profile-img

Waleed Mohiey Almashad

Operation and work shops Manager

Khobar, Saudi Arabia

Work Experience

  • Operation and work shops ManagerFull Time

    Concord for engineering and contracting

    Jan 2015 - Dec 2018 -3 yrs, 11 months

    Egypt , Ismailia

    • Job Details:- Coordinate and organize processes between production, Quality and planning. - Responsible for achieve target in Segment plant ant reinforcement steel workshops. - Organize processes between operators to increase their efficiency. - Manage and control all operation between sites and plant and workshops. - Responsible for organize and coordinate equipment usage in site. - organizing the repair and routine maintenance of production equipment - liaising with buyers and marketing and sales staff - supervising the work of junior staff - organizing relevant training sessions - assessing project and resource requirements - estimating, negotiating and agreeing budgets and timescales with clients and managers - ensuring that health and safety regulations are met - determining quality control standards - overseeing production processes - re-negotiating timescales or schedules as necessary - selecting, ordering and purchasing materials
  • Production ManagerFull Time

    EVERGROW FOR SPECIALIST FERTILIZERS AND PETROCHEMICAL INDUSTRIES[

    May 2011 - Dec 2014 -3 yrs, 7 months

    Egypt , Monufya

    • Job Details:- Improve the operational systems, processes and policies in support of organizations mission specifically, support better management reporting, information flow and management, and organizational planning. - Manage and increase the effectiveness and efficiency of production, Quality, planning, Maintenance departments through improvements to each function as well as coordination and communication between it. - Play a significant role in long-term planning, including an initiative geared toward operational excellence. - Organization of fiscal documents. - Regular meetings with Executive Director around fiscal planning. - Supervise and coach office manager on a weekly basis.
  • Production ManagerFull Time

    Akef Group for packaging and printing technology

    Jan 2010 - Apr 2011 -1 yr, 3 months

    Egypt , Giza

    • Job Details:- Responsible for achieve production target at accordance in production plan. - Responsible for resolving production problem and Maintain production processes to decrease mistakes and increase productivity and quality. - Responsible for applying and review on training plan for new operators and measure and evaluate the operator's efficiency and performance after training. - Follow up the maintenance plan with maintenance Department for machines. - Share quality department to implement and applying QSM according to international standards(ISO 9001:2008, OHSAS 18001:2007, ISO 14001:2004 and ISO 22000:2005) and customer requirements - Motivate operators to be more effective and competitors for each other
  • Production Section HeadFull Time

    Volex Wagen VW, Fiat, Temsa and Yazaki projects

    Feb 2007 - Oct 2009 -2 yrs, 8 months

    Egypt , Giza

    • Job Details:- Supervise and manage all projects' management processes between engineering department and other departments. - Responsible for training new engineers and support them to resolve projects problem. - Manage and supervise preparing projects cost studies while BOM, Man power, Time and Machine consumption. - Make projects plans and follow it up. - Supervise production and quality processes. - Manage projects modifications and be sure from that meet customer requirements. - Review production processes and share to improve it, and develop engineer's skills. - Review assembly boards design and improve it. - Applying lean manufacturing methodology and train engineers to learn its basics. - Share quality department to implement and apply QMS according to special standard Such as ISO TS 16949 and general international standards (ISO 9001:2008, OHSAS 18001:2007, ISO 14001:2004) - Review quality procedures on production lines as Internal Auditor.
  • Education

    • MBA in Global Buisness

      ESLSCA Business School

      Jan 2017 - Jan 2019 - 2 yr

    • Technical Diploma in Certified Executive Manager

      Ain Shams University (ASU)

      Jan 2018 - Jan 2018 - 0 Month

    • College Diploma in Operation management

      Knowledge

      Jan 2010 - Jan 2011 - 1 Year

    • Technical Diploma in Total Quality Management

      TUV

      Jan 2009 - Jan 2010 - 1 Year

    Achievements

    when i worked in Ever grow in Granulation plant i modified design of production line to improve production processes which reduced emission heat and dust and reduce number of operators to hire them in an other plant in group also increase production about 8% and save Gas consumed about 12%. and in Chloride Calcium plant i suggested to increase dryers with isolation system to save required heat in dryers also add in dryers design vapor gas line to prevent CaCl2 accumulation and use these line when accumulation occurred to melt in mid valves and tubes.

    Skills

    • Ipmrovement Process
    • Microsoft Office
    • Planning
    • Manufacturing
    • Negiation
    • Accounting
    • User oracle
    • PC hard ware
    • Logisitc
    • AutoCAD

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • NEBOSH

      The international Occupation safety and health·2013
    • implementation and applying Quality system

      LARSN Consultant Agency·2008
    • MS Office and MS project

      Micro soft·2005
    • Conversation English

      Berlitz·2005
    Share this Profile