profile-img

Wadie Naggar

Technical Chief Engineer at Orascom

New Cairo, Cairo, Egypt

Work Experience

  • Technical Chief EngineerFull Time

    Orascom

    Jul 2015 - Present -9 yrs, 11 months

    • Senior Projects Coordinator EngineerFull Time

      Orascom Construction Industries

      Mar 2013 - Jul 2015 -2 yrs, 4 months

      Egypt , Cairo

      • Job Details:• Responsible for following up all mechanical orders with different team members to achieve project schedule with best delivery time. • Responsible for organizing meetings between consultant, suppliers and OCI team members to introduce and finalize technical clarifications. • Responsible for preparing actual status reports of the mechanical orders for management. • Organizing the project to achieve the delivery date through following up the technical Procurement Department, Engineering Department.
    • Senior Technical Office EngineerFull Time

      Orascom Construction Industries

      Aug 2008 - Dec 2012 -4 yrs, 4 months

      Algeria , Oran

      • Job Details:• Responsible for preparing/reviewing welding maps for piping isometric drawings. • Take off piping material from isometric drawings. • Preparing monthly workshop progress report. • Responsible for the material department. • Responsible for SMS (Site Management System); mechanical, piping, electrical and Instrumentation work. o Studding export piping reports, checking material availabilities according to its relative isometrics drawings for workshop fabrication; Carbon steel and stainless steel. o Issuing equipment’s according to time schedule and priorities on site. o Reserving piping material to workshop for pre-¬fabrication according to welding maps and as per modified isometrics with the material availabilities on site. o Modifying the SMS database according to modified isometrics in order to achieve the actual status of available material. o Manually importing database of the arrival pipe supports and OCIC shipments on site. o Issuing erection, pipe support and instrument material to site for finalizing the erection work. o Handling and checking the material delivered, checking the actual stock after issuing the material. • Co-ordinates between UHDE (Sub Contractor) and SORFERT (Owner) to achieve their requirements
    • Technical Office EngineerFull Time

      Orascom Construction Industries

      Feb 2007 - Mar 2008 -1 yr, 1 month

      Iraq

      • Job Details:• Responsible for Cement Line ranging from Clinker building to packing building • Responsible for Cement arrival material: o Inspecting the material arrival. o Preparing Mechanical erection voucher according to site priorities. • Responsible for subcontractors; Steel structure and Insulation subcontractors: o Preparing documents, vouchers according to the available material. o Quantity surveying on site to issue the final invoice. • Preparing packing list of the material, drawings for starting erection • Preparing time sheet for the modifications and extra works. • Co-ordinates between site, head office and the main contractor (POLYSIUS)
    • Education

      • B.Sc. of Mechanical Power Engineer in Mechanical Power Engineering

        Higher Technological Institute - 10th of Ramadan City

        Jan 1999 - Jan 2005 - 6 yr

      • High School - Thanaweya Amma

        St. Fatima School

        Jan 1999 

      Skills

      • Microsoft Word
      • Microsoft Excel
      • Microsoft Windows
      • Microsoft Outlook
      • Internet Research
      • Adobe Acrobat
      • AutoCAD

      Languages

      • Arabic

        Fluent
      • English

        Advanced
      Share this Profile