profile-img

ESSAM Elden Essam

I have 20 years experience

Cairo, Egypt

Work Experience

  • Project ManagerFull Time

    LIFT SAB

    Feb 2022 - Aug 2022 -6 months

    Egypt , Cairo

    • Job Details:Project Name 50 MWP PV POWER PLANT, Zaafarana, EGYPT. The client: CCC. Owner: New & Renewable Energy Authority (NREA) اسم المشروع 50 MWP PV POWER PLANT ، الزعفرانة ، مصر. العميل: CCC. المالك بهيئة الطاقة الجديدة والمتجددة (NREA).
  • Project ManagerFull Time

    (Sanbouk Misr) http://www.sanboukmisr.com/

    Nov 2018 - Present -6 yrs, 8 months

    Egypt , Cairo

    • Job Details:As project manager was working for (Sanbouk Misr) http://www.sanboukmisr.com/. The project was a compound of 20, 0000 square meters in the middle of the fifth settlement, in Egypt. The project was mainly residential buildings and Infrastructure work including but not limited to the Construction of buildings, roads, footpaths, and other public infrastructure as well as related services such as architecture, surveying, contract management, and finishing works. The infrastructure executed in that project includes all works of water, firefighting, irrigation, wastewater, drainage & storm water drainage, electrical and communication networks, transformers, ring main units, emergency generator, underground water tank, and pumps. المشروع : كمبوند على مساحة 20000 متر مربع وسط التجمع الخامس بمصر. http://www.sanboukmisr.com/ مباني سكنية وأعمال البنية التحتية تشمل على سبيل المثال لا الحصر: تشييد المباني والطرق وممرات المشاة وغيرها وربطها مع البنيه التحتية العامة بالإضافة إلى ادارة الاعمال ذات الصلة مثل المعمارية والمساحية و وهكئا إدارة العقود لمقاولي الياطن من الخرسانات الي أعمال التشطيب. وايضا البنية التحتيه للمشروع Infrastructure Works والتى كانت تشمل : جميع أعمال المياه ومكافحة الحرائق والري والمياه والصرف الصحي وتصريف مياه الأمطار والشبكات الكهربائية والاتصالات والمحولات ولوحات الربط الحلقى ومولد الطوارئ وخزان المياه الجوفي والمضخات والتعامل مع السلطة لإنهاء التوصيلات العامة.
  • Project Manager Full Time

    CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar

    Jun 2014 - May 2016 -1 yr, 11 months

    Qatar , Doha

    • Job Details:• Arranged and involved in coordination meeting and progress meetings • Reviewed the project progress reports with periodic reporting on project performance • Ensured quality assurance and quality control systems • Supervised architecture work as well insure Coordination of IFC (issue for constructions) documents and monitors , manages compliance and KPI’s • Structure modelling • Structure raft foundation • Structure retaining walls with flat slab for the three Basements • Structure flat slab (G + M ) • Structure 14 post tension slabs Plus penthouse • MEP systems • Mechanical Works Item Work: Plumbing Description: Cold and Hot Water system Equipment: Centralized Electric water heater, Transfer pump, Booster pump, Circulation pump for hot water Circulation/filtration for raw water and swimming pool, Concrete water tank (basement), GRP on roof Item Work: Plumbing Description: Drainage system Equipment: Soil pipe system, Waste pipe system, Vent pipe system, Kitchen drainage pipe system to Grease trap, Storm water system Item Work: Plumbing Description: Irrigation Equipment: Booster pump set Item Work: Fire Fighting Description: Sprinkler system, Stand pipe system, Fire Extinguisher, FM 200 Cylinder as per room wise, Extract hood system Equipment: Electric, diesel and jockey pump, Fire hose reel, breeching inlet, Fire Extinguisher/fire blanket Cylinder chemical as per hood size Item Work: HVAC Description: Chiller system, Exhaust system, Smoke ventilation , Split AC unit, pressurized fan, Fresh air fan Equipment: Air cool chiller system, FCU for guest room/public, FAHU guest room and public, Air curtain where required for guest, toilet, generator, electrical room, Jet vent and axial fan for Help, server and security room, Staircase well for parking area Item Work Elevator Description Passenger elevator, Service and Fire elevator, Valet parking elevator Equipment: B3 to PH floor (3 nos), B3 to PH floor (2 nos), B3 to GF • Electrical Works include Electrical: Power System (substation, Lv Room, Transformer), Small power (Distribution, sockets), Earthing, Lightning, Lighting, BMS, CCTV, F.D.A.S, Tel/ Data, Public address, , Clock, SMATV (IPTV), UPS, Access Highlights: • Successfully introduced best practices in the work and successfully met the stringent quality standards. • Assured satisfaction of the client Faithful and Gold Management Team • Pivotal role in managing the total construction effort to ensure the project is constructed in accordance with the design, budget and schedule. • Successfully developed quality and workmanship standards and adheres to construction specifications. • Strategically offered technical assistance and interpretation of drawings, recommending construction methods and equipment, as required Logs, references, distributes, and files all related correspondence, drawings, and documents • Steered efforts to ensure all project staff and subcontractors employed to execute engineering-construction tasks conform to applicable work rules and SOPs for security, safety, environmental controls, hazardous materials and underground utilities • Stringently monitored and prepared required Construction Reports, to monitor progress against schedule/timelines
  • Civil Site Work Coordinator Full Time

