KL

khalil lawandy

Construction Manager at • TRAVCO Engineering & Constructions Company

Hurghada, Red Sea, Egypt

Work Experience

  • Construction ManagerFull Time

    • TRAVCO Engineering & Constructions Company

    Sep 2023 - Present -1 yr, 9 months

    • Job Details:Travco Engineering & Construction Company Construction manager: September 2023 – till now Project Name: Marsa mars tourist Resort –MARSA ALAM– RED SEA-Egypt Project description: Construct and finishing a lot of hotels - different types of guest rooms - Main building (loopy + restaurants - lagoons) - swimming pools & spa & fitness - football, handball and tennis & golf stadium- - Service area contain: POWER STATION & LAUNDRY & DESALINATION PLANT & WATER TANKS & WATERTREATMENT Responsible for - Inspection of civil construction activities (steel reinforcement work, formwork and concrete works….). - Inspection of Finishing activities as (Painting –Geraint-Ceramic for walls–Marble – Thermal and Moisture Isolation –water proof membrane –Epoxy water proof -Gypsum board forCeiling- Gypsum dry walls – G.R.C –Metal wall cladding –Steel doors–Slope concrete… …etc ) - Implement and maintain the project quality control plan. - Inspect the works on site according to the planned procedures and report these inspections to the head of department. - To ensure and control that works are carried out according to the design defined by the Design Consultant. - Reporting on the performance of the quality system to the management for review and as a basis for improvement of the quality system and expediently resolve any non-conformances associated with the effective implementation of this policy and the approved Project Quality Management System. - Preparation and follow up IRF - Inspection for repairing of all concrete items according to approved procedure. - Review the shop drawings
  • Project ManagerFull Time

    Boulevard for Development tourism

    Apr 2022 - May 2023 -1 yr, 1 month

    Egypt

    • Job Details:Boulevard for tourism development Company Project manager: APRIL 2022 – May 2023 Project Name: BOULEVARD HOTEL – MARSA ALAM – RED SEA –Egypt Project description: Construct and finishing - boulevard hotel contain of 320 gust rooms &Main building with 7 swimming pool & spa & tennis stadium . -Diving center hotel contain of 85 guest rooms &Main building with diving pool -Service area contain: POWER STATION & LAUNDRY & DESALINATION PLANT & WATER TANKS & WATERTREATMENT Responsible for - Review all contract documents & the integration of the project. - Manage and control the whole project actively. - execute the project within project budget, time schedule, and specifications. - check the work performance, cost, and project schedule. Arrange technical, and financial activities of the project. - Get approval of executed works. find solutions to the problems facing any project activity and constraint through his staff and Reflect problems constraint which are beyond his responsibilities. - Make sure documentation is properly done for the project. - handle the materials approval at site. - Supervise safety and security of the project site. - organize the vacation schedule of the project staff. - Prepare monthly report with the assistance of quantity surveyor . - Development of execution plan. - Organization for execution of the plan. - Setting of targets & development of systems and *Procedure accomplishment of
  • Project ManagerFull Time

    7. S. for construction company

    Sep 2019 - Jan 2022 -2 yrs, 4 months

    Egypt , Suez

    • Job Details:Project Name: Mirage Hotel at El Ain Alsokhna – Suez –Egypt Project description Construct and finishing building in Mirage Hotel Which Consist of 274 gust room at 8 main parts with different types of Skeleton and 3 swimming pools &spa . Responsible for - Select appropriate sub-contractors / key suppliers for the project. - Directs and coordinates activities of project personnel to ensure project progresses on schedule and within prescribed budget. Then review progress reports and addresses issues as appropriate. - Review and comment on monthly progress reports and approve monthly payment applications. - Conduct project team meetings including Sub-Contractors to ensure project progresses on schedule and within defined budget. - Control the areas of operations such as Design and Planning, including technical - Prepare project proposal and determine time frame, budget, staffing requirements and allotment of available resources to various phases of project like: Develop Manpower staffing requirements / Interviewing / Approving site management / staff Sub-contracts / Identify SC requirements / Sub-contracts /Make Recommendations to Sub-contracts Manager to develop job specific scope of work. - Supervise the Construction Manager, Site Engineer and the Project Key Staffs. - Approve / prepare Purchase requisition for materials, tools & equipment, follow up with Procurement department on delivery, expedite and control all required materials, equipment and services, including those supplied by the client and site stores. - Review and approve Construction daily report (summary of work accomplished and the resources used) Review and comment on monthly progress reports, including monthly payment .
  • project ma managerFull Time

    Aied Dahim AL-Hamoud&partners for contracting

    Feb 2013 - Jul 2019 -6 yrs, 5 months

    Saudi Arabia , Tabuk

    • Job Details:*First Project Name : Duplication of road (Tabouk -Haql) part of road from (Bir Bin Hirmas- Alsharaf) second stage 3 km from may 2014 to july2019. Project description: 1-Construct road with length 7 km of highway: 2-Concrete structures: - A lot of box culverts & pipe culverts: - Wadi Bridge (precast concrete girder with different length ) *Second Project Name : connection of phase 2 industrial Estate in Qassim to the Riyadh –QASEEM expressway from 30th January 2013 to 27 th April 2014 . Project description: 1-Construct road with length 10 km of highway) Main road & loops and legs in cloverleaf cross) 2-Concrete structures: - A lot of box culverts & pipe culverts and Protection culverts for water & Aramco pipe. - bridge at cloverleaf cross( prestress concrete girders with different length) Responsible for - Contributed in defining, verifying and monitoring project scope & objectives by involving all relevant stakeholders - Formulated project management plan to plan, execute, monitor and control the project by tracking the progress and performance using appropriate analyzing tools and techniques - Monitored the project team, developed them in healthy environment to improve their competencies and to enhance project performance - Performed review & study of all project documents (contract obligations and technical issues) along with drawings, specifications & BOQ, to design a proper plan for project execution - Facilitated changes to the project scope, schedule, and cost using appropriate verification techniques to prepare the required change requests along with the necessary claims for discovered variations
  • Education

    • • Bachelor degree in Civil Engineering, EL Minia University & Graduation year: 2007 in civil engineering

      Minia University

      Jan 2002 - Jan 2007 - 5 yr

    Skills

    • MS
    • AutoCAD

    Languages

    • Arabic

      Fluent
    • English

      Advanced