profile-img

Abanoub ibrahim tawfik

MEP Engineer, PMP, EIT

Downtown, Cairo, Egypt

Work Experience

  • QC EngineerFull Time

    Arab Contractors and Orascom Construction Joint Venture

    Dec 2018 - Mar 2020 -1 yr, 3 months

    Egypt , Port Said

    • Job Details:FAT testing Low voltage Panels including ( MDB, LDP, SMDB, MCC, P.F Correction ) Review QC documentation &project quality plan (PQP). Review all drawings and material submittals to make sure of the approval of Consultant . Monitor activities of contractor and sub Contractors. Inspection of earthing , lightning system and duct bank & manhole and earthing foundation system. Inspection installation of cable tray & risers and supports. Inspection installation & testing of low & medium transformers. Inspection installation & testing of motor central control(MCC)& local control panel(LCP)& PLC panel and (UPS) panel . Inspection testing for all type of cable which is( Continuity, insulation , HI-POT leakage test.cross section, routing ,termination.dressing and Type of cable as approved) . Releasing all the Electrical Works to the Consultant
  • MEP EngineerFull Time

    Arab Contractors & Orascom Construction Joint Venture

    Jun 2018 - Dec 2018 -6 months

    Egypt , Port Said

    • Job Details:Duct Bank and Manholes Installation Cable Trays Installation Main Earthing Grid Installation Lighting System Installation Low Voltage Installation Medium Voltage installation Coordinating the works between the Electrical team and the Civil team Releasing all Electrical Works to Consultant
  • Mep Project EngineerFull Time

    Arab Contractors and Orascom Construction

    Apr 2018 - Present -7 yrs, 3 months

    Egypt , Port Said

    • Job Details:FAT testing MEP Equipment Review and Create QC documentations. Review all drawings and material submittals to make sure of the approval of Consultant . Inspecting and Testing the MEP works. Monitor activities of contractor and sub Contractors. Creating the Testing and Commissioning Procedures for the Electrical Works. Responding to the Contractor and the Consultant Letters. Created Scenarios for Systems Integration. Releasing all the Electrical Works to the Consultant. Worked on a lot of Systems like " Systems Integration, ITS System, Jet Fans, MV System, SCADA, LV System, Drainage System, Fire Systems, Ventilation Systems"
  • Electrical & Instrumentation Site EngineerFull Time

    Orascom Construction & Siemens Consortium

    Jan 2017 - May 2018 -1 yr, 4 months

    Egypt , Kafr Alsheikh

    • Job Details:job responsibilities : AIR INTAKE Raceways, Pulling Cables, Instruments Installation, Cables Termination IPB ( ISO PHASE BUS-DUCT ) Erection Medium and High Power Transformers Installation Medium Power Transformers Testing Power Control Center Erection, Panels Installation and cables Termination Communication Systems ( Telephone, Data and Paging ) Installation Indoor and Outdoor Light Current Systems Installations and Testing Fire alarm system Installation Gas Turbine ( SGT5-8000H ) Erection Instrumentations installation Duct Bank and Manholes Installation Indoor Raceways Installation
  • Education

    • bsc in electrical engineer

      Mansoura University

      Jan 2009 - Jan 2016 - 7 yr

    • High School - Thanaweya Amma

      el-malek elkamel

      Jan 2009 

    Achievements

    this year i win a reading challenge by reading more than 30 books in 9 months :)

    Skills

    • Presentation Skills
    • Microsoft Office
    • Electrical Engineering
    • PMP
    • Project Management
    • AutoCAD
    • Matlab

    Languages

    • Arabic

      Fluent
    • English

      Advanced
    • French

      Beginner

    Training & Certifications

    • PMP

      PMI·2020
    • FE Electrical Engineering

      NCEES·2019
    • Microcontroller Basic Training

      jelecom·2013
    • Educational & Linguistic Skills

      Netherlands Training Center·2013
    • PLC Basic & Classic Control Training Program

      jelecom·2012
    • ICDL Certificate

      ECDL·2011
    Share this Profile