profile-img

Joel Arandia Luna

ELV, Low Current

Philippines

Work Experience

  • Electrical Coordinator (LOW CURRENT) Full Time

    Cobel Contracting Nigeria Ltd. – subsidiary of CFE Int’l.

    May 2015 - Present -10 yrs, 1 month

    Nigeria , Lagos

    • Job Details:* Review shop drawing prior to submittal for service coordination and coordination with other construction elements. * To advice on any impact on services caused by Architectural changes and raise Query to Technical Manager & Consultant. * Review material/equipment technical submittals from contractor for specification compliance. * Review of method statements with respect to installation works and logistics for equipment positioning. * To liaise with Construction Manager on matter seeking advice/requiring assistance. * Ensuring that services provisions clearance is provided in time for structure. * To oversee installation under civil contractor scope of works. * Close inspection for contractor installation works. * Carry out site walks and inspection for service installation, identifying poor quality elements and advise construction and MEP Team. * Carry out inspection for Contractor material along with QA/QC and Consultant. * Ensure that site instruction/ NCR are closed out. * To inspect concealed installation prior to closure of void /riser etc. in conjunction with QA/QC and obtaining consultant sign off.
  • QA/QC Electrical EngineerFull Time

    Saudi Oger Ltd. (SOL)

    Oct 2009 - May 2015 -5 yrs, 7 months

    Saudi Arabia , Riyadh

    • Job Details:* Conduct site survey prior to design execution to assist engineering department in case of any modifications and/ or extensions. * Review and implement designs in conformance with specifications and standards (ISO, NFPA, BICSI) and analyze soundness of the design scope. * Following up approval of execution drawings and material submittal sheets prior to any electrical works. * Supervision and Monitoring of work progress and generates reports for the management. * Adept and update with the most recent building / construction and government rulings as well as in project estimation. * Testing & Commissioning upon project handling to the client’s representative in cooperation with maintenance department.
  • Design Specialist/ Presales EngineerFull Time

    Diversified Tech Solutions Int’l, Inc.

    May 2006 - Oct 2009 -3 yrs, 5 months

    Philippines , Makati City

    • Job Details:* Designs of Network Infrastructure and Structured Cabling Projects and its technical facilities. * Also designs of Building Electronics Security Solutions Projects and its technical facilities. It includes all the pre-sales works on CCTV and Access Control System. * Prepare solution proposals, project bidding documents and specifications preparations. * Support sales team on proposal and solutions to customers. * Generates bill of materials for quotations. * Assist sales in gathering 3rd party pricing and liaising with 3rd parties, if required. * Set meetings with client to understand requirements and come out with a proposal.
  • Sr. Project Engineer Full Time

    Tricom Systems (Phils), Inc.

    Sep 1996 - May 2006 -9 yrs, 8 months

    Philippines , Makati City

    • Job Details:*Designs, installation, and commissioning of PABX System (IWATSU, Panasonic), Voice Mails and other peripherals for building communication. * Responsible for the design and project implementation of Network Infrastructure and Structured Cabling Projects and its technical facilities. * Support sales team on proposal and solutions to customers. * Prepare solution proposals, project bidding documents and specifications preparations. * Generate Bill of Materials for quotations. * Assist sales in gathering 3rd party pricing and liaising with 3rd parties, if required. * Meet customers to understand end-user requirements and come out with proposals. * Ensure that all assigned personnel are coordinating their activities with other project participants, and that the requirements of the Contract are being satisfied. * Responsible for planning, scheduling, conducting and coordinating the technical and management aspects of projects. * Provide updates on schedule, including forecasting, and assist in preparing management reports and attending project meetings. Maintain documentation to support deviations from the baseline plan and method statement. v Communicate regularly with the project controls management team to ensure the overall project schedule is understood and any significant deviations from the plan are brought to the attention on the Project Controls Manager. * Communicate regularly with all disciplines and groups to ensure accuracy of inputs to the schedule. Participate in interface meetings. * Monitors work for compliance to applicable codes, accepted engineering practices, and standards. * Ensures effective communication and coordination on assigned projects between all disciplines and all other project participants.
  • Education

    • BSc in Electronics and Communications Engineering

      Feati University

      Jan 1990 - Jan 1995 - 5 yr

    • High School - Other

      Bicol University (School of Arts & Trades)

      Jan 1990 

    Skills

    • Low Voltage
    • Microsoft Office (Word, Excel, Powerpoint, etc...)
    • Photography
    • Access Control
    • Structured Cabling
    • Project Engineer
    • Adobe Photoshop
    • AutoCAD
    • QA/QC Engineer
    • PLC
    View More

    Languages

    • English

      Advanced
    • Arabic

      Intermediate
    • French

      Beginner
    Share this Profile