profile-img

Elsayed Emira

Senior construction manager (of main contractor) at ABV Rock Group Co.Ltd , KSA;

Heliopolis, Cairo, Egypt

Work Experience

  • Senior construction manager (of main contractor)Full Time

    ABV Rock Group Co.Ltd , KSA;

    Apr 2017 - Present -8 yrs, 4 months

    Saudi Arabia , Abha

    • Job Details:Senior construction manager (of main contractor) for Southern Border Housing Project, Abha , SBH / S02, Residential compound The client: ministry of interior The consultant: Archen Engineering Consultants The contractor: ABV Rock Group Co.Ltd The value of the contract: 2.5 Billions SR Scope of work: turnkey, Design and construction Project elements: Apartments, Villas, ancillary buildings, Infrastructure and Site works Responsibilities: Manage and coordinate between all departments at the project (engineering department / construction department / Procurement department / QA & QC Department / H & S Department / finance department / P&S department) ; Preparing and holding meetings with subcontractors ; Preparing and holding meetings with the consultant
  • Project ManagerFull Time

    AL-Bayan Holding Group - Dar AL-Bayan Real Estate Development Co., KSA;

    Jan 2015 - Dec 2016 -1 yr, 11 months

    Saudi Arabia , Jubail

    • Job Details:Project Manager for Hilton Al-Jubail Hotel (480 rooms), KSA. *Responsibilities include reviewing the drawings and documents of the project; coordination between main consultant and ID consultant; analyzing, evaluating and completing contracting procedures of the contractors offers, achieving the project plan; identifying the needs of the project to achieve the scheduled target; reviewing the drawings and coordination between the various activities; coordination between the project staff; follow-up costs of the project; follow-up work carried out to make sure it is carried out and implemented in accordance with the specifications and drawings; preparation of subcontractors invoices; coordinating meetings with the Consultants and hotel management company; and preparation of the daily and weekly and monthly reports for the following project: - Hilton Al-Jubail Hotel (480 rooms), KSA. Scope of works covered * Design stage (concept, schematic, development and construction documents) * Bidding stage *Construction stage. (Civil, Architecture, Interior design, Electromechanical, Kitchen equipment, laundry equipment and Furniture works) *The project elements (The main building consists of 14 floors, Chalets consists of 12 buildings, indoor and outdoor swimming pools, Staff housing, Infrastructure and Site works ) *total built up area 95,000.00 m2
  • Project ManagerFull Time

    Sharm Dreams Holding Group - Concord for Touristic Development Co., Egypt

    Jun 2009 - Dec 2014 -5 yrs, 6 months

    Egypt , Red Sea

    • Job Details:Project Manager for Hilton Marsa Alam Hotel (500 rooms), Egypt * Duties included achieving the project plan; identifying the needs of the project to achieve the scheduled target; reviewing the drawings and coordination between the various activities; coordination between the project staff; follow-up costs of the project; follow-up work carried out to make sure it is carried out and implemented in accordance with the specifications and drawings; preparation of subcontractors invoices; coordinating meetings with the Consultants and hotel management company ; and preparation of the daily and weekly and monthly reports for the following project: - Hilton Marsa Alam Hotel (500 rooms), Egypt. Scope of works covered * Construction stage (Civil, Architecture, Interior design, Furniture works, Electromechanical, Kitchen equipment, laundry equipment, infrastructure, landscape, swimming pools and water tanks). * Handover and opening stage (handover all project elements to the hotel management company) *The project elements (The main building, Chalets, health club, kids club , Specialty restaurants ,swimming pools, playgrounds , service buildings, Staff housing) *total built up area 100,000.00 m2
  • Project ManagerFull Time

    Future Horizons Contracting Co., KSA;

    May 2003 - May 2009 -6 yrs

    Saudi Arabia

    • Job Details:Project Manager for the following projects: - Baha East , AL-Aqiq and Bisha electrical Substation 132/33/13.8 KV , KSA . (Civil works) - 10 Schools Project, KSA. Scope of works included concrete, finishing, electromechanical, and landscape works.
  • Education

    • Bachelor's Degree in engineering

      • B.Sc., Civil Engineering, Alexandria University, Egypt, 1991.

      Jan 1991 

    Achievements

    • Projects - Hilton Marsa Alam Hotel, Egypt – Project manager - Hilton Al-Jubail Hotel, KSA – Project manager - 132/33/13.8 KV Electrical Substations, KSA - Project manager - Southern Border Housing / residential compounds, KSA. - Construction manager - Coral Beach AL-Montazh Hote , Sharm AL-Sheikh, Egypt – Project engineer - Coral Beach Teiran Hotel, Sharm AL-Sheikh , Egypt – Project engineer - Sports Medical Hospital, Egypt – Project engineer

    Skills

    • Construction manager
    • Project Management

    Languages

    • Arabic

      Fluent
    • English

      Advanced
    Share this Profile