Basic Info

Balaji Marimuthu

More than 15 years

Chennai, India

Bachelor's Degree

Manager

Work Experience

Manufacturing at NHK Spring India Ltd

Experience Details

Manufacturing

Manufacturing/Production, Operations/Management

Manager

 Planning day-to-day activities, production schedules and allocating work for achieving of weekly production targets in Seat Assembly shop/CV Joint/Power transmission Drive shaft Assembly conveyor & CNC /SPM Machine shop/sheet metal robo weld shop
 Coordinate with PPC/Materials Team to plan production based on market requirement and Adjusting schedules as needed & ensure availability of required raw material and packing material suppliers for timely feedback on supply/quality issues and resolve the same & coordinate material movement and shipment plan


Company Details

NHK Spring India Ltd (multinational)

India

101-500 employees

Automotive, Manufacturing

www.nhksprinh.jp.com

Jan 2016 to present (1 year 7 months)
Assistant Manager-Manufacturing at Hyundai wia India Ltd

Experience Details

Assistant Manager-Manufacturing

Manufacturing/Production, Operations/Management

Manager

 Overall responsibilities of independently handling the outsourced plant operations.
 Monitor production on a shift-to-shift basis to meet pre-decided plans and targets
 Monitoring production, keeping control over activities and analyzing processes for stabilization thereby ensuring smooth operations.
 Timely reporting of various information to the higher-ups & Ensure proper communication of production issues in the shift to the relieving shift Engineer
 Prepare/Adhere dispatch plan based on customer requirement and define Max/Min stock
 Responsible for all aspect of Quality Control, Quality assurance for various process (Incoming Quality/In process/Finished goods),Final inspection and Fire wall inspection


Company Details

Hyundai wia India Ltd (multinational)

Chennai, India

101-500 employees

Automotive, Manufacturing

www.hyundaiwia.com

Nov 2010 to Jan 2016 (5 years 2 months)
Executive-Production at Sundram fasteners Ltd

Experience Details

Executive-Production

Manufacturing/Production

Experienced (Non-Manager)

 Implement and monitor utilization of resources (including manpower, plant & machinery) during the shift and review
 Executing cost saving techniques/ measures and modifications to achieve substantial reduction in expenditures and work within the budget.
 Take lead in implementation of TPM & 3C, kanban, 5S, SGA, FIFO, concepts/tools/techniques to achieve higher productivity & seamless deliverables.
 Responsible for Ford Production System measurable FTT, OEE, BTS, LPS.


Company Details

Sundram fasteners Ltd (multinational)

Chennai, India

501-1000 employees

Automotive, Manufacturing

www.sundram.com

Jan 2008 to Nov 2010 (2 years 10 months)
Team Member-Maintenance at Visteon Powertrain control system India Ltd

Experience Details

Team Member-Maintenance

Manufacturing/Production

Experienced (Non-Manager)

Board / Contact electrical Inspection Audit for New TNEB connection like Rule 46 & 63
 Hand on Experience on Installation & Commissioning of all Utility equipment like Compressor /Drier/Diesel generator/Chiller/STP/Pump house/UPS
 Overall responsibility for all facility engineering and maintenance functions in HYUNDAI WIA
 Generating maintenance measurable data such as Mean Time between Failure (MTBF), Mean time to Repair (MTTR) for easy analysis and Management Information System.
 Knowledge about TPM Implementation
 Identification of Machine/equipment suppliers.
 Participate &contribute in development of low cost Automations &special purpose machines.
 Interact with local and international machine suppliers for procurement of spare/maintenance related issues.
 Prepare yearly budget for maintenance activities


Company Details

Visteon Powertrain control system India Ltd

Chennai, India

501-1000 employees

Automotive, Manufacturing

www.visteon.com

Apr 2004 to Jan 2008 (3 years 9 months)
Supervisor at KMKM engineering

Experience Details

Supervisor

Manufacturing/Production

Entry Level

 Select the supplier with purchase dept & Generate the PR and receive quotation and Compare the quotation based on technical specification and coordinate with Procurement/Purchase dept
 Planning, selection of Jig and fixture, and improvement of the necessary -equipment according to model of product
 Involved in the Design & Development of various Seat design change (ECN/ECR)Jigs/ fixtures/ Tools for the SPM’s, Assembly conveyor
 Support the team to maintain machines, develop tools & equipments, facilities, gauges, jig & fixtures etc., to high performance data during normal production.
 Planning and organisation of workers training before try-outs and start of production
 Conducting training programs time-to-time to enhance the skills of the subordinates and able to train operators on Machine shop and Seat Assembly/Assembly conveyor operations as a result gain improved productivity


Company Details

KMKM engineering

Chennai, India

11-50 employees

Manufacturing, Automotive

N/A

Apr 2002 to Mar 2004 (1 year 11 months)
Technican at Heavy vehicles factory

Experience Details

Technican

Manufacturing/Production

Entry Level

 Monitor production on a shift-to-shift basis to meet pre-decided plans and targets
 Monitoring production, keeping control over activities and analyzing processes for stabilization thereby ensuring smooth operations.
 Timely reporting of various information to the higher-ups & Ensure proper communication of production issues in the shift to the relieving shift Engineer
 Prepare/Adhere dispatch plan based


Company Details

Heavy vehicles factory

Chennai, India

More than 1000 employees

Manufacturing

N/A

Apr 2001 to Apr 2002 (1 year)

