profile-img

Tarek Awwad El Gammal

Supply and Planning Manager @ Haier |Home Appliances | Ex. LG Electronics

Zagazig, Sharqia, Egypt

Work Experience

  • Supply Chain ManagerFull Time

    Haier Egypt

    Nov 2023 - Present -1 yr, 7 months

    Egypt , Sharqia

    • Job Details:Managing the full cycle of the WM factory from managing demands to supplying full products achieving the quality standards of Haier and saving costs of operation and logistics, also improving manpower capabilities. Building strategic planning for the manufacturing process from scratch including machines and processes. Following up the sales demands to provide the required materials matched with demands to supply on time. Control materials MRP to achieve sales considering materials lead time and customs clearance logistics. Arranging supply plan with sales following the process of issuing PO and loading plan then closing orders on time Controlling production plan by managing CKD materials, local materials, and in-house suppliers' materials. Achieving daily production plan by applying Haier global quality standards during the production process. Controlling pre-assembly lines to make semi-finish goods products before feeding to the final line. Manage KPIs PPA3, OTD1, DFR, Achievement Rate, LTI.
  • Lg Electronics

    • Senior Supply Chain PlannerFull Time

      Mar 2022 - Present -3 yrs, 3 months

      Egypt , Sharqia

      • Job Details:- Discuss the Yearly Plan (Basic Plan) with headquarters management specialists in quarter 4. - Manage shipping plan for the next six months in advance to secure Materials and vessels - Follow Material Visibility for (M+3) three months to secure sales and achieve factory KPIs and customer satisfaction. - Arrange the Production Plan for three months, frozen for two weeks, and fixed for three days. - Manage domestic sales in Egypt and Export in the Middle East and Africa through full communications with sales offices - Manage Material status with Procurement Part for Long term - Manage Material status with In-house, Local suppliers, and Material Parts for short-term - Share and Manage Production Plans based on Material Visibility and Vessels schedules - Manage LG Line Capacity matching with suppliers' Capacity. - Manage Long Term Inventory for Materials and full set. - Responsible for KPIs, PPA3 [Production Plan Accuracy], and OTD [On Time Delivery].
    • Planning EngineerFull Time

      Mar 2021 - Mar 2022 -1 yr

      Egypt , Sharqia

      • Job Details:- Full management for LG Production Plan [Factory Plan] - Arrange a Production plan for three months according to the shipping plan and vessel schedule - Follow up MRP for imported materials daily basis. - Follow up MRP for Local material delivery including Printing materials [SMD], BOX and Carton, Balance Weight - Follow up new models DV Events with R&D. - Discus supplier's capacity to consider at production plan capacity and HQ target. - Secure LG KPIs like Production Plan Accuracy [PPA3]. - Arrange daily production plan sequence, and secure imported materials and local ones. - Fix production plan 3 days following LG standards.
    • Quality Assurance AnalystFull Time

      Jan 2021 - Mar 2021 -2 months

      Egypt , Sharqia

      • Job Details:• Manage quality of LG WM main line to reduce quality issues matching LG and global standards of quality and improving TLDR. • Control LG in-house suppliers to reduce part return rate and enhance the quality standard of operators by utilizing blind test tools and improving self/successive checks. • Cost saving for the Company by improving internal Failure Cost [IF-cost], managing re-work process cost and repair area, and controlling Idle time caused by quality issues.
    • Production EngineerFull Time

      Jul 2019 - Jan 2021 -1 yr, 6 months

      Egypt , Sharqia

      • Job Details:• Control LG WM production Line, producing specific daily production quantity and improving line efficiency through creative activities and line Balance. • Utilize Lean Six Sigma to enhance every single process on Line and improve neck process, controlling T/T and decreasing ST. • Responsible for covering daily production quantity, regardless of sudden circumstances like stopping the machine, material shortage, quality issues, or high absence rate by improving multifunction.
    • Research And Development EngineerFull Time

      Jul 2019 - Jan 2021 -1 yr, 6 months

      Egypt , Cairo

      • Job Details:• Responsible completely for producing the first time LG made in Egypt Full product, WM Top Loader, involved in set up level with IE part, improving activities on main Line, process time saving, decreasing ST, and increasing UPH. • Utilize my professional experience of Bench Marking through an Overseas Business Trip to Changwon, South Korea to produce a New Model [Vivace Pro] for the first time to be completely made in Egypt. • Control all new models in LG at the level of the Production gate [P-Gate] to move from the development level to the mass production level by measuring the possibility of producing the new model on the Main Line. • Awarded The Grand Prize as the best Manufacturing Team in LG Egypt at the Annual ceremony of 2020.
  • Active MemberFreelance / Project

    Faculty of Engineering Zagazig University

    Sep 2016 - May 2017 -8 months

    Egypt , Sharqia

    • Job Details:• Participating in design and manufacture Solar Car. • Cooperated with (+40) active engineering.
  • Innovation AmbassadorInternship

    Technology Innovation & Entrepreneurship Center (tiec)

    Jan 2016 - Jan 2017 -1 yr

    Egypt , Cairo

    • Job Details:• Relevant creativity and innovation Course.
  • Activities

    • Mechanical Designer & Leader at Zagazig University Formula Student

      Student Activity

      Aug 2014 - Aug 2017 -2 yrs, 11 months

    • Volunteer at Resala Charity Organization

      Volunteering

      Sep 2014 - Sep 2016 -2 yrs

    Achievements

    China business trip to Tianjin to transfer industrial park manufacturing experience to Egypt to build Haier Park Korea business trip to Changwoni to manufacture WM Top Loader and Vivace products for the first time in Egypt 2019 ~ 2021 - Business Trip to Korea - Produce [Vivace Pro] 'Washing Machine Tool' first time in Egypt in 2020 - Produce [Top Loader] 'Washing Machine Tool' the first time in Egypt in 2021 2022 ~2023 - Increased production plan from 300K to 500K - Archived LG standard target at PPA3 and OTD1 2012 ~ 2017 4th place in the London 2015 Formula Student Competition. 2 Place in Open Code Camp global goals 2030. 6 th place in Hackthon Suez Canal. Full Design Formula Car. Full Design Solar Car.

    Skills

    View More

    Languages

    • English

      Advanced

    Training & Certifications

    • Marketing and Entrepreneurship

      TIEC·2015
    • Marketing

      The Greek Campus ·2015
    • Entrepreneurship

      The Greek Campus ·2015
    Share this Profile