profile-img

Karim Ragab Hassan

electrical engineer

Riyadh, Saudi Arabia

Work Experience

  • Distribution EngineerFull Time

    EMTYAZ ELOROBA COMPANY

    Jul 2014 - Present -10 yrs, 11 months

    Saudi Arabia , Riyadh

    • Job Details:Supervise the work of construction for underground and overhead Distribution Network Such as:  Installation of underground distribution system (MV and LV) cable.  Installation ,operation &maintenance; of underground and overhead Distribution Network (MV panels – LV Panels, Distribution Boards, Transformers, RMU, 13.8KV PAKAGE SUBSTATIONS, 13.8KV UNIT SUBSTATIONS, and various protection systems).
  • Distribution EngineerFull Time

    EMTYAZ ELOROBA COMPANY

    Jul 2014 - Present -10 yrs, 11 months

    Saudi Arabia , Riyadh

    • Job Details:Supervise the work of construction for underground and overhead Distribution Network Such as:  Installation of underground distribution system (MV and LV) cable.  Installation ,operation &maintenance; of underground and overhead Distribution Network (MV panels – LV Panels, Distribution Boards, Transformers, RMU, 13.8KV PAKAGE SUBSTATIONS, 13.8KV UNIT SUBSTATIONS, and various protection systems).
  • instrumentation engineerFull Time

    Electronic construction service (ECS)

    Apr 2013 - Jul 2014 -1 yr, 3 months

    Egypt , Cairo

    • Job Details:Be responsible for testing, maintenance, and repair of various electronic assemblies. Complete all required documentation on failure analysis and required repairs. Troubleshoot, test and assemble electromechanical assemblies. Assist in reworking, repairing and modifying nonconforming equipment. Provide technical support to other groups and co-workers. Perform tests with instructions and documentation. Assist in configuring, preparing, maintaining, utilizing and/or designing test stations and test equipment.
  • Electrical engineer Full Time

    ELECTROMAC for Contracting & Consulting Company.

    Aug 2012 - Apr 2013 -8 months

    Egypt , Cairo

    • Job Details:Supervise the work of implementation of "Sanita SCP" factory such as  Lighting system  Power system (MV – LV Panels, Distribution Boards , sockets, Cables and Transformers)  Fire alarm system  Security system (CCTV )  Emergency system (UPS & Generators)  Earthing system
  • Education

    • electrical engineering in electrical power and machines

      Zagazig University (ZU)

      Jan 2007 - Jan 2012 - 5 yr

    • High School - Thanaweya Amma

      Al Ibrahimeya

      Jan 2005 

    Skills

    • AutoCAD
    • Microsoft Office
    • ETAP, Dialux
    • SIMATIC Manager
    • SIMATIC WinCC flexible
    • Oil
    • Contracting

    Languages

    • Arabic

      Fluent
    • English

      Intermediate

    Training & Certifications

    • An integrated course in the

      Training Center of the Ministry of Industry (ITC)·2011
    Share this Profile