SV
Sabreesh Vijayan
Maintenance Planner
Salem, IndiaWork Experience
Maintenance PlannerFull Time
Emirates Global Aluminium
Apr 2011 - Dec 2022 -11 yrs, 8 months
United Arab Emirates , Dubai
- Job Details:• Create and Modify Functional Location, Equipment & Work Centre as per the requirement. • Generate various reports such as Plant PM Compliance, Time Confirmation, Shift Orders, Breakdown & incident orders, Material Consumption Report etc. • Upload and verify documents in SAP as per the Department’s requirement. • Communicate & Support the department personnel as and when needed and also provide individual or classroom training based on the requirement. • Study new equipments in the organization and assist in creating Functional Locations, Equipments and Material lists. • Carry out Asset Management procedures to review the health of various assets and take appropriate steps as per the requirement. • Review and suggest Capital Expenditure Projects to the department for improvement and sustenance of the plant. • Create & Modify Notifications, Work Orders and Time Confirmation. • Worked on Business Scenarios like Make to Stock (MTS) and Make to Order (MTO) • Capacity leveling. • Create new material numbers or change material properties in SAP as per the requirement. • Create PR’s for Non Stock Item; carry out technical evaluation of bids and approval thereof. • Co-ordinate with suppliers for timely delivery of material and services. • Stock Overview, Goods Movement & GRN. • Material Inspection, Invoice Verification and approval. • Assess Stock levels and suggest new levels based on consumption pattern and company requirements. • Reviewing of tendering/contract procedures, reviewing of contractor pre qualification, contract controls, preparation of approval for variation orders, attending contractor meetings, quality procedures follow up and implementation there upon.
Mechanical EngineerFull Time
Times Marine LLC
Feb 2010 - Feb 2011 -1 yr
United Arab Emirates , Sharjah
- Job Details:• Design and Drafting, including specialized tools as per project requirement. • Plan and schedule maintenance tasks based on approved designs, availability of ship and labor. • Design Modification. • Specialized design for ship barge.
Piping Engineer Full Time
TR Engineering LLC
Feb 2008 - Aug 2008 -6 months
Oman , Muscat
- Job Details:• Preparation of Material Take Off. • Isometric Control. • Co-ordination for solving design issues. • Assist Lead Engineer in drawing verification.
System Engineer Full Time
Firelink WLL
Jan 2007 - Dec 2007 -11 months
Qatar , Doha
- Job Details:• Site inspection, Quantity survey and Estimation. • Troubleshooting and Program of Simplex fire alarm panels. • Preparation of loop drawing.
Education
Mechanical Engineering in Mechanical Engineering
Rochester Institute of TechnologyJan 2008 - Jan 2011 - 3 yr
Mechanical Engineering in Mechanical Engineering
Anna University ChennaiJan 2001 - Jan 2005 - 4 yr
High School - Other
holy crossJan 2001