
Amr Mohamed Abdelsayed
Electrical Engineering
Jeddah, Saudi ArabiaWork Experience
I&C Technical Office EngineerFull Time
Orascom Saudi Arabia
Jun 2017 - Present -8 yrs, 1 month
Saudi Arabia , Jeddah
- Job Details:The King Abdulaziz International Airport (KAIA) project is owned by the General Authority of Civil Aviation in Saudi Arabia [GACA] and project consultants is Dar Al-Hundasah. My scope of work at this project is I&C Technical Office Engineer for PLC / BMS Control System at the following facility : C220 - Grey Pumping Station C220 - New lift Pumping station C225 - Sewage Pumping Stations (Qty. 9 Pumps Building) C270 - Wet utility Tunnel C270 - Chilled water network E200 - Arterial tunnel J250 - Tree Nursery PLC vendors: ABB , Siemens , Allen Bradley BMS vender :Johnson Controls Job Responsibilities 1. Study User Requirement Specification and design reports/drawings clearly and precisely to attain client requirements. 2. Prepare and review material technical submittals for PLC / BMS systems with system vendor to ensure that material compliance with project specification. 3. Prepare and review engineering technical submittals for PLC / BMS systems with system vendor to ensure that the PLC / BMS system provide client requirements. 4. Review and coordinate PLC / BMS systems requirements for all MEP devices and equipment's to ensure proper interface and comply to design. 5. Coordinate system interface with High level control ( SCADA / I2BS ) Via open communication protocol Modbus TCP/IP - Bacnet/IP - OPC - ... Each. 6. Develop and prepare shop drawings for PLC / BMS systems as per applicable standards and codes. 7. Develop and prepare installation details drawing for (level ,pressure ,flow ,Temp and according to hock up details at guide manuals and applicable standards and codes.( Endress and Hauser - Rosemount - Dwyer - Danfoss - Siemens - Emerson - Nivus - Tunnel sensors - Greystone - Johnson Controls ) 8. Develop, prepare Cables list for PLC / BMS systems. 9. Perform material take-offs and prepares BOQ. 10. Prepare purchase orders for materials required as per consultant approved technical submittals and shop drawings. 11. Supervise the site work and provide technical support. 12. Guide project installation ,testing and commissioning.
Senior Site EngineerFull Time
Orascom Saudi Arabia
Jun 2016 - Jun 2017 -1 yr
Saudi Arabia , Jeddah
- Job Details:Al Safwa Cement Plant Line 2 Project is owned by Lafarge Holcim / Al Safwa Cement Company in Saudi Arabia and project consultants is POLYSIUS. My scope of work at this project is electrical and I&C site Engineer for Homosilo , kiln dust hopper, Preheater , kiln , Cooler and crusher. Job Responsibilities: 1. Conduct morning tool box for all involved workers to explain the method of work and risk analysis and job safety training and definite the needed tools to ensure safe and healthy work atmosphere. 2. Study project specifications and installation details and drawings for electrical work / instrumentations clearly and precisely. 3. Prepare material request as per drawing for planed site work and transfer materials to work area. 4. Direct and assist technically Electrical Superintendents and crafts 6. Supervise Electrical Panels Erection ( Medium voltage switch gear – MCC – various control panels). 7. Supervise erection for (level ,pressure ,flow ,gas analyzer ,vibration ,vibration – flame detector sensors and ensure that all instrumentations erected according to P&ID drawing and hock up and guide manuals. 8. Supervise Electrical cables race way tray installation and prepare inspection request for consultant approval and clear punch list if any before pulling cables. 9. Coordinate with Design Engineers to solve drawing as well as set-route problems. 10. Supervise cables pulling activity and ensure that cable source and destination and cable size and specs is as per design. 11. Supervise cables connection activity and ensure that cable connected as per wiring diagram and conduct continuity and megar test for all connected cables. 12. Ensure quality and compliance to parameters and codes. 13. Prepare report for commissioning team with all ready items.
