
Ibrahim sadek Elshenawy
Electrical ُEngineer
Tanta, Gharbia, EgyptWork Experience
Senior electrical commissioning engineerFull Time
El Sewedy Power System Projects PSP
Mar 2018 - Present -7 yrs, 3 months
Egypt
- Job Details:Senior commissioning (operation) engineer for (El Sewedy power system projects) (PSP) CCPP 4800 MW Beni-suief (2/2018 up to now). 1.Electrical commissioning engineer. 2.Field & DCS (SPPA-T3000) engineer for B.O.P systems. • Raw water pumps. • Water filtration. • Water treatment plant DM water and potable water. • Circulation water pumps. • Condensate & feed water pumps. • Water Firefighting system. • Service water pumps. • CO2 firefighting system. • Fuel gas system has 5 gas compressors with Aux. systems. • Instrument & service air systems. 3 air compressors with Aux. systems.
Technical office engineerFull Time
Sakan Al-arabiyah (KSA)
May 2017 - Dec 2017 -7 months
Saudi Arabia , Jeddah
- Job Details:Technical office engineer (Electrical works) Working for next projects. -Housing of Technical College for boys and girls (TVTC). -Repairs and Refurbishment for Prince Sultan Armed Forces Hospital (MODA).
electrical section headFull Time
POMEC
Jul 2015 - May 2017 -1 yr, 10 months
Egypt , Giza
- Job Details:Design ,supervision & execution of electrical work and systems light current
site managerFull Time
giza power transmission
Feb 2015 - Jul 2015 -5 months
Egypt , Giza
- Job Details:infrastructure project (low and medium voltage, lighting and distributor
Education
BSc in electrical power
Tanta UniversityJan 2004 - Jan 2009 - 5 yr
BSC in electrical power and machine
Tanta UniversityJan 2009 - Jan 2004 - 60 Month
High School - Thanaweya Amma
al ahmdyaJan 2003
Achievements
supervising and executing many projects
Languages
Arabic
FluentEnglish
Advanced
Training & Certifications
autocad
mansoura university·2010plc
ainshams university·2008