AA
aftab.adsar adsar
Instrument Commissioning Supervisor at NPCC
Work Experience
Instrument Commissioning Supervisor
NPCC
Jul 2009 - Present -16 yrs
- Job Details:Overall responsibility for ESD/FGS/DCS loops, logic/functional checking and all commissioning activities. Preparation of instrument loop checks folders. Interdepartmental coordination for design inputs and transfer of information. Sizing calculations for control valves, flow meters and safety instrumented functions. Calibration and troubleshooting of various transmitters and instruments.
Toco Oman
Nov 2006 - Jan 2009 -2 yrs, 2 months
Oman
- Job Details:Checked acceptance forms for performed work, ensured compliance with drawings/requisitions, and managed subcontractor activities. Calibration and installation of fire and gas detection systems.
IMCO Kuwait
Jun 2001 - Jun 2006 -5 yrs
Kuwait
- Job Details:Installation and calibration of pressure pilots, maintenance job modification, and construction activities. Provided assistance to commissioning team and vendors.
Med Gulf Construction Company
Mar 2000 - Apr 2001 -1 yr, 1 month
Kuwait
- Job Details:Carried out calibration, installation, and testing of fire & gas instruments and process field instruments.
Education
Diploma in Instrumentation
west bengalJan 1995 30 yr 6 Months