Basic Info

Gerges ibrahim

13 years

Cairo, Egypt

Bachelor's Degree

Manager

Work Experience

Maintenance manager at Fresh electric for home appliances

Experience Details

Maintenance manager

Installation/Maintenance/Repair

Manager

1 from may 2008 to NOV 2010
responsibility
1 Makes necessary PLC backups for all programs used in machines and controls.
2 ( plc programming) using ls and fatek plc,s and touch screen
3 Initiates and carries out projects that improve efficiency and/or reduce operating costs.
4 Designs, builds and maintains electrical control systems, machinery and equipment

2 from NOV 2010 to may 2013 washing machine factory

1 Preparation of preventative maintenance plans and programs

2 Assists with hiring of maintenance personnel.

3 Communicates regularly with all maintenance engineers and technicians, both individually and as a group, to ensure good two-way communication concerning maintenance issues

4 Oversees inspection and electrical maintenance programs
Coordinates with spare parts store supervisor to ensure that sufficient stock of electrical / electronic components is available and maintained.

5 Modifies machine programs or new programs for better performance of machine operation according to instructions of Production Manager.

6 Makes necessary PLC backups for all programs used in machines and controls.

7 Trains electrical technicians to troubleshoot possible electronic defects and to obtain better understanding of their job.

3 from may 2013 to NOV 2015 foam (EPS) factory


1 Maintains records and completes required reporting. Order parts, supplies and equipment as needed.
.
2 Develops annual operating budget and plans for maintenance and capital improvement projects.

3 Plans and budgets for additional or replacement capital equipment.

4 preventive maintenance for the utility in the plant Air Handling Unit System, chiller , generators , closed control unit ,water pumps , steam boiler , air compressor , air dryer, cooling tower , vacuum pump .

5 Responsible for Electrical and mechanical Technicians

6 preventive and corrective maintenance for the EBS machines and all utility

7 create a backup system for all controller in the plant and create new program for the required machines using plc ( s7 200 – LG – fatek – RS automation ) and touch screen

8 Hiring and Training New Staff.

9 installation for new factory low voltage panel, steam line, air line, and all utilities

10 prepare and negotiate new agents to purchase the new machines for new factories
4 from may NOV 2015 up till now deep freezer factory

1 install a new production line for the deep freezer factory including the cpt room using pico software .

2 install a charging machine using Galileo machine ( r600 & r134a) and its safety system (alarm and blowers)

3 install foaming machine canon from old factory in Italy

4 modification in the auto line machine to increase the number of the mold (touch screen &plc)

5 Makes necessary PLC backups for all programs used in machines and controls (op17 & op7 simens screen and plc simens ( s7 300 &s7 200)

6 install and repair a recovery machine helium recovery to check the capillary cross section area using plc simens s5 .

7 maintain the charging machine (agramkow- galilio - rockall).

8 maintain the leak detector machine

9 repair the vacuum pump

10 repair a lot of type of the mixing head
11 repair the chillers
12 purchase the original spare part from the agent or from the orgin.





Company Details

Fresh electric for home appliances

Cairo, Egypt

N/A

Manufacturing

www.fresh.com.eg

May 2008 to present (9 years 5 months)
Cite engineer at Egy pro

Experience Details

Cite engineer

Installation/Maintenance/Repair

Experienced (Non-Manager)

electrical maintenance engineer @ Vodafone 6 horizon

responsible for

1 Leads and Supervises the electrical section in maintenance related jobs, provides assistance in trouble shooting, issues reports on major failures and recommends suitable actions to minimize or eliminate recurrence of the problems, formulates preventive maintenance schedules and associated procedures and checklists, formulates training program for electrical technicians.

2 Develops training materials and other quality documentation.

3 Reports to the Operations Manager on a daily basis.

4 Responsible for Electrical Technicians

5 preventive maintenance for the utility in the plant Air Handling Unit System, chiller , generators , closed control unit ,water pumps

6 Plans and prepares periodical preventative maintenance schedule at the beginning of each year

7 Continuously reviews requirement of spares for various activities against availability and makes requisitions for changes or new stock for equipment and machinery in the plant.




Company Details

Egy pro (multinational)

Giza, Egypt

501-1000 employees

Construction - Industrial Facilities and Infrastructure

N/A

Apr 2006 to May 2008 (2 years 1 month)
Production engineer at Sega m for electrical product

Experience Details

Production engineer

Manufacturing/Production

Experienced (Non-Manager)

production Engineer responsible for

1 Supervising production activities maintenance, process and quality control activities to obtain
optimum production and utilization of human resources, machines, and equipment.

