Basic Info

Ahmed salah

2 years

Cairo, Egypt

Bachelor's Degree

Experienced

Work Experience

Industrial engineer at LG Electronics Egypt

Experience Details

Industrial engineer

Engineering - Mechanical/Electrical

Experienced (Non-Manager)

- Apply lean Principals and Reduce 7 Waste to increase
productivity for the production line and reduce idle time
- Control import & local purchase system,purchasing needed
devices for production line improvement then install and test
According to planned schedule
- Control and follow up Maintenance Troubleshooting for
Production line
- Daily executing Breakdown maintenance and plan for
monthly Preventive Maintenance
- Follow up and Monitoring Conditions for Bearing,pneumatic
and Hydraulic cylinders,valves,Belts,Motors,Sensors
- Responsible for Monthly investment Report
- Plan & Execute transfer plan for LG Factory from Ismailia to
10th of Ramadan city and Supervision production line
equipment installation
- Facility-Equipment Management ,control Fixed Assets &
consumable spare parts system
- Top Achievements :
(30% increasing productivity),
*project objective: increasing productivity by 30%
>Apply DMAIC tool at production field to solve production issues
>Monitoring all production activity and make analysis for line stop
which make idle time then make logic tree to reach the root cause
problem then implement improvement plan
>Define the worst process which have high idle time and analyze the
causes ( target to reduce idle time by 3.6%)
>Apply lean principals at suppliers field to avoid material shortage
>Improve line of balance and focus on neck process
>Apply improvement to the neck process to reduce Takt time

(10% cost reduction),
*project objective : Decrese spare parts Amount by 10%
>Control daily consumption rate and prevent using unnecessary items
>Connect dummy jigs for expensive adjustment equipment to be parts
consumed instead of the expensive
>Apply 5s at spare parts room

(Transfer plan for LG Factory)
*project objective : Install new LG Factory at 10th of Ramadan City

>Sorting all needed equipment and Devices
>Make transfer plan for all needed equipment from old factory
and move it at the Optimum time with the lowest cost and the
maximum safety
>supervision new production line installation with new technology from
LG HQ(Korea)
> Sorting all non needed equipment and sell it to our suppliers


Company Details

LG Electronics Egypt (multinational)

10th of Ramdan City, Egypt

501-1000 employees

Electronics and Semiconductors

N/A

Jul 2014 to present (2 years 5 months)
Planning engineer at Shm industries

Experience Details

Planning engineer

Engineering - Mechanical/Electrical

Experienced (Non-Manager)

- Implement and monitor the planning processes to ensure efficient delivery of the engineering plan in order to meet the business, Safety, Environmental, Financial and Operational objectives at minimum cost and in the safest manner.
- Manage the Materials Resource Planning requirements daily.
- Manage stock items including the creation of new materials and the identification and replacement of obsolete items.
- Update the BOM (Bill of Materials) system.
- Manage the purchase to pay process.
- Monitor, manage and review defined KPI at business review meetings and planning , implement total preventive maintenance plan


Company Details

Shm industries

Cairo, Egypt

101-500 employees

Engineering Services

N/A

Mar 2014 to Jul 2014 (4 months)
Maintenance Engineer at Egyptian Army

Experience Details

Maintenance Engineer

Engineering - Mechanical/Electrical

Entry Level

Responsible for Maintenance of Anti-Air Craft Equipment
(Hydraulic parts maintenance,lubricating rotating parts, follow
up daily ,weekly and monthly maintenance to improve
equipment efficiency and reduce sudden errors)


Company Details

Egyptian Army

Egypt

N/A

Military

N/A

Nov 2012 to Mar 2014 (1 year 4 months)
Industrial Development Research at BYD Automotive

Experience Details

Industrial Development Research

Manufacturing/Production

Entry Level


- Modifying assembly line design so as to solve practical problem which has major negative effect on factory production
- Target is to increase the factory productivity using same existing assembly line utilities ,which is beyond current capabilities of the assembly line .
Redesign and balancing for the assembly line has been decided to achieve customer target to Increase production


Company Details

BYD Automotive

10th of ramadan city, Egypt

101-500 employees

Automotive

N/A

Sep 2011 to Sep 2012 (1 year)

Achievements


-plan and implement moving plan from ismailia factory to 10th of Ramdan Factory
-installing facilities and producction line equipment for new Lg line (10th of ramdan factory)
-create spare parts system and implement 5s at warehouse rooms and production line
-impLement TPM


-Apply TPM
-apply 5s
--make tutorials for engineers and technician to explain lean manufacturing Principals


