
Ehab Elsayed Elgouhary
Electrical maintenance section head , PMP®
6th of October, Giza, EgyptWork Experience
Electrical Maintenance managerFull Time
Giza Cables Industries gc-3
May 2021 - Present -4 yrs, 2 months
Electrical maintenance section headFull Time
Jeddah cables Co. Elsewedy Helal CO.
Apr 2016 - Apr 2021 -5 yrs
Saudi Arabia , Rabigh
- Job Details: Assisting in developing SCADA system for monitoring M/C parameters as historical and runtime values for the purpose of measuring M/C performance Integrating Preheater device with CV. line including WINCC operator panel modifications and S7 300 PLC program modification. Supporting production people to maximize productivity Through keeping minimum troubleshooting rate . FMEA analysis for mega breakdowns. Assisting in building MV-Screening line from scratch including PLC-Software ,HMI and wiring . Assisting in modifying HV-Sheathing line adding 1 Extruder and synchronise with M/C. Make commissioning for Drum twister 3000M/C Prepare a daily consumption report for spare parts Organize duties between Technicians in the team Prepare reports for maintenance manager quarterly and yearly for spare parts and and how to control cost and minimize losses
maintenance section headFull Time
Tahweel integrated company
Feb 2014 - Jan 2016 -1 yr, 11 months
Saudi Arabia , Rabigh
- Job Details:general supervision on installing 10MW power station for factory supply , ( 5 cells switch gear, 5NOS 2MW transformers and low voltage cabinets including adjusting all the values of the O.L current and adjusting tape changer of the transformers ). Executing all the electrical works in the low voltage station from choosing the proper cable sizes’ , termination ,arranging over cable tray and connection from transformer to low voltage and from low voltage to machines General supervision for all the mechanical and electrical works in the compressed air station including setup compressors , pressure vessel , air driers and all the piping works inside and outside the station. Working under the supervision of Austrians in installing 3 SML 7 layers cast film machines from platform till the run test including all mechanical and electrical works Working with Italians in installing 6NOS 480 M^3 Penta silos including all the mechanical and electrical works . I take the responsibility with my team under the supervision of Italians to install a debagging machine to serve silos with all electrical and mechanical work and the run test. General supervision for assembling , installing and setup for 4NOS 300 tons Hitian injection machines and 2NOS 450 tons Hitian injection machines . Execute all the complete electromechanical works for a new extension 1200 m^2 , 18 m height such like 150m of compressed air pipes, 250m water line supply and return , 300 m cable tray with support, arranging 15NOS of 240mm cables over this cable tray along this distance 300m with the ends termination and connection , all the lighting works including piping and wiring and control panel for a 30 high pay light on the height of 18 m. Working under the supervision of Germans for installing Riefenhauzer 3 layers blown film machines including all electromechanical works . Complete responsibility about troubleshooting and provide all the spare parts and being sure from the stability of running of all the machines without any problems. Prepare all the feedback reports including fault report , spare parts flow report , annual preventive maintenance plan, preventive maintenance procedure for each machine and contractors current situation .
electrical maintenance engineerFull Time
UIC ELSEWEDY CABLES
Jun 2010 - Feb 2014 -3 yrs, 8 months
Egypt , Cairo
- Job Details: My job personalities is to maintain all production line at a stable state with the min. loses, organizing duties between technician at shifts I take the responsibility to modify a vertical injection machine from classic control to full automation using touch screen (easy view) and LG plc (KGL) I take the responsibility of rewiring of a NEWTECH horizontal magnetic wire machine I work with the expert in the commissioning period for a samp sestemi sheathing line I take the responsibility of transferring a cortinovis 1000 drum twister and rewiring in its new position Preparing report by spare parts flow and needed during my shift Get a detailed feedback about breakdowns and the analysis of troubleshooting to my manager daily
Education
Bc's of electrical engineering in Electrical power and machines
Zagazig University (ZU)Jan 2001 - Jan 2006 - 5 yr
Languages
Arabic
FluentEnglish
Advanced
Training & Certifications
CMRP®
SMRPCO·2020PMP®
PMI·2020Siemens Master drive
Internal training·2011PLC S7 300
Internal training·2011Wincc Flexible 2008
Internal training·2010