Basic Info

Mohamed Sayed

More than 15 years

Giza, Egypt

Bachelor's Degree

Manager

Work Experience

Quality Assurance & Systems Manager at Ostool Transport Co.

Experience Details

Quality Assurance & Systems Manager

Quality

Senior Management (e.g. VP, CEO)

• Creating Quality and Operation critical processes and auditing them.
• Selection of the suitable GPS system for fleet management.
• Managing the construction and implementation of database system for managing the operation and operation cost.
• Managing and building the safety documents needed for HSE system (Incident occurrence record, Risk assessment and management documents, …etc).
• Reviewing technical tenders and determining the technical requirements of each project.


Company Details

Ostool Transport Co.

Cairo, Egypt

101-500 employees

Logistics and Supply Chain

N/A

Jun 2014 to present (2 years 6 months)
Production and Planning Manager at Reftruck

Experience Details

Production and Planning Manager

Manufacturing/Production

Manager

• Ensure the production process per the standard and resolve any delays or problems in the production
• Calculate the capacity of the factory and review the production of the factory and try to find innovative ways to increase the productivity
• Manage the production engineers and organize their daily work.
• Created Process sheets for all production steps to define roles
• Identified Bottlenecks in Production system
• Planning Production Line expansion process


Company Details

Reftruck

Cairo, Egypt

101-500 employees

Manufacturing

N/A

Feb 2014 to May 2014 (3 months)
Consultant (Temporary Contract) at ORASCOMCI NSF

Experience Details

Consultant (Temporary Contract)

Manufacturing/Production

Manager

•Lead a team of three engineers and a stock controller to review the item description in the inventory system to be corrected and the number coding for items.
•Develop an ordering policy for non-production inventory items.
•Identify the slow moving and obsolete items in the warehouse
• Defined Inventory Re-order standard and stock size
• Changed product labeling and pricing process on system


Company Details

ORASCOMCI NSF

Cairo, Egypt

N/A

Manufacturing

N/A

Aug 2013 to Jan 2014 (5 months)
Process and Quality Control Leader at General Dynamics Land Systems

Experience Details

Process and Quality Control Leader

Quality

Experienced (Non-Manager)

• Follow up Operations and Quality activities in Hull Final Assembly line and in special items made in workshop.
• Participated in placing the process sheet for manufacturing special items in the workshop.
• Chose the appropriate control chart for each process and presenting them to MRB (Materials Review Board) on monthly basis.
• Interface with ETP (Egyptian Tank Plant) team in dealing with quality and process issues
• Insure that test procedures and equipment meet quality assurance requirements
• Review the scrap and non-conformance material tests and of end of life procedure


Company Details

General Dynamics Land Systems (multinational)

Cairo, Egypt

101-500 employees

Manufacturing

N/A

Jul 2006 to Jul 2013 (7 years)
Process Engineering Head at Kamaglass (Kandil Subsidiary)

Experience Details

Process Engineering Head

Manufacturing/Production

Manager

•Negotiated the contracts for the purchase of glass containers manufacturing equipment with three major Chinese companies for a total value of two million U.S.D.
•Assisted in the set up of Kamaglass ( a new glass factory in the 10 th of Ramadan City)
•Purchased the utilities, accessories, and lab equipment.
•Responsible for approving all raw materials batch composition for the glass products
•Responsible for handling all technical customers issues
•Set up system standards for raw materials re-order levels to organize the relation between the warehouse and the procurement department.
•Responsible for the analysis of new products in cooperation with the Chinese experts to determine the required data such as productivity, efficiency, and expected production problems and solutions.


Company Details

Kamaglass (Kandil Subsidiary)

10th of ramadan city, Egypt

101-500 employees

Manufacturing

N/A

Nov 2004 to Jul 2006 (1 year 8 months)
Process Engineering Head at Kandil Steel Company

Experience Details

Process Engineering Head

Manufacturing/Production

Manager

• Wrote technical reports for the advice of consultants who visited the factory to solve technical problems
• Designed working procedures for the production, maintenance, and lab departments to comply with the requirements of the advice of technical consultancy and technical documents (Catalogues, text books, …. etc)
• Monitored the performance of new equipment design in the production line by observations, data collection, and sampling.
• Evaluated the production process (Annealing process) that it achieves the customers requirements with the lowest cost (less production time).
• Compared between different processing material (Cold Rolling Oil, raw material, …..etc) utilizing statistical process control tools using SPSS Software to assure that they meet the production process requirements and the quality requirements.


Company Details

Kandil Steel Company

10th of ramadan city, Egypt

More then 1000 employees

Manufacturing

N/A

Aug 2002 to Nov 2004 (2 years 3 months)
Assistant Logistics Manager at Nomad International

Experience Details

Assistant Logistics Manager

Logistics/Supply Chain

Experienced (Non-Manager)

• Planned Warehouse Layout
• Planned delivery Policies
• Coordinated with Logistics Manager the employee Work Charts inside the Warehouse.


Company Details

Nomad International

Cairo, Egypt

101-500 employees

Internet/E-commerce

N/A

Jul 2000 to Aug 2002 (2 years 1 month)
Production Engineer at HOBAS Egypt

Experience Details

Production Engineer

Manufacturing/Production

Entry Level

• Manage the production and daily maintenance of "couplings" utilizing the filament winding process.
• Coordinating the production and daily maintenance of "pipes" utilizing the centrifugal casting process.
• Supervised the installation of factory equipment.
• Controlled start-up procedures for manufacturing equipment.


