profile-img

Karim Adel Emam

Senior Mechanical Engineer

6th of October, Giza, Egypt

Work Experience

  • Senior Mechanical EngineerFull Time

    Huhtamaki

    Dec 2021 - Present -3 yrs, 6 months

    Egypt , Giza

    • Job Details:• Build a maintenance program for all lines. • Plan all maintenance team activities. • Build spare parts warehouse • Spare parts control. • Supervision of mechanical maintenance activities ensuring the implementation of all scheduled activities • Introducing department KPI’s by collecting and analyzing data. • Supporting projects team in major mechanical activities. • Manage maintenance department procurement activities. • TPM ( Total productive manufacturing ) PM ( Planned maintenance ) pillar leader
  • Maintenance EngineerFull Time

    Frank Noe Egypt

    Dec 2018 - Nov 2021 -2 yrs, 11 months

    Egypt , Giza

    • Job Details:- Plan for the preventive Maintenance programs -The implementation of preventive maintenance programs; - The collection and entry of data necessary to update the facility and equipment management archive - The notification of obsolete equipment, with request for relevant elimination from assets; - That the quality of machine, equipment or plant maintenance operations, including those carried out by third parties, is in line with reference standards.
  • Parabolic Trough Collector (PTC) Sep 2017 -July 2018Freelance / Project

    Helwan University

    Sep 2017 - Jul 2018 -10 months

    Egypt , Cairo

    • Job Details:- The design and construction of a Parabolic Trough Collector (PTC) to be used as a concentrating solar power plant for steam generation , water desalination application and many other applications. - PTC project has been installed on the top of the mechanical engineering department building at Mattaryia faculty of engineering as a graduation project. - PTC project was Funded by the Egyptian Academy Of Scientific Research & Technology - PTC Project Grade: Excellent “97.5% “. Key Responsibilities : - Search the local market for the right materials with 3 of the team members. - Compare between the available materials and its cost & choose the best material for the project. - Take part in the construction phase with 3 of the team members . - To take part in the installation phase . - Take part in the pipline design with to of the team members. - Take part in the final presentation by talking about the future improvements & the 2nd phase . - Represent the team at the 5th Cairo International Exhibition of innovation with 5 team members. - Project over viwe : https://www.behance.net/gallery/70311619/parabolic-trough-collector(PTC)-(Solar-Energy-Project)
  • TarineeInternship

    French Motors Renault Motors

    Aug 2017 - Sep 2017 -1 month

    Egypt , Cairo

    • Job Details: Passenger car different periodic maintenance.  Fuel system  Wheel alignment.  Engine maintenance.
  • Education

    • Bachelor's Degree in mechanical engineering

      Helwan University

      Jan 2013 - Jan 2018 - 5 yr

    Activities

    • Technical team member at Helwan formula student racing team

      Student Activity

      Feb 2016 - Feb 2017 -1 yr

    Skills

    • maintenance planning
    • Hydraulic Systems
    • Pneumatic Systems
    • crystal reports
    • SolidWorks
    • Microsoft Office
    • Plastics Engineering
    • Automotive
    • Primavera P6
    • AutoCAD

    Languages

    • English

      Advanced

    Training & Certifications

    • Power BI: Dashboards for Beginners

      LinkedIn·2023
    • CMSE ( Certified Machinery Safety Expert )

      PILZ·2022
    • Excel Skills for Business: Essentials

      Coursera·2021
    • Project Planning: Putting It All Together

      Google·2021
    • Project Initiation: Starting a Successful Project

      Google·2021
    • Foundations of Project Management

      Google·2021
    • Root Cause Analysis

      RES Gobal·2021
    • Maintenance Planning and scheduling

      RES GLOBAL·2020
    • hydraulic power applications

      jelecom egypt·2017
    Share this Profile