategy) according to NFPA 2012 code. •Curtain walls – walls – doors – windows details. •Reviewing Every stage (Modeling - 30% - 90%) with Designer.
Architecture Technical Office EngineerFull Time
SAUDI OGER
Oct 2010 - Jul 2012 -1 yr, 9 months
Saudi Arabia , Riyadh
- Job Details:Projects : •King Abd Allah projects [Military sites & buildings] Project Package: •Redesign buildings & sites according to Client requirements. •Value engineering for buildings. •Coordination with Specialists companies such as AECOM Regarding special military buildings which need special requirements such as shooting ranges buildings . •Co-ordination between other disciplines (Structural, Electrical, Plumbing / HVAC ) Updating Architectural drawings according to their inputs .
Education
BSc in Architecture Engineering
Cairo University (CU)Jan 1999 - Jan 2004 - 5 yr
High School - Thanaweya Amma
Educational Home Language SchoolJan 1999
Languages
English
FluentFrench
Intermediate
Training & Certifications
Project Management PMP
Rapid·2012