WH

Weaam Hendy

Mechanical Manager - Maintenance & Planning

Glim, Alexandria, Egypt

Work Experience

  • Mechanical Manager - Maintenance & PlanningFull Time

    EDRA POWER HOLDING SDN BHD

    Jan 2014 - Jan 2022 -8 yrs

    Egypt , Alexandria

    • Job Details:Achievements & Job description:  100 KUSD cost saving in design and fabrication a new stop log gate to secure the plant availability 2x360 MW. (Best Practice Achievement)  Perfect Negotiation to have 20% discount in major service by OEM.  Turnaround Perfect Management under shortage in resources.  30% cost reduction in maintenance budget.  Reduce the external manpower by 40% through COVID-19 pandemic.  Keeping the integrated management system for the preventive / corrective maintenance activities for all plant equipment, and maintain HSE focus.  On-Line Critical maintenance in water treatment plant, boiler system, turbine system, and auxiliary systems without shutdown.  Keep the team in well understand and apply Safety and Quality standards.
  • Senior Mechanical Engineer (Engineering in Power station).Full Time

    EDRA POWER HOLDING SDN BHD

    Apr 2010 - Dec 2013 -3 yrs, 8 months

    Egypt , Alexandria

    • Job Details:Achievements & Job description:  Professionally Manage Projects and improve the annual budget by 15-20%.  Upgrade and improve the Root Cause Analysis procedure.  Control the operation and maintenance procedures.
  • Mechanical Engineer (Power station Consulting/Engineering).Full Time

    Bechtel

    May 2009 - Apr 2010 -11 months

    Egypt , Cairo

    • Job Details:Achievements & Job description:  Consulting & Engineering service project and review project specifications.  Conflict Management, Mentoring & Coaching in assigned projects.  Review/approve the contractor drawings, data sheets and O&M manuals.
  • Operation Field Engineer (Operation in Power station).Full Time

    EDRA POWER HOLDING SDN BHD

    Jan 2001 - May 2009 -8 yrs, 4 months

    Egypt , Alexandria

    • Job Details:Achievements & Job description:  Train the team on the plant system safe start up, shut down using DCS.  Upgrade the Water Treatment performance through power reduction.  Create operation procedures for the as built modified operating systems.
  • Education

    • Bachelor's Degree in Engineering - Mechanical

      Alexandria University - Faculty of Engineering

      Jan 1999 

    Achievements

     100 KUSD cost saving in design and fabrication a new stop log gate to secure the plant availability 2x360 MW. (Best Practice Achievement)  Perfect Negotiation to have 20% discount in major service by OEM.  Turnaround Perfect Management under shortage in resources.  30% cost reduction in maintenance budget.  Reduce the external manpower by 40% through COVID-19 pandemic.  Keeping the integrated management system for the preventive / corrective maintenance activities for all plant equipment, and maintain HSE focus.  On-Line Critical maintenance in water treatment plant, boiler system, turbine system, and auxiliary systems without shutdown.  Keep the team in well understand and apply Safety and Quality standards.  Professionally Manage Projects and improve the annual budget by 15-20%.  Upgrade and improve the Root Cause Analysis procedure.  Control the operation and maintenance procedures.  Consulting & Engineering service project and review project specifications.

    Skills

    Languages

    • Arabic

      Fluent
    • English

      Advanced
    Share this Profile