profile-img

Islam Mahmoud

Project, Planning, PMP, Mech Engineer,

Alibrahimiyyah, Alexandria, Egypt

Work Experience

  • PMO ManagerFull Time

    City Cement Company

    Oct 2022 - Present -2 yrs, 9 months

    Saudi Arabia , Riyadh

    • Planning HeadFull Time

      Flsmidth

      May 2021 - Oct 2022 -1 yr, 5 months

      Saudi Arabia , Yanbu

      • Maintenance Planning SupervisorFull Time

        Amreyah Cement Company, InterCement Company

        Jun 2018 - Present -7 yrs, 1 month

        Egypt , Alexandria

        • Project engineerFull Time

          Amreyah Cement Company

          Apr 2009 - Jun 2018 -9 yrs, 2 months

          Egypt

          • Job Details:Project Leader, PMO, Ameryah Cement Co., InterCement, Alex, Egypt, (April '13 till Present): - Coal Mills: Control and monitor the progress for mega project 46 M €, follow up mechanical erection works. - Kiln preheater calciner modification: Manage production line modification. - Revamping Bag filters: Manage midway project 2 M €, re-plan pending project schedule, Cost control, negotiating and contracting local contractors to the project, controlling project risks in minimal level, quality control on the supplied equipment, monthly progress reporting (Contractor S-curve), issuing Punch list. - Alternative Fuel Feeding system: Collecting stakeholders’ requirement, preparing Call for Tender, negotiating & evaluating the technical/commercial offers, contract modifications, managing stakeholder engagement for 6 M € project. - Performing feasibility studies for several projects (replacing the existing EP filters by bag filters, Coal feeding system). - Existing Alternative fuel system: studying the availability for increasing system feeding. - Prepare and Review monthly investment reports for management. - Energy Management: Leading Energy Team in order to apply ISO 50001, minimize energy resources. Planning Engineer, Ameryah Cement Co., CIMPOR Group, Alex, Egypt,. (April '09 till April ‘13): - Preventive maintenance: Lead and supervise major shutdown plans & schedules for Kiln shut down. Using SAP ensuring optimum usage of all resources including manpower, time and materials. - Manage maintenance backlog. - Following up all maintenance jobs & assigning the related spare parts & contractor Man power on it. Verify that materials are available at site before the mobilization of people for the concerned activity & monitoring deadlines. - Spare Parts: Following up with the purchasing Dept; studying its related Quotations (technical analysis), provide technical clarifications for Suppliers & manufacturers, performing quality control on the supplied spare parts. - Bill Of Material: Updating the BoM on SAP for production line’s equipment, Keep library updated and ensure equipment documentation is permanently updated “as built”. - Develop the MRP system: Manage / Optimize Spare Parts inventory. - Follow up of Budget/Actual on monthly basis.
        • Education

          • Bachelor in Mechanical engineering in Power mechanics

            Alexandria University (ALEXU)

            Jan 1999 - Jan 2004 - 5 yr

          • High School - Thanaweya Amma

            Moustafa Kamel Secondary School

            Jan 1998 

          Skills

          • Microsoft Office
          • SAP PM, MM, IM
          • Construction
          • Engineering
          • PMO
          • Project Management
          • Project Manager
          • Project

          Languages

          • Arabic

            Fluent
          • English

            Intermediate
          • French

            Beginner

          Training & Certifications

          • PMI-ACP

            Project Management Institute·2020
          • Risk Management Professional

            AUC·2015
          • Six Sigma, Yellow Belt

            Sigma study·2015
          • PMP

            project management institute·2015
          • PMP (Project Management Professional)

            AUC·2014
          • Feasibility study, financial model,

            WISE, Brasil·2013
          • Root cause analysis, and Problem solving

            CIMPOR·2011
          • SAP PM, MM

            CIMPOR·2010
          Share this Profile