WI

Waleed Abdelhamid Ibrahim

Project Management Consultant at WE DESIGN STUDIO

Madinaty, Cairo, Egypt

Work Experience

  • Project Management ConsultantFull Time

    WE DESIGN STUDIO

    Mar 2023 - Present -2 yrs, 3 months

    Egypt , Cairo

    • Job Details: JUTEN Egypt Head Office at the 5th District (Design and Supervising). • Project consist of 1 basement + G+2 / BUA 495 m2. • Total amount of the project is 8 million EGP  Narmer American College at the 5th District (Redesign and Supervising). • Project consist of G+2 / BUA 16800 m2. • Total amount the project is 5.8 million of EGP  EAST SIDE Building at MU 23 Area in the New Administrative Capital (Redesign - Value Engineering). • Project consist of 2 basements + G+11 / BUA 58120 m2. • Total amount the project is 780 million of EGP  CASTLE LANDMARK Compound at R7 in the New Administrative Capital (Redesign - Value Engineering). • Project consist of 44 Building / Plot Area 44 acre. • Total amount the project is 3.4 billion of EGP
  • Project ManagerFull Time

    Misr for Central Clearing, Depository and Registry

    Aug 2018 - Mar 2023 -4 yrs, 7 months

    Egypt , Cairo

    • Job Details:Projects Manager in the New Administrative Capital August 2018 – March 2023 where I am responsible for:  Manage project package consist of (Tender package – Coast – Planning – Time).  Planning and tracking all project activities, establishing scheduling risks and opportunities to deliver projects on time.  Coordinate the timely delivery of all drawings as per instructions.  Coordinate with clients for technical issues  Oversee Tender Documents, including pre-tender briefings and As-Built drawings, while interfacing with Operations, Commercial Management, Marketing, Sales, and Leasing teams • Project consist of 3 basements + G+9 / BUA 47800 m2. • Total amount of the project is 1.05 billion EGP
  • Project ManagerFull Time

    Proman Egypt Project Management Co

    Jun 2014 - May 2018 -3 yrs, 11 months

    Egypt , Cairo

    • Job Details: Project Manager, New Layan Compound June 2014 – May 2018 where I am responsible for:  Report on project development, monitor unit performance, and provide support across various stages, from design  Analyses structural drawings given by clients  Coordinate the timely delivery of shop drawings as per instructions.  Coordinate with clients for technical issues  Coordinate with other involved departments (Operations, Site Supervisors, Project Coordinator)  Communication with Sales Department in absence of Head of Engineering. • Plot Area 237 acre / 1266 Villa. • Total amount of the project is 2.87 billion EGP
  • consultant engineerFull Time

    E.C.C Consultants Office

    Dec 2010 - Jun 2014 -3 yrs, 6 months

    Egypt , Cairo

    • Job Details: Reviewing the received designs from the head office regarding the project’s designing and execution being one of the high luxuries projects at the 5th District including the establishment of 530 Villas in addition to 36 Palaces. Handling the Coordination Task between the project's owner and the project contractor regarding the presented designs and drawings, the supplied materials and the project execution steps. Supervising the construction works as a Consultant Engineer at the Consultancy Department solving all the occurred construction problems during the execution through putting a proper solution within the estimated time frame suiting the lower cost option
  • Education

    • Bachelor's Degree in Architectural Engineering

      Higher Institute of Engineering at Al Shorouk City

      Jan 2001 

    Skills

    • Engineering
    • AutoCAD Architecture
    • Adobe Photoshop
    • Revit
    • Primavera 6.0
    • Microsoft Office

    Languages

    • Arabic

      Fluent
    Share this Profile