profile-img

Tarek Ezzat Abdelsattar Battal

Gas turbines&gas compressors engineer

Suez, Suez, Egypt

Work Experience

  • Turbine supervisor engineerFull Time

    GUPCO

    Jan 2015 - Present -10 yrs, 5 months

    Egypt , Red Sea

    • Job Details:Role— Supervision and technical support for offshore gas lift P/F Duties/responsibilities Technical support and troubleshooting assist for shift engineers and shift foremen Supervise/apply time-based, condition-based and break down maintenance and overhaul activities Perform bore scope check for gas turbine internals (combustion chambers, turbine blades, air comp. Blades…..etc) Perform laser alignment for platform rotating equipment Follow-up P/F and involved equipment status (Specially safety critical) on daily basis reported by shift engineers Prepare work procedures, permits, risk assessment and other correspondences related to PTW system Plan and schedule for PM activates, material handling, manpower, duration and activities to be carried out Prepare PUR (process upset report) for unscheduled S/D’s and other required reports. Participate in HAZOP and FCP (Facility change proposal) meetings for any changes’ study in the field Review vendors’ offers regarding material, spare parts and Overhaul preparation. Review material stock, develop purchasing requests and update spares specs through Maximo system Participate in annual budget development for maintenance and overhauls strategy
  • Senior Turbine engineerFull Time

    GUPCO

    Oct 2007 - Dec 2014 -7 yrs, 2 months

    Egypt , Red Sea

    • Job Details:October 2007 – December, 2014 (GUPCO JV British petroleum) Title— Senior turbine engineer Role— Operation and maintenance shift engineer for an offshore plant, zone 2 classified, Gas lift operation Equipment in command Two units of SULZER gas turbines with output power of 6.4 Mw each work as a prime mover Two units of SULZER turbo-compressors train as a driven units, each train contains split and barrel type design for low and high pressure compressor respectively both supervised by Bently Nevada vibration monitoring system Simatic PLC control system, Siemens_step 5 software for control and monitoring the whole plant components Compressors inter-stage/after-stage coolers and process scrubbers equipped with protection /monitoring instrumentations i.e. pressure, temperature and flow switches and/or transmitters Glycol de-hydration/regeneration package for gas post-treatment processing Two generators driven by two aero-derivative Alison gas turbines controlled by Allen Bradly control system, Logix 5000 software Duties/responsibilities Continuous monitoring for all platform equipments to ensure safe operation depending on system readings and take necessary corrective actions including S/D, if required Execute time-based, condition-based and break down maintenance activities considering material, man power and time frame planning. Perform required calibrations for switches and transmitters Troubleshooting for any unscheduled shut-down related to both, PLC control system and/or mechanical problem Reporting to turbine dept. Head platform status on daily, weekly and monthly basis PROJECTS INVOLVED April 2008/October 2010/April 2018 Description— Major Gas Turbine Engine overhauls for SULZER S3 heavy duty gas turbine Responsibilities Engine complete tear down to the unit center line Dismantling/Assembling of engine parts (i.e. Gas generator rotor/blades, Turbine blade carrier, hot gas casing, flame tubes…..) Participate in measurements/Adjustments carried out by OEM rep. such as rotor alignment, bearings stress, tip clearance, balancing. Instruments check/replacement like bearings RTD's, Exhaust thermocouples, transmitters, switches……etc Prepare and secure required spare parts needed for overhaul and supervise overall project time frame Report progress to Turbine dept. head on daily basis
  • DCS operation engineerFull Time

    Ayoun Moosa power station

    Jan 2007 - Oct 2007 -9 months

    Egypt , Suez

    • Job Details:ROLE OPERATION AND MONITORING FOR UTILITY/AUXILIARY SYSTEMS CONTROLLED BY DCS EQUIPMENTS IN COMMAND TWO BOILER'S FEED WATER PUMPS DRIVEN BY STEAM BABY TURBINES BOILER'S FEED WATER HEATERS AIR SUPPLY SYSTEM CONTAINING THREE CENTRIFUGAL COMPRESSORS FOR PNEUMATIC VALVES OPERATION AND INSTRUMENTAION COOLING AIR SUPPLY WITH TWO DRYER UNITS  COOLING/SEA WATER PUMPS WITH DIFFERENT TYPES AND CAPACITIES DUTIES/RESPONSBILITIES FOLLOW-UP ALL UNIT UTILITIES CONDITION PREPARE STATUS REPORT FOR UTILITY EQUIPMENTS ON DAILY BASIS REPORTING TO SHIFT FIRST ENGINEER
  • Education

    • Bsc in Mechanical power engineering

      Zagazig University (ZU)

      Jan 2001 - Jan 2006 - 5 yr

    Achievements

    I have been graduated on 2006 with rating "very good with honorary degree" my ranking was fourth on my class "mechanical power engineering class"

    Skills

    • Gas turbine
    • Gas compressors
    • operation
    • Microsoft word, excel and outlook
    • AutoCAD

    Languages

    • English

      Advanced

    Training & Certifications

    • MARINE SURVIVING AND FIRE FIGHTING

      ARAB ACADEMY FOR SCIENCE, TECHNOLOGY AND MARITIME TRANSPORT·2013
    • OFFSHORE HELICOPTER UNDER WATER ESCAPE (H.U.E.T)

      ARAB ACADEMY FOR SCIENCE, TECHNOLOGY AND MARITIME TRANSPORT·2012
    • GAS TREATMENT PROCESSES AND DEHYDRATION

      GESCO GROUP COMPANY ·2010
    • MEASURMENTS AND CONTROL SYSTEM

      GULF TECHNICAL AND SAFETY TRAINING CENTER ·2009
    • PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 2

      OIL AND GAS SKILLS COMPANY ·2009
    • GAS COMPRESSORS

      GESCO GROUP COMPANY·2009
    • GAS TURBINE OPERATION AND MAINTENANCE

      ALRESALA TRAINING AND CONSULTATION CENTER·2009
    • PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 1

      OIL AND GAS SKILLS COMPANY·2009
    • MECHANICAL FAILURE ANALYSIS

      STUDIES AND TRAINING CENTER, CAIRO UNIVERSITY·2009
    • MAINTENANCE FOR ENGINEERS

      SUEZ PETROLEUM COMPANY, TRAINING CENTER·2008
    • HELICOPTER SAFETY INTRODUCTION

      GUPCO·2007
    • STEAM TURBINE AND FEED WATER HEATERS

      AYOUN MOUSA POWER STATION·2007
    • MAIN AND AUXILIARY BOILERS OPERATION

      AYOUN MOUSA POWER STATION·2007
    Share this Profile