profile-img

khaled Mosaad Abdel Aziz Saad

electrical engineer at target technical services

Shubra, Cairo, Egypt

Work Experience

  • I&C EngineerFull Time

    Pesco

    May 2020 - Present -5 yrs, 3 months

    Egypt , Cairo

    • Job Details:•Troubleshooting and configuration for Allen Bradley PLC (1756-L73) using studio 5000 software and apply modification to achieve the required function during function test. •Troubleshooting and configuration of Siemens PLC (S7-1500) and HMI (KTP700) using TIA portal software. •Troubleshooting and configuration for PRSoft modules to communicate with different electrical devices and instruments through Modbus TCP/IP protocol •Using HART communicator (475&Trex) to configure pressure, temperature, flow and level instruments in the field. •Troubleshooting and configuration for SCADA stations using Factory talk software.
  • Control system engineerFull Time

    Gs E&c

    May 2019 - Feb 2020 -9 months

    Egypt , Cairo

    • Job Details:•Troubleshooting and configuration for Honeywell Experion PKS DCS (Series C-controller) using Experion PKS R430 software. •Troubleshooting for HIMAX ESD system using SILWORX software. •Troubleshooting and configuration for Bentley NEVADA (3500 vibration monitoring system) •Troubleshooting and configuration for the following PLCs Allen Bradley PLC (1756-L71&1756-L73) using RSlogix 5000 software. Mitsubishi PLC(FX5U) using MELSOFT SERIES GX works software. Siemens PLC (S7-1200&S7-400) using TIA portal and Sematic manager software •Responsible for following and supporting vendors during commissioning •Responsible for following and supporting operation team during start up, performance test and normal operation of different units.
  • electrical engineerFull Time

    target technical services

    Aug 2013 - Present -12 yrs

    Egypt , Cairo

    • Job Details:Projects: - Owner: PetroDara petroleum company o Hana Hana west petroleum station . • Project responsibilities 1- Design and implementation of control circuits and layout for panels. 2- Preparation as built drawings for control panel by using Auto Cad. 3- Preparation loop test and function test documentation 4- Perform loop test and function test of station. 5- Follow commissioning of station. 6- Follow operation of station for 3 months o South Arta and 3X stations • Project responsibilities 1- Design PLC program by using TIA program for Siemens S7-1200 2- Design control circuit and layout of panel 3- Measure and monitoring flow of liquid which go out from production tanks. 4- Measure and monitoring pressure and temperature for production tanks 5- Preparation of Loop test and function test documentation 6- Follow cable tries position and installations 7- follow pull cable works on the site 8- perform Loop test and function test of station 9- Follow commissioning of station. Owner: West Bakr petroleum company o K-south station • Project responsibilities 1- Design PLC program by using TIA program for Siemens S7-1200 2- Design control circuit and layout of panel 3- Measure and monitoring flow of liquid which go out from production tanks. 4- Measure and monitoring pressure and temperature for production tanks o K station • Project responsibilities 1- Design PLC program by using TIA program for Siemens S7-1200 2- Using modbus module for Siemens S7-1200 CPU to create communication trough RS-485 as a physical layer between S7-1200 CPU and remote I\O and sensors. 3- Design control circuit and layout of panel Owner: Total multinational corporation o Marsa alam airport station • Project responsibilities 1- Calibrate level transmitter to get required readings. 2- Maintenance of remote operated valves to avoid production leakage. 3- Periodic maintenance and testing for control panels on the site. o Suez station • Project responsibilities 1- Configuration and connection of High High alarm system. 2- Check and test liquid and vapor system . Owner: Ideal standard factory. •Project responsibilities 1- .Design layout of panel 2- Configuration weight system to make sure of desired weight setpoints. 3- Check and test panels on the factory. I got a good experience in control system design with its hardware manufacture skills, FAT, SAT,BOM, SCADA and instrumentation
  • electrical engineerFull Time

    SGA company (subcontractot to EMAS company)

    Apr 2012 - Jul 2013 -1 yr, 3 months

    Egypt , Cairo

    • Job Details:Position: Site Electrical engineer o Job responsibilities: - 1- Reading shop drawing and design and preparation of as built drawings. 2- Test power cables by measurement instruments. 3- Installation and Restriction of different works on the site. 4- MV and LV cables installation.
  • Education

    • BCS in communication and electronics

      Institute of Aviation Engineering and Technology (IAET)

      Jan 2004 - Jan 2009 - 5 yr

    • High School - Thanaweya Amma

      Abdel-Mon'em Ryad

      Jan 2003 

    Achievements

    o Hana Hana west petroleum station for Petrodara petroleum company. • Project responsibilities 1- Design and implementation of control circuits and layout for panels. 2- Preparation as built drawings for control panel by using AutoCAD. 3- Connecting sensors and panels on the site. 4- Design PLC program by using TIA portal program for PLC S7-1200 5- Follow commissioning of station. 6- Follow operation of station for 3 months

    Skills

    • SCADA
    • Microsoft Word
    • Microsoft Excel
    • Electrical Engineering
    • AutoCAD
    • PLC Programming
    • Classic Control
    • Instrumental Analysis
    • TIA portal
    • Aviation
    View More

    Languages

    • Arabic

      Fluent
    • English

      Fluent

    Training & Certifications

    • Control diploma

      HA consulting group·2015
    • control diploma

      HA consulting engineer ·2015
    • CCNA

      Telecom egypt·2011
    • ccna

      telecom egypt·2010
    • ICDL

      ISI·2010
    • basic avionics cours

      egyptian aviation academy·2009
    • Aircraft basic avionics course

      Egyptian aviation academy·2009
    Share this Profile