Tamer Mohmed Elshamy
Q.C functional manger
Sidi Salem, Kafr Alsheikh, EgyptWork Experience
Q.C functional mangerFull Time
G.S E&C KOREA
May 2016 - Apr 2019 -2 yrs, 11 months
Egypt , Cairo
- Job Details:Job responsibility: • Responsible of inspection of all civil & building Works of Area 2 including: Unit #80 (SRU/TGTU) & Unit #16 (HPU) & Unit #21 (VPU) &the Key Person of Q.A Q.C Team at Area 2 of the ERC Plant. • Reviewing of all Concession Requests, RFI’s, Transmittals & Letters of Technical Queries from Subcontractors, Vendors & Client for all Area 2 civil Work. • Ensure that Sub-contractors’ are working adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures and Site Instruction. • Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site. • Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan (ITP). • Coordinate with the consultant’s representative and Site En-charge for inspection and meeting about quality problems including the closure of Non-Compliance report (NCR). • Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System. • Taking care of QA/QC documents of the entire project including certificates, , test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction. • Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil and building discipline interfacing the multidisciplinary operations. • Reviewing and applying of method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project. • Coordinate with engineering and technical office engineers in case of conflict to drawing in-between multidisciplinary departments. • Attending regular meeting with HSE and environmental representatives.
construction managerPart Time
A.A.Alkhodari Sons Company
Nov 2013 - Nov 2015 -2 yrs
Saudi Arabia , Dammam
- Job Details:Project description: The project located in Al Qatif city in eastern providence of Saudi Arabia. the project consist of main building ( Basement + G + 5 floors ) with 67,000 m2 built up area , 6 buildings ( G + 6 floors ) for nurse accommodation , Technical services Building , 3 guard houses , LPG tanks , mosque , support service building , chillers yard , ST plant , RO plant , electrical substation along with site development. Job responsibility: • Determine and monitor work method and performance of employees and sub-contractor in order to ensure compliance with their obligation. • Coordinate with Technical Department in order to get the latest approved material and shop drawings. • Responsible for all activities of site works. • Guide site engineers’ team to achieve daily target. • Regularly review and monitor HSE concern at site in order to ensure safe working environment. • Apply project management plan and monitoring. • Coordinate design deliverables to site subcontractor. • Monitor, assess resources in order to complete the project within contract period. • Monitor quality of work and coordinate with Quality Control department to ensure that all activities is carried out with specification and standards. • Review method statement, risk assessment and quality control plans. • Coordinate with consultant and client for solving day by day working issues to ensure all activities will end on time.
civil project engineerFreelance / Project
Kharafi National
Jan 2011 - Jun 2012 -1 yr, 5 months
Egypt
- Job Details:1- Project title: Alshabab Simple Cycle Gas Turbines (1000 M.W) (Al Ismailia- Egypt) (EPC project). Owner: East Delta Electricity Production Company (EDEPC) (USD $ 550 million total cost) Owner representative: Power Generation Engineering and Services Company (PGESCO) Sub contractor: Hassan Allam sons, GE electric international, kahromika …etc., Project description : it consists of 8 Gas Turbines + Solar Tanks, Demi Tank, R.O tank + Gas Station + Gas skids + Turbine Auxiliary skids + 2 transformers + All Underground Utilities such as duct banks ; manholes + GIS switch gear ;control; workshop;6.6k.v substation; L.V substation and Administration Buildings….. Job responsibility: • Responsible for all activities in power island area including turbine body foundation and auxiliaries such as (pulling chambers, fin fan cooler, stack foundations, PEECC, washing water recovery pit)…etc. • Hand over from subcontractors to quality control and PGESCO engineers. • Responsible for all activities of storm drain system beside roads. • Guide site engineers’ team to achieve daily target • Arrange daily and monthly report. • Follow time schedule and updating with PCD section. • Arrange meetings with mechanical and electrical engineers for coordination • Aware about safety roles with site engineers. • Attend meetings with Q.C and owner representative PGESCO. • Supervising and inspection of road layers inside plant including subgrades, sub-base and base course works and sign related inspection documents • Inspecting bituminous asphalt layers for roads of the plant. 2- Project title: West Damietta Simple Cycle Gas Turbine (500 M.W) (Damietta - Egypt) (EPC project). Owner: East Delta Electricity Production Company (EDEPC) (USD $ 320 million total cost) Owner representative: Power Generation Engineering and Services Company (PGESCO) Sub contractor: Braun’s Egypt, GE electric international, Hyundai, Schneider …etc., Project description: it consists of 4 Gas Turbines + Solar Tanks, Demi Tank, RO tank + Gas Station + Gas skids + Turbine auxiliary skids + 2 Transformers + All Underground Utilities such as (duct banks , manholes) + plant buildings such as (GIS switch gear ,control, workshop,6.6 k.v substation, L.V substation and administration building ) …..Etc. Job responsibility: • Working in building section and responsible for all activities in 6.6 k.v substation building and control building including concrete works + finishing works. • Hand over to quality control and PGESCO engineers. • Guide site engineers’ team to achieve daily target. • Arrange daily and monthly report. • Follow time schedule and updating with PCD section. • Attend meetings with mechanical and electrical engineers for coordination of work. • Aware about safety roles and other sections coordination. • Attend meetings with Q.C engineers and owner representative PGESCO. • Arrange meetings with subcontractor and technical office engineers in case of conflicts or missing data in drawings. • Following up materials tracking approvals from PGESCO side. • Solve any minor problems in activities during work. • Supervising and inspection of road layers inside plant including subgrades, sub-base and base course works and sign related inspection documents • Inspecting bituminous asphalt layers for roads of the plant.
Education
engineering in engineering civil
Alexandria University (ALEXU)Jan 1994 - Jan 1999 - 5 yr
Achievements
- successful commissioning of Egyptian Refinery company plant at Mostorod. - successful fire up for Alshabab power plant and west damietta power plant .
Languages
Arabic
FluentEnglish
Advanced