Company Details

HOBAS Egypt (multinational)

Cairo, Egypt

101-500 employees

Manufacturing

N/A

Apr 1997 to Jul 2000 (3 years 3 months)
Technical Office Engineer at National Steel Fabrication Company

Experience Details

Technical Office Engineer

Engineering - Mechanical/Electrical

Entry Level

•Assisted in the installation of the factory machines and equipment and coordinated the relevant correspondence and paper work.
•Carried out material processing for corresponding tenders.
•Estimated material cost for the projects and studied the feasibility and implementation of various works.


Company Details

National Steel Fabrication Company

Cairo, Egypt

More then 1000 employees

Manufacturing

N/A

Mar 1996 to Apr 1997 (1 year 1 month)

Achievements


- Installed the GPS devices for 100 trucks working all over Egypt without stopping the operation and losing any opportunity cost.
- set up and started the control room for fleet monitoring


- increased the production capacity from 30-40 % to 70% by organizing and assigning roles to workers in process steps.


- ٍSolved the problem of stagnant stock by managing project to determine the stocks levels for inventory items.


- Selected the best operating material to produce the best quality with the lowest cost


Education

B.Sc in Mechanical Engineering

Education Details

B.Sc

Mechanical Engineering

American University in Cairo (AUC), Egypt

B / Very Good / 75 - 85%

N/A

N/A

American University in Cairo (AUC)
1989 - 1995
High School - Thanaweya Amma

High School Details

Thanaweya Amma

Rania Thanwia School

Saudi Arabia

1988

A / Excellent / 85 -100%

N/A

Rania Thanwia School
1988

Training and Courses

Training/Course Details

Statistical Process Control and Process Improvement

Jun 2003

American University in Cairo

N/A

Training/Course Details

Six Sigma Green Belt Level

Aug 2003

American University in Cairo

N/A

Training/Course Details

Project Management

Mar 2004

IMI

N/A

Training/Course Details

Production Planning and Control

Aug 2004

Kandil Training Center

N/A

This profile is fresh!
Last update 6 days ago.

Jobseeker photo

Profile Skills and Keywords

AnalyticalAssistant Logistics ManagerAutoCADCommunicatorConsultant (Temporary Contract)E-commerceEnglishFriendshipGeneral Dynamics Land SystemsHOBAS EgyptHard WorkerHorseback RidingInternetLean Six Sigma ManufacturingLogisticsLogistics And Supply ChainManufacturingMechanical EngineeringMicrosoft ExcelMicrosoft OutlookMicrosoft ProjectMicrosoft WordMiniTabMusicOperationsPlannerProblem SolverProcess And Quality Control LeaderProcess And Quality ImprovementProcess ControlProcess Engineering HeadProductionProduction And Planning ManagerProduction EngineerProduction Planning And ControlProject ManagementQuality AssuranceQuality Assurance & Systems ManagerQuality ControlReadingSPSSSix Sigma Green Belt LevelStatistical Process Control And Process ImprovementTechnical Office EngineerTransportation

Self-assesed Skills

Languages

English

English

: Fluent

: Fluent

: Fluent

: Fluent

Tools and Technologies

Microsoft Excel

Microsoft Excel

: Expert

: Extreme - I love it!

:

More than 7 years

Microsoft Word

Microsoft Word

: Advanced

: Extreme - I love it!

:

More than 7 years

Microsoft Project

Microsoft Project

: Advanced

: Extreme - I love it!

:

3-5 years

Microsoft Outlook

Microsoft Outlook

: Advanced

: Medium

:

3-5 years

SPSS

SPSS

: Advanced

: Extreme - I love it!

:

3-5 years

MiniTab

MiniTab

: Advanced

: Extreme - I love it!

:

3-5 years

AutoCAD

AutoCAD

: Intermediate

: High

:

3-5 years

Fields of Expertise

Quality Assurance

Quality Assurance

: Expert

: Extreme - I love it!

:

More than 7 years

Process Control

Process Control

: Expert

: Extreme - I love it!

:

More than 7 years

Process and Quality Improvement

Process and Quality Improvement

: Expert

: Extreme - I love it!

:

More than 7 years

Lean Six Sigma Manufacturing

Lean Six Sigma Manufacturing

: Intermediate

: Extreme - I love it!

:

3-5 years

Logistics

Logistics

: Intermediate

: Medium

:

3-5 years

Production Planning and Control

Production Planning and Control

: Beginner

: Extreme - I love it!

:

1-3 years

Project Management

Project Management

: Beginner

: Extreme - I love it!

:

1-3 years

Key Skills

Analytical, Planner, Communicator, Hard worker, Problem Solver

Online Presence

http://eg.linkedin.com/in/mhmdezzhttp://people.bayt.com/mohamed-ezzdin/

Mohamed is looking for new exciting career opportunities… Please share…

Get Your own Wuzzuf Profile Now !

Employer? If you're representing an organization or an enterprise, Signup here for FREE to see Mohamed's full profile and find more great talent and professionals to join your team.