WB

Wefaq Abdul Maqsoud Bekheet

Technical Office Manager at Redcon Construction S.A.E., Alamein Coastal High rise tower

Agami, Alexandria, Egypt

Work Experience

  • Technical Office ManagerFull Time

    Redcon Construction S.A.E., Alamein Coastal High rise tower

    Mar 2022 - Present -3 yrs, 3 months

    Egypt , Matruh

    • Job Details:Managing all arch and civil technical duties and financial tasks. Study project packages; tender drawings, specs, BOQ and contract condition. Study and reply on the client, ECG and contractors corresponds. Meetings with PM and CM to follow the monthly target, work priorities and project issues. Evaluating the employees and updating the employment plan. Guiding 15 engineers to create, evaluate and update the engineering plan and Performing the following daily tasks: 1- Workshop drawings (Concrete dimensions by Revit and reinforcement details by ASD). 2- Design issues and value engineering reports. 3- Material submittals and selections, Pre- qualifications based on vendor list, BOQ and specs information coordinating with tendering and procurement sections. 4- Coordination with MEP requirements prior t o formwork drawings, RFIs and RFPs replies. 5- Reports and presentation, WSD status, material list and revenue status. Preparing revised BOQ and getting technical approval based on specs, client requirements and site conditions and prices approval in coordination with tendering section and variation requests (cost-plus contract). 7- Submitting FRIs and technical proposals (conflicts study and solutions). 8- As-built plan for drawings and QS for closing the project revenue and initial handover. 9- Engineering QS with wastes percentages for purchase requests. 10- Delivering Technical packages and quantities to procurement department for acquiring suppliers and sub-contractors. 11- Structural calculations approvals for fixation of stone cladding, handrails, fascia, curtain walls, BMU which is prepared by suppliers according to wind loads. 12- Client invoices included supporting documents; approved QS, IRs, MIRs (Material Inspection requests). 13- Sub-contractors’ invoices according to contracts conditions, payment percentages and progress percentages.
  • Structural section HeadFull Time

    Redcon Construction. S.A.E., New Alamein coastal High Rise Tower

    Oct 2018 - Mar 2022 -3 yrs, 5 months

    Egypt , Cairo

    • Job Details:Delegate tasks and technical information to the team members. Creating and updating workflow chart. And liaises with the PM and CMs Attending progress meetings, discussing and suggesting technical proposals and inquiries to consultant (RFIs & RFPs) Coordinating between the construction and engineering teams ensuring that the construction requirements are conveyed to the engineering terms and that the engineering deliverables satisfy the construction requirements and work-time line. Discussing technical issues with architectural, structural and MEP heads. Reviewed the work shop drawings (formwork, reinforcement details and BBS). And As-built drawings. Reflecting the approved formwork and modifications in the Revit Model up to date. Reviewed coordinated concrete dimensions (by Revit) with arch & MEP drawings in accordance with approved builder work (MEP) drawings and IFC DWGs and delivering to the outsourced structural designer. Managing the contracts and invoices related to the engineering consulting work: Slabs structural design (Dr. Amr Abdul Rahman – AACE). Steel floors and spires (Antenna). structural design (Dr. Abdul Aziz Mahmoud – ECU). Steel details WSD (Alex Steel Co.). The tower structural design review (Dr. MOH SHOHAYEB). Wind Tunnel Test for façade curtain walls design and wind reduction in outdoor zones (WINDTECK Co.-Italy). Performed the post tension structural design for slabs through outsourced bureau considering the MEP equipment loads and landscape layers loads. Presentation and dashboards for approvals status, obstacles and deliverables plan. Discuss design and technical issues with consultant Tech. office manager to get suitable solutions. Planning the department tasks, organizing and leading the team, evaluate the employees and monitor the production rates. Update the staffing plan. Monitoring the delay claims related to the technical approvals.
  • Education

    • Bachelor's Degree in Civil engineering

      Alexandria University (ALEXU)

      Jan 2006 

    • High School - Thanaweya Amma

      Gamal abdul naser high school

      Jan 2001 

    Achievements

    Performed and reviewed all work-shop drawings and slabs design drawings for the Alamein high-rise tower: 44 floors (slabs and vertical elements), the tower, 4000 m2. 5 floors, 16 parts for the podium (32,000 m2) added to: 700 RFIs, requests for information. 270 RFPs, requests for proposal (technical proposals and issues remedying). As-built drawings (form-work and reinforcement details). Managing engineering consultants contracts and scope (4 outsourced parties) as following: -Post tension slabs design (more than 80 slabs) included all types of loads, MEP equipment loads, landscape and tree-pots loads. -Building design review. -Steel floors design drawing and work-shop drawings. Provide technical solutions for site problems and preparing its change orders and cost estimation. Take a part in the project delay claims concerning the technical approvals delay and modifications and getting the time extensions. Provide technical solutions for improving and increasing project progress.

    Skills

    View More

    Languages

    • Arabic

      Fluent
    • English

      Intermediate

    Training & Certifications

    • Leaders Preparation Program

      Ein-Shams Uni.·2020
    • FIDIC Contract Management

      Egypt Syndicate of Engineers·2016