  • Projects DirectorFull Time

    SKAI Development LLC

    Jul 2014 - Present -11 yrs, 1 month

    United Arab Emirates , Dubai

    • Job Details:Projects Director SKAI Developments LLC Dubai, UAE As Director of Projects my role include the overall Development and Projects Management of SKAI Developments Portfolio of various 5 Stars Hotels and Residential Buildings in Dubai, with full control of Budget, Cost, Visibility Studies, Design, Tendering, Construction, Handing-over Process, and obtaining approvals from Local & National Authorities, for the following Projects: Viceroy Palm Hotel, Resort and Residential Complex - Dubai, UAE - AED 1,5 B Viceroy Dubai Palm Jumeirah includes 479 large rooms and suites, and 222 signature Viceroy Residences all with breathtaking views of the Arabian Sea made possible by innovative architecture and design. The property will boast 10 of the world's best restaurants along with a gourmet market and bakery. It has over 800 square meters of wellness spa facilities. The resort have over 350 square meters of indoor fitness facilities and three separate outdoor swimming pools – a 106 meter pool for recreation, and the other two for relaxation and children. Suites in the SKAI Hotel and Residential Complex - Dubai, UAE - AED 1,3 billion 2 Projects each include 60 Floors Tower. Suites in the SKAI comprise 234 hotel rooms, 234 one and two bedroom apartments and 33 penthouses. Suites in the SKAI’s unique Tri Star wing structure allows for each room and apartment to incorporate a vast landscaped garden. Suites in the SKAI T1 include five dining venues hosted by world class chefs, including an all-day dining concept, a lobby café, pool bar and grill, sports bar and a rooftop specialty restaurant. Villa Heights @ JVC - Dubai, UAE - AED 150 million 3 Residential Buildings each comprise Basement, Ground Floor, 4 Floors and Upper Floor. The unique design contain various units sizes starting from studio up to 4 Bedrooms, designed in single, duplex and triplex floors as appropriate. With a state of the art Lofts units including private swimming pools.
  • Project ManagerFull Time

    ADPI

    May 2011 - Jul 2014 -3 yrs, 2 months

    Oman , Muscat

    • Job Details:SEEB Airport Terminal Building - Muscat, Oman - OMR 706 million The new SEEB Terminal Complex Project, Including the Piers. 1st Phase with the capacity of 12 Mpax and a total Built up Area 615,000 m². In addition to all supported facilities and ancillary Buildings As a Senior Project Manager, the responsibilities include the Project Management of the overall Design and Construction of the Main Contract 3 including the passenger Terminal Complex, Hangers and all Ancillary Buildings. Overseeing all Consultants and Design/Build Contractors to ensure compliance with the Employer Requirements within time and allocated budget. The responsibility includes Risk Management, Value Engineering, Claims Analysis and obtaining approvals from Local & National Authorities. In addition to the Day to Day interface and coordination with the Client’s Technical Committee and Steering Committee including all major Stakeholders. Preparing and managing all procedure for changes and handover process
  • Deputy Project DirectorFull Time

    ADPI

    Apr 2009 - Apr 2010 -1 yr

    Saudi Arabia , Jeddah

    • Job Details:King Abdulaziz International Airport Project, Jeddah, KSA - € 5 billion New Passenger Terminal Building with a capacity of 30 Mpax, a surface of 650,000 square meters. The facilities related to the development of this terminal include an inter-modal pole of about 100,000 square meters (railway station, underground, buses, automated people mover). Registered for LEED certification. Responsible for the overall management of Design between all consultants, my duties include: - Overall project management and time schedule control. - Plans and establishes a qualified design review team. - Establishes a design criteria, design codes and standards for the project design. - Liaison and coordination with Client, Paris Head Office team, International consultants, local consultants and local authorities. - Coordinate the total project design development effort. - Monitor design submittals for accuracy, completeness and timelines. - Prepare Claims for EOT, acceleration and change orders. In addition, as LEED expert, I have overall coordination of the LEED certification process. Successfully managed the preparation and submission of all design stages including Detail Design, Final Design, Tender Documents and obtaining approvals from Local & National Authorities.
  • Deputy Project DirectorFull Time

    ADPI

    Apr 2007 - Apr 2011 -4 yrs

    United Arab Emirates , Dubai

    • Job Details:Managed two team of Multi-Discipline Professional for the following Fast-Track projects: Tiara United Towers Project - Sheikh Zayed Road, Dubai, UAE - AED1,500 million. Registered for GOLD LEED accreditation, two similar sized (steel structure) towers of 45 stories. One tower is a five star hotel, the other is an office. Terminal 2 Expansion Project - Dubai Airport, UAE - AED 400 million. Project comprises the expansion of Terminal 2 (Steel Structure) Facilities up to 25,500 m2 and up to 3M.pax. In addition to the Engineer’s Representative tasks related to the construction supervision, I had overall responsibility for the Project Management process. Coordinated sustainability & LEED process. Implements Risk assessment and cost control management. Further to the contract management and resolution of claims, variation and EOT based on FIDIC directions. Day to Day interface and coordination with the Client and all major Stakeholders. Preparing and managing all procedure for changes and handover process. State Guest Reception Terminal, Abu Dhabi Airport, UAE - AED 500 million New Presidential Flight VVIP Terminal Building including connection to the existing facilities, Helipad areas and upgrade of the Aprons. Overall responsibility to coordinate the Fast Track Design Project for the design development & Final Design stage, obtaining approvals from Local & National Authorities, and the management of review of all submittals during the Construction. The Fujairah Corniche Resort - Fujairah, UAE - AED 1,400 million Mixed-use development on a seven hectare plot including 5-star business hotel, 4-star resort hotel, commercial offices and apartment development in addition to a retail shopping centre development. Overall responsibility to manage the Concept Design and Visibility Study Phase. In addition to the preparation of the Consultancy Agreement in both English and Arabic FIDIC format. Successfully managed the negotiation with the Client until final agreement conclusion Emirates New Engineering Center - Dubai Airport, UAE - AED 1,500 million The new maintenance centre for Emirates in the Dubai International Airport, comprising 8 hangars (A to H), offices, training centre, and all service and technical supporting areas. With a total build-up area of about 300,000 m². Overall responsibility to manage the Close-Out Phase of the project. Preparing and managing all procedure of testing and snags sign-off. Further to the contract management and resolution of claims, variation and EOT based on FIDIC directions
  • Education

    • MBA in General

      Institute Universitaire Kurt Bosch IUKB

      Jan 2004 - Jan 2006 - 2 yr

    • BSc in Architecture Engineering

      Alexandria University (ALEXU)

      Jan 1984 - Jan 1989 - 5 yr

    • High School - Thanaweya Amma

      Saint Marc College

      Jan 1984 

    Skills

    • Project Management
    • Microsoft Office
    • Primavera
    • value engineering
    • AutoCAD
    • Design Management
    • Microsoft Project
    • Facility Management

    Languages

    • Arabic

      Fluent
    • English

      Fluent
    • French

      Fluent

    Training & Certifications

    • LEED AP

      USGBC·2009
    • PMP

      PMI Project Management Institute·2006
    Share this Profile