
Karim Ayman
BIM Coordinator at TEA
Shubra, Cairo, EgyptWork Experience
BIM CoordinatorFull Time
- Job Details:I participate in projects as: ❖ BIM Coordinator in O-West Zone 1A & 1D, (Total b uilt area for this project. is approximately (1000 Faddan which equals 4,200,000m2) distributed between 19000 residentialunits. ❖ Main Coordinator & Instructor inEngineering Authority Training Program ❖ Structural BIM Team Leader in the Grand Egyptian Museum (GEM) ❖ Structural BIM Team Leader in Al-Esayi Plaza Hotel (The project consists of G+13 floors with 178-room, 77- unit, studio,1 and 2-bedroom serviced apartments with a total built-up area of 14,105 square meters spread over a land area of 3,100.50 square meters with other associated facilities) ❖ Structural BIM Engineer in Solar Boat in Grand Egyptian Museum (GEM) ❖ Structural BIM Engineer in King Abdullah Financial District (KAFD)
Bim engineerFull Time
- Job Details:9 I am responsible for modeling, coordination, Quantity Surveying, Solving technical issues, Interior modeling, analysis of concrete structures& design it and BIM Automation for enhancing workflow according to a company system. I participate in projects as a BIM Engineer such as: ▪ KingSalman University. ▪ Embassyof The Republic of Singapore ▪ League of Arab States ( Extension ) ▪ SmouhaGrandViewCompound ▪ President’s Lounge ( Abdel Fattah Sisi ) ▪ El galala University ▪ TheGraeco–RomanMuseum ▪ AlBuruj Mosque
Education
Bachelor's Degree in Civil engineering
Thebes AcademyJan 2017
High School - Other
Shubra Secondary SchoolJan 2012
Languages
English
Intermediate
Training & Certifications
ACP
Autodesk·2019UTW
ECG·2017