profile-img

Ireen Karam

Procurement and contract Manger at egis

Heliopolis, Cairo, Egypt

Work Experience

  • Procurement and contract MangerFull Time

    egis

    Jan 2020 - Present -5 yrs, 5 months

    Egypt , Cairo

    • Job Details:Management of Projects and Contracts of the construction works based on FIDIC’s conditions, and preparation of Tender and bids. Contracts Procurement pre award: helping Clients to prepare the Procurement Strategy, preparing pre-qualification documents, RFP Tender documents including Contract and BOM’s as required and evaluate the tenderers. Post award Contract Management: signing, negotiation Project Management during Construction, Preparing Sub-consultants, and Sub-contractors Agreement, prepare project insurance, advance payments, bank guarantees, check Project Programme and Contractual Milestones, Prepare PMC invoices and Review the Contractor’s payment invoices, overall cash flow. Projects: • UAE Oman Railway Link • Blue Tree Residential-Mixed use Buildings • Abo Qir Metro line, Alex. • Cairo Metro Line 6 • Q-Express Technical Advisor Lead (TAL) Stages 3 and 4 (Projects Magnitude: up to 5 Billion USD) Clients: NAT, Oman Etihad Rail, Sky developments Contract FIDIC based contracts
  • MEP Proposals and commercial team LeaderFull Time

    Orascom

    Jan 2020 - Jan 2022 -2 yrs

    Egypt , Cairo

    • Job Details:MEP Tender and Proposals Manager 2020 – 2022 Projects:  Silversands, North coast  New capital Telecom Egypt building, Egypt.  Al Almain towers north coast, Egypt.  New capital R5, Egypt  Airbase maintenance hangers, KSA.  Potato factory eloainat (Projects Magnitude: up to 1 Billion USD) Clients: General Authority of Civil Aviation KSA, Emaar, Telecom Egypt, GIS, ORA developments and NUCA Contract FIDIC based contracts. Activities performed: Bid stage:  Prepare project analysis to make bid or no bid decision.  Analyz Contracts conditions and aspects.  Address all contractual issues, legal and commercial terms, and conditions.  Review the Design, Specs and Programme and prepare BOQ accordingly.  Prepare preliminary Design and configuration, as necessary.  Prepared BOQ’s, contact suppliers and subcontractors get quotations.  Prepare the Technical proposal along with the Financial proposal, finalize them in accordance with clients' requirements. After award:  Prepare breakdowns and BOM’s according to Contract aspects.  Prepare suppliers & subcontractors comparison to select suppliers and subcontractors, Contact the selected suppliers, Vendors, and subcontractors to negotiate pricing and payment terms.  Collaborate with the operation and project control teams to maintain bid stage cost and monitor base line Programme.  Prepare Change Orders, Variations and Claims
  • Electrical TenderFull Time

    Contrack International, Inc

    Jan 2005 - Jan 2020 -15 yrs

    Egypt , Cairo

    • Job Details:Projects:  North Coast Marassi Beach club and villas.  Elmelaiz airbase” BARDAWEIL international airport, Sinai Egypt.  US embassy information Technology Infrastructure Rehab, Egypt  Peace Vector VII, Package A, Cairo West Air Base, Egypt.  F-16 Support Facilities, Package 10, Balad Air Base, IRAQ.  Army Prepositioned Stocks, (APS-5) Power Plant, Camp Arifjan, Kuwait.  P-990 Medical Dental Clinic Replacement NSA, Bahrain.  C-17 Fuel Cell Nose Dock Hangar Hickam Air Force Base, Hawaii.  Control Tower and Ramps Bagram Air Base, Afghanistan.  Weill Cornell Medical College Doha, Qatar.  ANA Camp Scorpion SOF Training Facility Kabul, Afghanistan.  R-0052_Fuel line Al Dhafra Airfield UAE.  RSLFAC CH-47 Facilities Tabuk, KSA  CH-47 Bed Down Facilities, KSA Activities performed: Bid stage:  Study RFP and drawings and prepare WBS RFI's  Analyze Contracts conditions and aspects.  Review the Design, Specs and Programme and prepare BOQ accordingly.  Prepare preliminary Design and configuration, as necessary.  Prepared BOQ’s, RFQ’s contact suppliers and subcontractors to get quotations.  Prepare the Financial proposal, finalize them in accordance with clients' requirements. After award:  Prepare suppliers & subcontractors comparison to select suppliers and subcontractors, Contact the selected suppliers, Vendors, and subcontractors to negotiate pricing and payment terms.  Collaborate with the operation and project control teams to maintain bid stage cost and monitor base line Programme.  Check Project Programme and Contractual Milestones and Prepare list of delayed milestones and risks.  Prepare Change Orders, Variations and Claims  Follow up the Contract & Claim Management
  • Education

    • Bachelor's Degree in Engineering

      Ain Shams University (ASU)

      Jan 2004 

    Skills

    • Project Management
    • Bid Management
    • Tendering
    • Procurement
    • Project Coordination

    Languages

    • English

      Intermediate

    Training & Certifications

    • PMP

      PMI·2020
    Share this Profile