profile-img

Ehab Elsayed Elgouhary

Electrical maintenance section head , PMP®

6th of October, Giza, Egypt

Work Experience

  • Electrical Maintenance managerFull Time

    Giza Cables Industries gc-3

    May 2021 - Present -4 yrs, 2 months

    • Electrical maintenance section headFull Time

      Jeddah cables Co. Elsewedy Helal CO.

      Apr 2016 - Apr 2021 -5 yrs

      Saudi Arabia , Rabigh

      • Job Details: Assisting in developing SCADA system for monitoring M/C parameters as historical and runtime values for the purpose of measuring M/C performance  Integrating Preheater device with CV. line including WINCC operator panel modifications and S7 300 PLC program modification.  Supporting production people to maximize productivity Through keeping minimum troubleshooting rate .  FMEA analysis for mega breakdowns.  Assisting in building MV-Screening line from scratch including PLC-Software ,HMI and wiring .  Assisting in modifying HV-Sheathing line adding 1 Extruder and synchronise with M/C.  Make commissioning for Drum twister 3000M/C  Prepare a daily consumption report for spare parts  Organize duties between Technicians in the team  Prepare reports for maintenance manager quarterly and yearly for spare parts and and how to control cost and minimize losses
    • maintenance section headFull Time

      Tahweel integrated company

      Feb 2014 - Jan 2016 -1 yr, 11 months

      Saudi Arabia , Rabigh

      • Job Details:general supervision on installing 10MW power station for factory supply , ( 5 cells switch gear, 5NOS 2MW transformers and low voltage cabinets including adjusting all the values of the O.L current and adjusting tape changer of the transformers ).  Executing all the electrical works in the low voltage station from choosing the proper cable sizes’ , termination ,arranging over cable tray and connection from transformer to low voltage and from low voltage to machines  General supervision for all the mechanical and electrical works in the compressed air station including setup compressors , pressure vessel , air driers and all the piping works inside and outside the station.  Working under the supervision of Austrians in installing 3 SML 7 layers cast film machines from platform till the run test including all mechanical and electrical works  Working with Italians in installing 6NOS 480 M^3 Penta silos including all the mechanical and electrical works .  I take the responsibility with my team under the supervision of Italians to install a debagging machine to serve silos with all electrical and mechanical work and the run test.  General supervision for assembling , installing and setup for 4NOS 300 tons Hitian injection machines and 2NOS 450 tons Hitian injection machines .  Execute all the complete electromechanical works for a new extension 1200 m^2 , 18 m height such like 150m of compressed air pipes, 250m water line supply and return , 300 m cable tray with support, arranging 15NOS of 240mm cables over this cable tray along this distance 300m with the ends termination and connection , all the lighting works including piping and wiring and control panel for a 30 high pay light on the height of 18 m.  Working under the supervision of Germans for installing Riefenhauzer 3 layers blown film machines including all electromechanical works .  Complete responsibility about troubleshooting and provide all the spare parts and being sure from the stability of running of all the machines without any problems.  Prepare all the feedback reports including fault report , spare parts flow report , annual preventive maintenance plan, preventive maintenance procedure for each machine and contractors current situation .
    • electrical maintenance engineerFull Time

      UIC ELSEWEDY CABLES

      Jun 2010 - Feb 2014 -3 yrs, 8 months

      Egypt , Cairo

      • Job Details: My job personalities is to maintain all production line at a stable state with the min. loses, organizing duties between technician at shifts  I take the responsibility to modify a vertical injection machine from classic control to full automation using touch screen (easy view) and LG plc (KGL)  I take the responsibility of rewiring of a NEWTECH horizontal magnetic wire machine  I work with the expert in the commissioning period for a samp sestemi sheathing line  I take the responsibility of transferring a cortinovis 1000 drum twister and rewiring in its new position  Preparing report by spare parts flow and needed during my shift  Get a detailed feedback about breakdowns and the analysis of troubleshooting to my manager daily
    • Education

      • Bc's of electrical engineering in Electrical power and machines

        Zagazig University (ZU)

        Jan 2001 - Jan 2006 - 5 yr

      Skills

      • Microsoft Office
      • PLC
      • Engineering
      • AutoCAD 2D

      Languages

      • Arabic

        Fluent
      • English

        Advanced

      Training & Certifications

      • CMRP®

        SMRPCO·2020
      • PMP®

        PMI·2020
      • Siemens Master drive

        Internal training·2011
      • PLC S7 300

        Internal training·2011
      • Wincc Flexible 2008

        Internal training·2010
      Share this Profile