Education

Bachelor's Degree in design and production mechanical engineering

Education Details

Bachelor's Degree

design and production mechanical engineering

Ain Shams University, Egypt

Not specified

N/A

N/A

Ain Shams University
2006 - 2012

Certifications

Certificate details

diploma in the hydraulic and pneumatic systems

Nov 2012

N/A

N/A

N/A

EEA (EGYPTIAN ENGINEERS ASSOCIATION),

N/A

Certificate details

 CAD/CAM (TOP SOLID software)

Aug 2011

N/A

N/A

N/A

ITC institute

N/A

Certificate details

 CNC (Turning –FAUC 21)

Aug 2010

N/A

N/A

N/A

ITC institute

N/A

Training and Courses

Training/Course Details

quality control

Aug 2011

 BAG, Bavarian Auto Group (BMW factory)

- Assembly Line Workshop • Acquired excellent experience in assembly lines design, operation and maintenance for several BMW series • Actively worked with Engineers demonstrating each section detailed functions with thorough understanding for Trim ,Under-body, Finishing and Audit Stations/Workshops ---------------------------------------------------------- - Quality Control Department • Assuring audit samples match quality guide lines and below the tolerance value. -------------------------------------------------------- - Test Drive

Training/Course Details

maintenance

Aug 2010

 EFC (Egyptian Fertilizer Company)

- Training in maintenance workshop (operations for heat exchangers,pumps,compressors,blowers and valves ) - Acquire general knowledge of workshop machines and measurement tools - Following up the maintenance procedure of some pumps and identify their main parts,sealing systems,kinds of bearings and mechanical seals

Training/Course Details

general workshops

Sep 2009

 Arab Organization for Industrialization

Training at general workshops (SAQR factory) • Workshops for weapons manufacturing e.g (R.P.G) • Interact with manual and CNC machines • Training at quality control department

Training/Course Details

 maintenance &- Hydraulic workshops

Aug 2008

 Arab Contractors

- Engines maintenance workshop • Worked on internal combustion engine • Working in engine Maintenance following sections: Turning , Assembly and Testing • Interacting with different types of internal combustion engine cycles: Diesel cycle , 2-stroke and 4-stroke ---------------------------------------------------------- - Hydraulic workshop: • Worked on basic hydraulic system components • Learned the difference between pneumatic and hydraulic systems • Interacting with different types of valves ( relief – control ) valves

This profile is fresh!
Last update 1 days ago.

Jobseeker photo

Profile Skills and Keywords

? CAD/CAM (TOP SOLID Software)? CNC (Turning FAUC 21)? Maintenance &- Hydraulic Workshops?general WorkshopsArabicAutoCADAutodesk InventorAutomotiveBusiness-orientedCreativeDesign And Production Mechanical EngineeringDiploma In The Hydraulic And Pneumatic SystemsElectronics And SemiconductorsEngineering ServicesEnglishIndustrial Development ResearchIndustrial EngineerInnovativeLG Electronics EgyptLean Manufacturing,production,planning,logistic,materialMaintenanceMaintenance EngineerManufacturingMicrosoft OfficeMicrosoft OutlookMilitaryNew ChallengeOperationsOrganizerPlanning EngineerProblem SolverProductionQuality ControlSelf-confidenceTeam Work

Self-assesed Skills

Languages

Arabic

Arabic

: Fluent

: Fluent

: Fluent

: Fluent

English

English

: Fluent

: Advanced

: Intermediate

: Intermediate

Tools and Technologies

Microsoft Outlook

Microsoft Outlook

: Expert

: Extreme - I love it!

:

1-3 years

Autodesk Inventor

Autodesk Inventor

: Advanced

: Extreme - I love it!

:

1-3 years

Microsoft Office

Microsoft Office

: Advanced

: Extreme - I love it!

:

3-5 years

AutoCAD

AutoCAD

: Advanced

: Extreme - I love it!

:

Less than 1 year

Fields of Expertise

lean manufacturing,production,planning,logistic,material

lean manufacturing,production,planning,logistic,material

: Advanced

: Extreme - I love it!

:

1-3 years

Key Skills

Business-oriented, Creative, Organizer, Problem Solver, Innovative

Online Presence

https://www.linkedin.com/profile/view?id=AAIAAAbQAL8Bvo-WvU1JzCL5enEfk3qv5djaX8U&trk=nav_responsive_tab_profile

Like ahmed`s profile? Share it!

Get Your own Wuzzuf Profile Now !

Employer? If you're representing an organization or an enterprise, Signup here for FREE to see Ahmed's full profile and find more great talent and professionals to join your team.