Achievements
The power Supply for the new Ammonia and Urea Plant, built by PEQUIVEN at Venezuela, it had not been ready on time for the start up on 2015, like was planned. But we performed an special plan in order to revamp 20 Km of overhead line, and be ready for do commissioning and stat up the ammonia and urea plant by the end of 2015. Perform the electrical Quality Assurance and Quality Control, at the construction, and commissioning for the new ammonia and Urea Plant built by Pequiven. (Contractors: TOYO ENGINEERING and MANFERROSTAAL). Include and design the load shedding system for the new plant. It wasn't including at the original scope.