IK

imran khan

Construction Manager at afac construction company

Work Experience

  • Construction Manager

    al yamama construction company

    Aug 2022 - Sep 2023 -1 yr, 1 month

    • Job Details:Overseeing and directing construction projects from conception to completion. Structural & finishing work execution of g+5 annex building, visitor center, irrigation tank, solar panel foundation with battery buildings, hard & soft landscaping. Block work, insulation work, plastering work, wet area waterproofing work flooring work, solid paint, glass cladding work, roof area waterproofing work. Safety regulation, quality control standard, environmental requirement. Meeting held with engineering team & sub-contractors for quality & cost. Coordinate with sub-contractor activities to achieve safely & successful project delivery. Reviewing the project in-depth to schedule deliverables and estimate costs. Ensure project budgets, work undertaken are in compliance with contractual obligation. Three weeks look ahead schedule meeting every week with site team. Reviewing the shop drawing, contract document and variation orders as per the revised BOQ, vetting of contractor’s interim payment certificates.
  • Construction Manager

    lighton contracting company

    Dec 2018 - Aug 2025 -6 yrs, 8 months

    Qatar

    • Job Details:Supervision of tunnel work (0.8 km) for people mover system. Supervision of PMS rail track, underground power substation construction. Supervising of PMS track construction works as per the contract specifications. Supervision of raft foundation, grade slab of commercial complex, block work, plastering work, solid paint of internal & external wall, coordinating with the consultants. Preliminary documentation works prior to start work and in progressive period. Quality control of material & inspections for civil works. Supervised job: supervising of junior engineer’s work. Supervision of material & profile of road technical data sheet. Supervision of waterproofing for pier foundation. Preparation of weekly & monthly progress reports. Assembling the records for all executed works. Updating about the project status to the project manager by daily reports. Reviewing the shop drawing, contract document and variation orders.
  • Senior Structure Engineer

    maytas construction company

    Aug 2011 - Jul 2016 -4 yrs, 11 months

    • Job Details:Supervision of structural work of villas g+1+pent house work, front precast wall as per approved structural designed drawings and material. Supervision of block work, insulation work plastering work, flooring work, solid paint, metal work, wet area waterproofing work. Supervising the officer villas works as per contract specifications. Coordination with dar al-riyadh and aaw officials. Preliminary documentation works prior to start work and in progressive period. Quality control over material for civil works. Technical head for the manpower recruitment by the company side and recruited almost 2500 skilled & unskilled manpower for civil works. Supervised job: senior structure engineer of SBC, ETABS, PROKON, AutoCAD software’s. Supervision of material technical data sheet. Supervision of waterproofing in wet areas and roof. Supervision of distribution of underground water tanks. Preparation of weekly, monthly, quarterly and yearly progress reports. Conduct meeting with contractors to improve the quality & progress. Assembling the records for all executed works. Keep updating the project manager through frequent reports. Reviewing the shop drawing, contract document and variation orders as per the revised BOQ, vetting of contractor’s interim payment certificates. Assigning the duties of inspectors & surveyors for road field density test.
  • Site Engineer

    masco construction company

    Aug 2008 - Jul 2011 -2 yrs, 11 months

    • Job Details:Supervision of site works as per approved designed drawings and works schedule. Supervising the works as per contract specifications. Coordination with Saudi Aramco, royal commission officials. Preliminary documentation works prior to start work and in progressive. Supervised job: site engineer for yanbu (al-sanaiya) infrastructure in northern area. Site engineer for concrete work of culverts, structure footing & installation of pipe line of PW, PRW, IW & SS with precast valve chamber, telecom manhole. Supervision of substation - 380kv & 33kv, 13.8kv line in industrial zone (yanbu). Supervision of distribution project of underground high-tension line. Site engineer for 22-lift station of IW & SS. Supervision of switch rack, steel structure & GRP manhole installation. Supervision of electrical & telecom duct bank installation with concrete casting. Supervision of pre-hydro test for GRP and PVC class -V pipe for PW, PRW, SS, IW. Supervision of pre-cast traffic signal foundation & pole installation. Preparation of weekly & monthly progress reports. Conducting meeting with contractor to improve the quality & quantity. Assembling the records for all executed works. Keep on informing the project manager through daily reports. Earth work cutting & backfilling 120 million m2 with crusher.
  • Education

    • Bachelor's Degree in Civil Engineering

      JNT University

      Jan 2008   17 yr 7 Months

    • Diploma in Civil Engineering

      quli qutub shah, govt. polytechnic

      Jan 2002   23 yr 7 Months

    Skills

    View More
    Share this Profile