Electrical Site EngineerFull Time
Orascom
Feb 2015 - Jun 2016 -1 yr, 4 months
Egypt , Assiut
- Job Details:Assiut Combined Cycle 1500 MW Power Plant Project is Eight 125 M Watt GE Gas turbine model 9E, Two 250 MW GE steam turbine and Eight HRSC Owned By UEEPC in Egypt and project consultants is GE / PGESCO. Job Responsibilities: 1. supervise turbine electrical fitting works ( Electrical skids and Panels Fixing PEECC –cable tray and cable support – conduits and lighting Fixtures fixing - fire alarm ) 2. supervise erection for for each turbine (pressure transmitters – flow transmitters – temperature sensors– speed – vibration – flame detectors – limits switches – Pressure & temperature indicators) according to P&ID drawing and hock up and guide manuals. 3. Supervise cables pulling activity and ensure that cable source and destination and cable size and specs is as per design. 4. Supervise cables connection activity and ensure that cable connected as per wiring diagram and conduct continuity and megar test for all connected cables. 5. Supervise all electrical activity at medium & low voltage switch gear room electrical fitting works for ( medium, power and control cables tray – lighting &sockets system - fire system – telephone & paging system - Electricals Panels Fixing ) ,pulling cables work , Medium & Power & control cables testing and connecting 6. Supervise and coordinate Interface control signals among substation & GIS control and turbine. 7. Responsible for all electrical activity at two FOTP Fuel Oil Treatment Plant supplied by (NEC SRL) such as electrical fitting works for all electrical system (Electricals skids and Panels Fixing –cable tray- lighting system - fire alarm - I & C ) ,pulling cables works ,cables testing and connecting. 8. Clear Electrical and I & C Punch list with client.
Electrical EngineerFull Time
SigmaTEC for Pharmaceutical Industries
Aug 2011 - Feb 2015 -3 yrs, 6 months
Egypt , Giza
- Job Details:My responsibilities was the following: I. Maintenance engineer 1. Contribute designing maintenance strategies, procedures and methods for below system: A. Electrical distribution system Maintenance ( MVSG , MDC , HVAC MCC, LCP , Lighting DB ,transformers and generators). B. Pharmaceutical production machines ( for 6 production filing and tablet lines ). C. Utility equipment Operation and Maintenance (boilers, air compressor and Nitrogen generators ). D. Distilled water plant E. HVAC BMS System ( Workstation and all instrumentations and control device with vendor technical support Johnson control and sauter controls ) F. HVAC System ( AHUs , Centrifugal Pumps, Absorption Chillers, Clean Rooms ( sterile & non sterile areas and pressure balance and Cooling Towers ). 2. Carrying out routine scheduled maintenance work and responding to equipment faults. 3. Diagnosing breakdown problems 4. Fitting new parts and making sure equipment is working correctly. 5. Monitor spare part list and prepare the purchase orders to ensure spare parts stay available in store. II. Project engineer Review electrical design drawing and supervise the implementation of ampules filling new production line ( lighting & sockets system – fire alarm system – cable race way – pulling ,testing and interconnecting cables and commissioning and start up with Marchesini Italian group ampules filling machine vendor.
Education
BSc in industrial electronic & automatic control Engineering
Menoufia UniversityJan 2005 - Jan 2010 - 5 yr
Skills
Languages
Arabic
FluentEnglish
Intermediate
Training & Certifications
Siemens WINCC SCADA system
Salesian Institute "Don Bosco"·2012Siemens PLC S7-300
Salesian Institute "Don Bosco"·2012HVAC
Gulf Technical & Safety Training Centre “ GTSC “ ·2012Siemens PLC S7-200
Salesian Institute "Don Bosco"·2011GMP
Sigmatec Co·2011Dialux
Jelecom·2010Power Distribution
Jelecom·2010Pneumatic & Hydraulic Control
Science & technology Centre Of Excellence “ STCE “·2010CNC
Science & technology Centre Of Excellence “ STCE “·2010AutoCAD
Jelecom·2009Classic Control
Salesian Institute “Don Bosco“·2008ICDL
2008MATLAB
Menofia University.·2008