WB

Wafaa Zaki Bishara

Technical Office Manager

Masara, Cairo, Egypt

Work Experience

  • Technical Office ManagerFull Time

    Lafarge

    Nov 2007 - May 2012 -4 yrs, 6 months

    Egypt , Cairo

    • Job Details:Technical Office Manager: Supervising and reviewing • Producing the architectural design for the cement plants and their belongings • Expert of using AUTOCAD in designing and producing the Cement Plant Layout and their belongings • Coordinate with all project sites and update the project on a regular basis monthly • Applying the revised roads, utilities, networks and the non production buildings drawings and revise their coordinates with the layout • Generating many proposals for the new projects • Studying the technical Parts of the offers • Evaluate and compare the offers of new projects • Design flow sheet, mass flow, equipment List for the Call For Tender of new projects • Implement of Lafarge coding system for ongoing projects and for CFT of new projects • Study the design criteria applied in Lafarge Plants and implement it in design • Attending meetings for prebaration for the projects Projects which I participated in producing them: Algeria-Sigus and Msila plants, Kuwait-Shuaiba cement plant, Cameron-Figuil cement plant, KSA-Alsafwa cement plant, Syria-Aleppo cement plant, Morocco-Agadir plant, Iraq-Karbala station, Cameron-Bonaberi- Pozzolana Drying station
  • Senior Engineer-Design OfficeFull Time

    Orascom Construction Industries (OCI)

    Jun 2005 - Oct 2007 -2 yrs, 4 months

    Egypt , Cairo

    • Job Details:Senior Engineer-Design Office • Expert of using AUTOCAD in designing • Generating Project Master Plan and producing the architectural drawings • Generating many proposals for the new projects • Coordinate with all project sites and update the project on a regular basis monthly • Evaluate and compare the offers of new projects • Study the design criteria applied in OCI projects and implement it in design • Attending meetings for prebaration for the projects Projects which I participated in producing them: Participate in working in the following Plants projects: ACC(Algeria cement plant) MSILA, CIBA (Algeria cement plant) WAHRAN, PCCL (Pakistan cement plant ) CHAKWAL, BCC (Iraq cement plant) BAZYAN, EMCC (Emirates cement plant) FUJAHRA, UNICEM (Nigeria cement plant) CALABAR, ALEPPO (Syria cement plant ) ALEPPO, ALSAFWA (Saudi Arabia cement plant) ALSAFWA
  • Technical Office EngineerFull Time

    Abu Dhabi Company for Touristic Investment(2W)

    Jun 2002 - May 2005 -2 yrs, 11 months

    Egypt , Cairo

    • Job Details:Technical Office Engineer Producing the Layout and preparing the working drawings and perspectives for the Villas Projects which I participated in producing them: Empire Resort project  5 Stars Hotel With120 Rooms, Restaurant, Café shop…  150 Villa and Houses With Different patterns  Entertainment Areas ,Swimming Pools ,Gardens and playgrounds
  • Technical Office EngineerFull Time

    Egyptian Company for modern construction

    Jan 1995 - Nov 1999 -4 yrs, 10 months

    Egypt , Cairo

    • Job Details:echnical Office Engineer Producing the Design and preparing the working drawings and perspectives for the Villas Projects which I participated in producing them: Pyramids Housing Complex: Alex-Cairo desert road compound which Consists of:  12 Villas two types.  Swimming pool  Healthy club 440 m2 including GYM and squash court.  Interior and exterior fences.  Site landscape and the interior roads.
  • Education

    • Bachelor's Degree in Architect

      Helwan University

      Jan 1990 

    Skills

    Languages

    • Arabic

      Fluent
    Share this Profile