Khaled Youssef Marzouk
Mechanical/Piping Construction Manager
Sidi Gaber, Alexandria, EgyptWork Experience
Mechanical/Piping Construction ManagerFull Time
Al Asab General Transport and Contract inc
Oct 2019 - Sep 2020 -11 months
United Arab Emirates , Abu Dhabi
- Job Details:➢ Project Name: EPC for Asab phase II - Stagrl Project. ➢ Owner: Adnoc Onshore ➢ The strategy of the project is full development of a five fields to increase production from them and provide facilities to cater for their operations. ➢ Responsibilities: ● Multi-Selector Manifold (MSM) - 21 Nos. ● Gas lift Manifold Sots (GL) -24Nos. ● Produced Water Re-Injection Slots (PWRI) - 20 Nos. ● 27 Nos of Demolition Pipelines for length of 10 Kms (RDS-1,2&3) ● 14 Nos of Re-route Pipelines for a length of 3 KM (RDS-1,2&3) ● Installation of Hot Induction Bends and Cold Field Bends. ● Cleaning, gauging & Hydro testing of 3 Km pipeline. ● Approximate Piping/Pipeline Welding Joint quantity : 29,000 ● All Pipe Spool Prefabrication Works will be carried out in Asab Fabrication/ Welding Yard
- Mechanical/Piping Construction ManagerFull Time
IGCC/BGC
May 2017 - Aug 2019 -2 yrs, 3 months
Iraq
- Job Details:Responsibilities: ● Implementing a phased-approached program of rehabilitation, rejuvenation and expansion projects in South Iraq. ● Treat and monetize associated gas currently being flared from 3 southern oil fields to return the existing non-operational facility. ● FRR, ESDVs shall be added/replaced/restored to achieve functionality and isolation at battery limits.
MECHANICAL/PIPING CONSTRUCTION MANAGERFull Time
SIEMENS/ORASCOM
Jan 2016 - Oct 2016 -9 months
Egypt , Cairo
- Job Details:➢ Achievements: BURULLUS COMBINED CYCLE POWER PLANT 4800MW ➢ Responsibilities: ● Monitoring strategies for work plan for the overall project execution. ● Represent the discipline for frequent review and update meetings with the client to attend to any concerns and also to give an update on the development of work as scheduled. ● Frequently assess the subcontractors for their work and quality standards for them meeting the project specifications. ● Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and as per project specifications. ● Responsible for determining appropriate supplies and stock levels which are maintained to meet functional targets, both within cost restraints and consistent with suppliers' lead times.
Mechanical/Piping Construction ManagerFull Time
NBC/ARAMCO
May 2011 - Oct 2015 -4 yrs, 5 months
Saudi Arabia
- Job Details:➢ Achievements: UPSTREAM GAS PROJECTS (WELLHEAD) ➢ Responsibilities: ● Estimated and created budgets for construction projects. May 2011 - October 2015 ● Managed third party contractors including safety oversight, environmental design specification compliance, and similar construction specifications and requirements. ● Reviewed engineering designs, drawings, blueprints, and other related engineering documents to identify potential problems ahead of time and proactively implement solutions
Education
BSc Michanical Engineering in Mechanical
Alexandria University (ALEXU)Jan 1985 - Jan 1992 - 7 yr
High School - Thanaweya Amma
DomittaJan 1984
Languages
English
Fluent