Achievements


Scored -92 %in Technical Diploma-Polytechnic second rank Scored -90 %in School- second rank  Cycle time reduction :Final Inspection/Fire wall inspection cycle time reduced from by introducing location pin/toggle clamp  Manpower reduction :By change of front seat assembly layout & convert sub assembly ,reduced one power @ NHK  Line Balancing: Seat Marriage Assembly cycle time reduced from 12 min to 8 min by diverting Steaming operation to previous stage @ NHK  Cost /Manpower Reduction- One machine operation and manpower eliminated by introducing combination tool in single m/c - VISTEON  Scrap reduction- 99% Of fall down of armature from conveyor avoided by providing Gear end Collet with Grub Screw-At Visteon  Availability increased- 100% break down prevented for trim cam roller pin broken by introducing a Cam follower Bearing instead of journal Bearing-At SFL 

Education

Technical Diploma in Industrial safety

Education Details

Technical Diploma

Industrial safety

Annamalai university, India

B / Very Good / 75 - 85%

Industrial safety

N/A

Annamalai university
2009 - 2010
Mechanical in Mechanical

Education Details

Mechanical

Mechanical

Anna University Chennai, India

B / Very Good / 75 - 85%

Mechanical

N/A

Anna University Chennai
2005 - 2009
Technical Diploma in Mechanical

Education Details

Technical Diploma

Mechanical

Tamilnadu polytechnic, Iceland

A / Excellent / 85 -100%

Mechanical

scored 92%

Tamilnadu polytechnic
1997 - 2000
High School - Other

High School Details

Other

Hindu High School

India

1997

A / Excellent / 85 -100%

90% School second

Hindu High School
1997

Training and Courses

Training/Course Details

TPM

Jun 2008

TPM Training Institute

Line loss/OEE increase

Training/Course Details

Hydraulic and Pneumatic

Sep 2004

Advanced Technical Training Institute

Technical Training

Training/Course Details

Lean manufacturing

Sep 2009

Sundram Fasteners Ltd

cycle time reduction set up time reduction line balancing

This profile is fresh!
Last update 13 days ago.

Jobseeker photo

Profile Skills and Keywords

5s,3CAdaptiveAssistant Manager-ManufacturingAutomotiveAutonomous MaintenanceBusiness-orientedCLRICustomer-orientedCycle Time ReductionEnglishExecutive-ProductionFlexibleHydraulic And PneumaticHyundai Wia India LtdIndustrial SafetyInventory ReductionKaizenKanbanLeaderLean ManufacturingLine BalancingListen MusicManagementManpower PlanManufacturingMechanicalNHK Spring India LtdNon Value Added Activity EliminationOEE ImprovementOperationsPlannerPoka YokeProcess Wastage EliminationProductionSMEDScrap ReductionSundram Fasteners LtdSupervisorTPMTamilTeam Member-MaintenanceTechnicanWatch MovieZero Customer Complaint

Self-assesed Skills

Languages

English

English

: Fluent

: Fluent

: Fluent

: Fluent

Tamil

Tamil

: Fluent

: Fluent

: Fluent

: Fluent

Tools and Technologies

Lean manufacturing

Lean manufacturing

: Expert

: Extreme - I love it!

:

More than 7 years

TPM

TPM

: Expert

: Extreme - I love it!

:

More than 7 years

Cycle time reduction

Cycle time reduction

: Expert

: Extreme - I love it!

:

More than 7 years

Line balancing

Line balancing

: Expert

: Extreme - I love it!

:

More than 7 years

Kaizen

Kaizen

: Expert

: Extreme - I love it!

:

More than 7 years

scrap reduction

scrap reduction

: Expert

: Extreme - I love it!

:

More than 7 years

5s,3C

5s,3C

: Expert

: Extreme - I love it!

:

More than 7 years

Kanban

Kanban

: Expert

: Extreme - I love it!

:

More than 7 years

Inventory Reduction

Inventory Reduction

: Expert

: Extreme - I love it!

:

More than 7 years

Autonomous Maintenance

Autonomous Maintenance

: Expert

: Extreme - I love it!

:

More than 7 years

Zero customer complaint

Zero customer complaint

: Expert

: Extreme - I love it!

:

More than 7 years

Poka yoke

Poka yoke

: Expert

: Extreme - I love it!

:

More than 7 years

Manpower plan

Manpower plan

: Expert

: Extreme - I love it!

:

More than 7 years

Fields of Expertise

tpm

tpm

: Expert

: Extreme - I love it!

:

More than 7 years

Lean manufacturing

Lean manufacturing

: Expert

: Extreme - I love it!

:

More than 7 years

Cycle time reduction

Cycle time reduction

: Expert

: Extreme - I love it!

:

More than 7 years

Manpower plan

Manpower plan

: Expert

: Extreme - I love it!

:

More than 7 years

Line Balancing

Line Balancing

: Expert

: Extreme - I love it!

:

More than 7 years

SMED

SMED

: Expert

: Extreme - I love it!

:

More than 7 years

Scrap reduction

Scrap reduction

: Expert

: Extreme - I love it!

:

More than 7 years

Kaizen

Kaizen

: Expert

: Extreme - I love it!

:

More than 7 years

OEE improvement

OEE improvement

: Expert

: Extreme - I love it!

:

More than 7 years

Non value added activity elimination

Non value added activity elimination

: Expert

: Extreme - I love it!

:

More than 7 years

Process wastage elimination

Process wastage elimination

: Expert

: Extreme - I love it!

:

More than 7 years

kanban

kanban

: Expert

: Extreme - I love it!

:

More than 7 years

CLRI

CLRI

: Expert

: Extreme - I love it!

:

More than 7 years

Key Skills

Leader, Planner, Business-oriented, Customer-oriented, Flexible / Adaptive

Online Presence

Balaji MarimuthuBalaji Marimuthu

I’m looking for work, please share my profile…

Get Your own Wuzzuf Profile Now !

Employer? If you're representing an organization or an enterprise, Signup here for FREE to see Balaji's full profile and find more great talent and professionals to join your team.