profile-img

Khaled Said Abd Almoniam

Eng. Khaled Said

Cairo, Egypt

Work Experience

  • Production & Projects ManagerFull Time

    Egyptian forming company

    Jan 2012 - Present -13 yrs, 6 months

    Egypt

    • Job Details:• Ensure that manufactured products meet company and customer quality specifications. • Checking and testing materials and other parts delivered by outside suppliers. • Carrying out scheduled and random checks on product quality during the production process and also final tests prior to products being dispatched to the customer. • Involved with conducting investigations into products that require improvement as specified by the customer • Identifying where in the production process problems or faults (Root cause). • Ensuring the production quality with customer and the required international standards (ISO, DIN, ASTM, ANSI, JIS, ISO, Q.S, T.S, and QSB). • Make the statics analytical using (Six Sigma Statistics, MSA, SQC, SPC, Pareto diagram)
  • Production managerFull Time

    INDE Group

    Jan 2006 - Dec 2012 -6 yrs, 11 months

    Egypt

    • Job Details:1. Designer Engineer (Mould Maker) Sheet Metal in Research and Development Department (R&D). 2. Process Engineer. 3. Quality control Engineer 5. Production Engineer (Press, Turning, Plastic Welding, Fuel Tanks, Assembly (Cables, Jack, Seat Belt) Sections)
  • Technical Support EngineerFull Time

    Win-Tech.

    Jul 2005 - Jan 2006 -6 months

    Egypt

    • Job Details:• Win-Tech. Leading company of CAD/CAM Software and CNC machines and tooling : 1. (CAD/CAM Section) Delcam (Power Shape, Power Mill) Technical Support. 2. Tooling Section Technical Support Engineer for the C.N.C tooling (Walter).
  • Education

    • Engineering BSc in Mechanical Production

      Helwan University

      Jan 1998 - Jan 2005 - 7 yr

    • High School - Thanaweya Amma

      Alhurriyah

      Jan 1998 

    Achievements

    - Design & Manufacturing of Customs seal 1st time in Egypt. - Design & Manufacturing of Anti Riot helmets 1st time in Egypt. - Applying error proofing concepts in the production tools. - Increase the business profit by reduces production cost 27% in two years only. - Improve production quality level to achieve Zero PPM according to general motors’ standard. - Developing Fuel tank and Sheet metal molds to enlarge the tool life and prevent the unscheduled downtime. - Applying and sustain 5S in 3 months. - Applying continuous improvement 2 times per month by each labor.

    Skills

    View More

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • TQM Total Quality Management

      Canadian Academy·2011
    • Project Management Professional (PMP).

      Canadian Academy·2011
    • Six Sigma Statistics using EXCEL & MINITAB,

      Canadian Academy·2010
    • Six Sigma Green Belt

      American university in Cairo (AUC)·2010
    • Six Sigma Green Belt

      AUC·2010
    • QSB Quality System Basics

      G.M.E·2010
    • SQC Statistical Quality Control

      G.M.E·2009
    • Lean Manufacturing & SMED Techniques.

      Canadian Academy·2008
    • SPC Statistical process control

      G.M.E·2008
    • MSA Measurement Systems Analysis

      G.M.E·2008
    • Machine /Line Improvement Activities. Production Speed Strategy.

      PAC Group·2008
    • Lean Manufacturing & SMED Techniques

      PAC Group·2008
    • Internal Auditor

      PAC Group·2008
    • PPAP (Production Part Approval Process)

      G.M.E·2007
    • PFMEA (Process Failure mode and Effects Analysis)

      G.M.E·2006
    • Productivity Improvement.

      PAC Group·2006
    • Analyzing 7 wastes, Efficiency, Downtime.

      PAC Group·2006
    • Time & Motion study.

      PAC Group·2006
    • CAD/ CAM Software Unigraphics (UG NX3).

      Central Metallurgical Research Institute (CMRDI)·2005
    • CNC Machines Tooling & Inserts

      Walter Germany tooling (Win-Tech)·2005
    • Magnetic particle (MT) method including (level I , level II) according to the American society for nondestructive testing (ASNT)

      Central Metallurgical Research Institute (CMRDI)·2005
    • CAD/CAM Software Delcam software (Power shape, Power mill)

      Delcam England (Win-Tech)·2005
    • iquid penetrate (P T) method including ( level I , level II ) according to the American society for nondestructive testing (ASNT)

      Central Metallurgical Research Institute (CMRDI)·2005
    • GD&T Geometric Dimensioning and Tolerance.

      Central Metallurgical Research Institute (CMRDI)·2004
    Share this Profile