    Building Systems Trading & Contracting WLL

    Jul 2010 - Jun 2013 -2 yrs, 11 months

    Qatar , Doha

    • Job Details:Project Undertaken: Tiltle: Light Rail Transit (LRT) project Client: Sener Ingeniera Y Sistemas, Doha, Qatar/ Qatari Diar Vinci Construction (QDVC) Key Result Areas: • Responsible for the construction planning and controlling project schedules, detecting noticeable delay if any in the schedule, and asking to remove all bottlenecks to meet the set goals with defined deadlines • Monitored project changes, updating site based on schedule as agreed with engineering & project management • Assured construction according to the Qatar Construction specification (QCS) • Followed up on engineering field change request (FCR’S) as well as non-conformance reports (NCR’S) • Arranged a weekly meeting, meeting agenda and minutes of meetings • Liaised with stakeholders to overcome difficulties, sanctioning & scheduling materials delivery. • Developed& strictly implemented safety assurance plans in construction • Verified all documents released by QDVC work being carryout on site and release it to the site Engineers • Assembled all performance data to prepare and analyse the monthly report • Maintained coordination between with agents, answer Inquiries coming from site according to client methodology, and discussing with technical team for clarifications if any • Provided observation on site and send the critical observation by emails to client QA/QC department and distribution all concerned persons • Accountable for advance reading of drawing to be familiar with the new structures to implement on site • Examined drawings, method statements, & availability for project execution • Worked closely with electro mechanical team for movements according to schedule/ reschedule of handover time • Identified critical activities in construction work, including staff requirements,& providing inputs for statutory clearances • Reviewed the quality records and as build documents to finally collect all data to prepare and submit the monthly report to the top management Highlights: • Key role in introducing best practices in the work and successfully met the stringent quality standards. • Remarkable success in handling Light Rail Transit (LRT) project Lusail City Phase 2B (Cut & Cover) and delivering phase (2C1A), in Qatar • Significant contribution in structural work of 14 Km tunnel structure works, 2 typical station, 1 untypical station and 4 grade station and part of viaduct to the client • Acknowledged and assured satisfaction of the client Qatari Diar Vinci Construction (QDVC)
  • Education

    • Bachelor’s Degree in Science Civil Engineering in Civil Engineering

      Higher Technological Institute (HTI)

      Jan 1993 - Jan 1999 - 6 yr

    • High School - Thanaweya Amma

      Thanwaia AMMA

      Jan 1993 

    Achievements

    A meticulous and highly competent HR professional with track record of achieving best results in 19 + years of my successful career. I have in-depth knowledge of project specific risk management and reduction of non-conformance cost. I am skilled in achieving objectives by establishing plans, budgets & results measurements; allocating resources; reviewing progress and making mid-course corrections. Contact me at +974 70595045; +20 101 039 5830; essamn1@gmail.com

    Skills

    Languages

    • English

      Advanced

    Training & Certifications

    • CAPM

      PMI·2013
    • MS Project

      Information Technology Incorporation ·2008