
STEINAR ANSHUS
Enginer-17 years of International exsper
Dubai, United Arab EmiratesWork Experience
Project Manager-Services Middle East.Full Time
Outotec Engineering JLT-Dubai-UAE.
Jul 2013 - Present -11 yrs, 11 months
United Arab Emirates , Dubai
- Job Details:Main task is to setup and run
Engineering Head of Maintenance/PlanningFull Time
Emirate Steel Industry
Apr 2007 - Jan 2013 -5 yrs, 9 months
United Arab Emirates , Abu Dhabi
- Job Details:My position with ESI was as He
Engineering Head of Maintenance/Planning.Full Time
Ezz Steel Ind.
Sep 1998 - Jan 2007 -8 yrs, 4 months
Egypt , Monufya
- Job Details:I was part of an Expatriates group, which consisted of British, Indian and Norwegian- Members. We covered all fields of engineering in a Danieli steel mill. My position with Al Ezz Steel Rebar’s was as engineering head of maintenance/planning for all maintenance activities (Mechanical & Electrical). This included 2 - Rolling Mills (800 k/t bar rolling mills) and 1 Melt Shop (80MVA, 600 k/t). Responsibilities included: • Improve/ upgrade and run all planning maintenance activities for all 3 plants. • Coordination between departments (Engineering, Production department, Log. Etc). • Supervise all weekly shutdown-meetings and major shutdowns. • Follow up jobs on maintenance day for all departments in all plants. • Member of project teams for new/upgrading equipment’s for the plants. • The computerised maintenance planning system was from First Engineering – Egypt. • The company was certificated for ISO 9001 and ISO 14001
Maintenance/Planning EngineerFull Time
Bangkok Steel Industry Public Company Limited
May 1997 - Jan 1998 -8 months
Thailand , Bangkok
- Job Details:BSI was a member of Metro Group, which consisted of 80 companies at that time. BSI had 2-older rolling mills, 1-older steel-plant and 2-new rolling mills. My position with BSI was as a Maintenance planning engineer for all maintenance activities and a co-ordinator between departments, for a new 300-k/t-bar rolling mill. Responsibilities included: • Implementation of a new computerised maintenance planning system and coordination of the maintenance workforce in line with the new maintenance philosophy being adopted. • Translation of technical manuals into procedures for use by non technical workforce. • Building up a drawing system and identifying all the technical equipment at the new mill. • Supervision of 2 Indian engineers and 1 Thai engineer. • The computerised maintenance planning system was built in DELFI and based on database (Microsoft-access plus oracle).
Education
Oslo Univeristy og Enginering in mech. Engineering
EngineeringJan 1989 - Jan 1991 - 2 yr
Vocational in mech. Engineering
Bergen tekniske fagskoleJan 1987 - Jan 1989 - 2 yr
Technical Diploma in Industrial Mechanics and Maintenance Technology
Vefsn Videregaaende/Voksen-opplearingenJan 1981 - Jan 1981 - 0 Month
Languages
English
Fluent