profile-img

joseph noshy

Electrical power and workshops (mechanical & equipment) manager at Guardian Glass Egypt (Koch Industries)

10th of Ramadan City, Sharqia, Egypt

Work Experience

  • Electrical power and workshops (mechanical & equipment) managerFull Time

    Guardian Glass Egypt (Koch Industries)

    Dec 2008 - Present -16 yrs, 7 months

    Egypt , Cairo

    • Job Details:1- Full commitment with company safety vision. 2- Full commitment with company guiding principles. 3- Following the proactive maintenance execution of critical power assets equipment to maintain it reliable and effective all time MV breakers, transformers, Diesel generators and ATS system. 4- Stay a line with compliance for the power factor 100%. 5- Ensure the quality of the work that comes out of the workshops. 6- Plan and organizing the work between shift crews, area managers, area engineers, following up maintenance shifts daily report, and consequently issues work instructions to dedicated shift. 7- Applied the battery conductance measurement program to follow the status of UPS batteries 8- Crib optimization process by doing a plan to review the spare parts. 9- Power saving plan as we saved about 10% of power consumption in 2021. 10- Train engineers and technicians on electrical system details to avoid delays at any emergency and save assets. 11- Verifies monthly department KPIs. 12- U.P.S installation and maintenance including batteries. 13- All single line diagram traces, M.C.C maintenance, motors test and inspection. 14-Forklift electric wiring, alternator & starter motor trouble shooting. 15- Flood batteries test and replace. 16-Cheller and air condition electric wiring & trouble shooting.
  • Site EngineerFull Time

    Orascom Construction & Industrials ``Ready Mix Egypt``

    Nov 2005 - Nov 2008 -3 yrs

    Egypt

    • Job Details:1-Managing the entire operation of concrete batch plant (Liebherr, Elba, Johnson, Oru). 2-Managing skilled staff, maintenance and repairs of concrete plant equipments. 3-Installing and upgrading concrete batch plants, contactors, relay protection systems, transformers, and electrical feeders. 4-Managing the process of getting the plant on line, connected and communicating properly 24/7. 5-Assisting with troubleshooting automation systems, motors, protective devices, PLC logic, instrumentation and other electrical equipment as part of concrete batch plant operations.
  • Electrical EngineerFull Time

    Middle Eastern Company ``Bio Cleana``

    Jan 2004 - Oct 2005 -1 yr, 9 months

    Egypt

    • Job Details:1-Handling electrical maintenance for low voltage including (load Distribution for the factory, phase equilibrium specially during adding new loads as (new packaging machines, air conditioners ….etc) and adding the safety devices suitable for it). 2-Desiging, maintaining automatic control circuits. 3-Operating, maintaining packaging machines including -Drawing all the designs for automatic control circuits for this machine because there have been shortage in clarifications for these circuits in the catalogues. -Maintaining all electrical parts on it as heaters. -Adjusting the safety equipments to be suitable for operating situations. -Maintaining all mechanical parts on it as (air pistons, gusseting, conveyors, filling parts).
  • Electrical EngineerFull Time

    Cairo Electricity

    Jan 2003 - Dec 2003 -11 months

    Egypt

    • Education

      • Bachelor's Degree in Bachelor of Science in Electrical Engineering

        Faculty of Engineering

        Jan 1997 - Jan 2002 - 5 yr

      • High School - Other

        donbosco

        Jan 1994 

      Achievements

      • Design and connect wiring circuit to running ten air conditioner central units by calling telephone line for each unit. • Overall maintenance and changing oil for eleven medium voltage transformers 2MVA. • Install complete UPS system 200 KVA and his batteries instead of fail one. • Connect generator for filtering system to wake up and loading when power down and when power come back the loads moving to utility and generator going to sleep mode automatically (compliance issue). • Installing and upgrading concrete batch plant system and overall repair included contactors, relay protection systems, transformers, and electrical feeders.

      Skills

      • computer
      • Electrical Control
      • mobil
      • Commerce
      • AutoCAD
      • Planing
      • Training
      • PLC

      Languages

      • Arabic

        Fluent
      • Italian

        Advanced
      • English

        Advanced

      Training & Certifications

      • -PMP

        (ITA & IEC )·2011
      Share this Profile