profile-img

Said Mohamed Hasaneen

Water, Wastewater - Senior Civil and infrastructure Engine at Sites International

Qalyub, Qalubia, Egypt

Work Experience

  • Water, Wastewater - Senior Civil and infrastructure EngineFull Time

    Sites International

    Mar 2016 - Present -9 yrs, 3 months

    Egypt , Giza

    • Job Details:Water, Wastewater - Senior Civil and infrastructure Engineer in Zaid Park. Client: New Urban Communities Authority (NUCA) Area: 150 Acres Type: Commercial / Mixed Use Parks & Recreation Project Budget: 150 Million L.E Responsible for:  Supervision of construction works.  Following up the contractors.  Revision of shop drawings and hydraulic calculation.  Monitoring and following up of the project and reporting to the client.  Follow up for the progress of the projects and finding the solutions.  Technical assistance to all project stakeholders. Type of work: 1. Fountains 2. Irrigation network 3. Water network 4. Sewerage network 5. Mechanical rooms
  • Water, Wastewater - Senior Civil and infrastructure Engineer, as well as Team Leader AssistanceFull Time

    EnviroConsult for infrastructure & Env. Studies in association with hydroplan ingenieur gesellschaft mbh

    Jan 2013 - Apr 2016 -3 yrs, 3 months

    Egypt , Cairo

    • Job Details:Position : Water, Wastewater - Senior Civil and infrastructure Engineer, as well as Team Leader Assistance. The project jointly funded by the World Bank and the Government of Egypt with a value of 181 million USD. The project includes the Design Works and Execution of the following in addition to the capacity building and training of the different stakeholders: 1. Wastewater Networks for Ninety-Seven (97) villages using centralized sanitation system 2. Four (4) New Central Wastewater Treatment Plants 3. Wastewater Networks for Thirty (30) villages using decentralized sanitation system 4. Fourteen (14) Decentralized Wastewater Treatment Plants Responsible for:  Review drawings and preparing of BOQ before tendering the project.  Reply for any request for information for the project.  Management work of inspection team.  Follow up the contractors and consulting overall performance.  Revision of shop drawings.  Monitoring and follow up of the projects and reporting to the client.  Coordination with the other consultants.  Technical assistance to all project stakeholders.  Follow up for the progress of the projects and finding of the solutions.  Training and building the capacities of the project stakeholders.  Technical Complaining audits and all going works to ensure compliance for contractors. Type of work:  Domestic water and wastewater networks  Force main.  Manholes.  Pumping Stations ) piping-installation of pump and operation).  Sewage treatments plant. 1. Nimrit El Basl (Gharbiya Gov.) with capacity 8,000 m3/day. 2. Ash-Shahdiy (Gharbiya Gov.) with capacity 8,000 m3/day. 3. Extenstion of Sidi Ghazi (Kafr El-Shikh Gov.) with capacity 3,500 m3/day. 4. Arymon (Kafr El-Shikh Gov.) with capacity 4,000 m3/day.
  • Project manager for Allegria project (Sodic)Full Time

    Shaker consultant group

    Jan 2008 - Jan 2013 -5 yrs

    Egypt , Cairo

    • Job Details:Responsible for:  Management work of inspection team.  Technical Complaining audits and all going works to ensure compliance for contractors.  Review current and final invoice for contractor.  Progress monitoring.  Coordination for taking over certificate for works.  Studying extension for the Project.  Reviewing QA/QC site organization. Type of work:  Domestic water networks (45,465m).  Two domestic tanks including (Piping system – installing of pumps and operation of the system).  irrigation networks (24,165m).  Drainage, storm networks & force main (44,545 m).  valve chambers (209 Nos).  house connection (1,048 Nose).  Manholes (689 Manholes).  Street fire Hydrant (185 Fire Hydrant).  Domestic Water Booster sets (3 sets).  Waste & Sewage submersible pump sets (3 sets).  Fire pump (Diesel - Electric -jokey) pump for two tanks (6 Nose).  Fire Extinguishers for transformers rooms & (2 -D. P).  Follow up with the electrical engineer the excavation, erection of cables and protection by backfilling according to specification.
  • Project managerFull Time

    Saudi Consulting Services (Saud Consult)

    Jan 2004 - Jan 2008 -4 yrs

    Saudi Arabia

    • Job Details:Position: Project manager for the following projects:  Storm water and drainage network in Dammam city  Storm water and drainage network khobar city  Storm water and drainage network katef city.  RO desalination plant. Responsible for:  Managing the design and commissioning of the project.  Review and follow the times schedule.  Preparation for financial duties for the project.
  • Education

    • Bachelor, Civil Engineering (1986-1987) Shubra Faculty of Engineering Zagazig University. in Civil Engineering

      Zagazig University (ZU)

      Jan 1981 - Jan 1987 - 6 yr

    Skills

    • Project Management
    • Construction Mangement
    • Infrastructure Management
    • Microsoft Office
    • AutoCAD
    • Microsoft Project

    Languages

    • Arabic

      Fluent
    • English

      Advanced
    Share this Profile