2 lead the production team and improve their level by continuous training and guiding

3 Control to ensure that product meets required specifications.

4 Develops operating methods and procedures to improve product quality and productivity.

5 Design layout of equipment and workspace.

6 Help company increase productivity.

7 Provides technical support for process control and operations of manufacturing equipment.

8 Ensure that all activities are carried out according to the safety procedures.


Company Details

Sega m for electrical product

Cairo, Egypt

101-500 employees

Manufacturing

N/A

Sep 2004 to Apr 2006 (1 year 7 months)

Achievements


1 create a new program for bending machine using fatek plc and normal screen

2 create a new program for cutting machine for the electric water heater factory

3 create a new program for the shape molding machine at the foam factory using ls controller and touch screen


install new ups and data room at Vodafone 6 October


1 install the EPS factory in Georgia A electric cables and panels B air system compressor and dryers C steam system boilers and pipes D cooling towers and water pumps 2 disassembly the refrigerator factory from Italy . 3 purchase a new EBS machine from china to our project in Ethiopia.

Education

electerical power in Engineering

Education Details

electerical power

Engineering

Banha University, Egypt

Not specified

N/A

N/A

Banha University
1998 - 2004
High School - Other

High School Details

Other

soultan ben ali elawes

Egypt

1998

A / Excellent / 85 -100%

five years industrial school

soultan ben ali elawes
1998

Training and Courses

Training/Course Details

PMP

Jun 2014

manage training center

N/A

Training/Course Details

micro controller

Jul 2012

jelecom training center

N/A

Training/Course Details

fire alarm

Sep 2007

jelecom traning center

conventional fire alarm

Training/Course Details

classic control

Aug 2004

donbosco institute

N/A

Training/Course Details

programmabel logic control (plc)

Mar 2005

jelecom training center

using LS controller

Training/Course Details

finance for non finance

Aug 2014

logic training center

N/A

This profile is not updated!
Last update more than 2 months ago.

Jobseeker photo

Profile Skills and Keywords

Cite EngineerClaasic ControlClassic ControlCommunicatorConstructionConstruction - Industrial Facilities And InfrastructureConventional Fire AlarmCreativeEgy ProEngineeringEnglishEstimation CardFinance For Non FinanceFire AlarmFootballInnovativeInstallationInternetLeaderMaintenanceMaintenance ManagerManufacturingMicro ControllerMicrocontrollersMicrosoft ExcelMicrosoft OutlookMicrosoft ProjectOperationsPLCPMPPing PongPlc And HMI ProgrammingPresentation SkillsProblem SolverProductionProduction EngineerProgrammabel Logic Control (plc)Project ManagementRepair

Self-assesed Skills

Languages

English

English

: Fluent

: Fluent

: Advanced

: Advanced

Tools and Technologies

PLC

PLC

: Expert

: Extreme - I love it!

:

5-7 years

claasic control

claasic control

: Expert

: Extreme - I love it!

:

5-7 years

Internet

Internet

: Expert

: Extreme - I love it!

:

More than 7 years

Microsoft Excel

Microsoft Excel

: Advanced

: High

:

More than 7 years

Microsoft Outlook

Microsoft Outlook

: Advanced

: High

:

5-7 years

conventional fire alarm

conventional fire alarm

: Intermediate

: High

:

Less than 1 year

Microcontrollers

Microcontrollers

: Intermediate

: High

:

1-3 years

Presentation Skills

Presentation Skills

: Intermediate

: High

:

3-5 years

Microsoft Project

Microsoft Project

: Beginner

: Medium

:

Less than 1 year

Project Management

Project Management

: Beginner

: High

:

Less than 1 year

Fields of Expertise

maintenance

maintenance

: Expert

: High

:

5-7 years

plc and HMI programming

plc and HMI programming

: Expert

: High

:

3-5 years

construction

construction

: Advanced

: High

:

3-5 years

Key Skills

Leader, Communicator, Creative, Problem Solver, Innovative

Online Presence

gerges_mesak

gerges is looking for new exciting career opportunities… Please share…

Get Your own Wuzzuf Profile Now !

Employer? If you're representing an organization or an enterprise, Signup here for FREE to see Gerges 's full profile and find more great talent and professionals to join your team.