
Islam Mahmoud
Project, Planning, PMP, Mech Engineer,
Alibrahimiyyah, Alexandria, EgyptWork Experience
Maintenance Planning SupervisorFull Time
Amreyah Cement Company, InterCement Company
Jun 2018 - Present -7 yrs, 1 month
Egypt , Alexandria
Project engineerFull Time
Amreyah Cement Company
Apr 2009 - Jun 2018 -9 yrs, 2 months
Egypt
- Job Details:Project Leader, PMO, Ameryah Cement Co., InterCement, Alex, Egypt, (April '13 till Present): - Coal Mills: Control and monitor the progress for mega project 46 M €, follow up mechanical erection works. - Kiln preheater calciner modification: Manage production line modification. - Revamping Bag filters: Manage midway project 2 M €, re-plan pending project schedule, Cost control, negotiating and contracting local contractors to the project, controlling project risks in minimal level, quality control on the supplied equipment, monthly progress reporting (Contractor S-curve), issuing Punch list. - Alternative Fuel Feeding system: Collecting stakeholders’ requirement, preparing Call for Tender, negotiating & evaluating the technical/commercial offers, contract modifications, managing stakeholder engagement for 6 M € project. - Performing feasibility studies for several projects (replacing the existing EP filters by bag filters, Coal feeding system). - Existing Alternative fuel system: studying the availability for increasing system feeding. - Prepare and Review monthly investment reports for management. - Energy Management: Leading Energy Team in order to apply ISO 50001, minimize energy resources. Planning Engineer, Ameryah Cement Co., CIMPOR Group, Alex, Egypt,. (April '09 till April ‘13): - Preventive maintenance: Lead and supervise major shutdown plans & schedules for Kiln shut down. Using SAP ensuring optimum usage of all resources including manpower, time and materials. - Manage maintenance backlog. - Following up all maintenance jobs & assigning the related spare parts & contractor Man power on it. Verify that materials are available at site before the mobilization of people for the concerned activity & monitoring deadlines. - Spare Parts: Following up with the purchasing Dept; studying its related Quotations (technical analysis), provide technical clarifications for Suppliers & manufacturers, performing quality control on the supplied spare parts. - Bill Of Material: Updating the BoM on SAP for production line’s equipment, Keep library updated and ensure equipment documentation is permanently updated “as built”. - Develop the MRP system: Manage / Optimize Spare Parts inventory. - Follow up of Budget/Actual on monthly basis.
Education
Bachelor in Mechanical engineering in Power mechanics
Alexandria University (ALEXU)Jan 1999 - Jan 2004 - 5 yr
High School - Thanaweya Amma
Moustafa Kamel Secondary SchoolJan 1998
Skills
Languages
Arabic
FluentEnglish
IntermediateFrench
Beginner
Training & Certifications
PMI-ACP
Project Management Institute·2020Risk Management Professional
AUC·2015Six Sigma, Yellow Belt
Sigma study·2015PMP
project management institute·2015PMP (Project Management Professional)
AUC·2014Feasibility study, financial model,
WISE, Brasil·2013Root cause analysis, and Problem solving
CIMPOR·2011SAP PM, MM
CIMPOR·2010