  • Construction ManagerFull Time

    LS Electric

    Jan 2021 - Present -4 yrs, 5 months

    Egypt , Cairo

    • Job Details:Electrical construction manager for cairo monorail project Power supply and distribution systems
  • Senior electrical PMC engineerFull Time

    tebodin bilfinger abu dahbi

    Feb 2019 - Dec 2019 -10 months

    Egypt , Suez

    • Job Details:electrical project management consultant (Ain sokhna product hub (oil&gas tank farm) responsible for 1- all site installations inspection and approving for substations 33 kv lighting ,power ,earthing and hat tracing motors solo run and energizing cathodic protection 2-drawings and material data sheets approving 3-pre-commissioning and commissioning activities following up 4-QA & QC ensuring at the site 5- final dossiers approving and MCC following up untill initial acceptance certificates issuing
  • senior electrical engineerFull Time

    GS E&C

    Jun 2015 - Feb 2019 -3 yrs, 8 months

    Egypt

    • Job Details:electrical area manager in oil refinery in cairo ,egypt responsible for a. Supervision and following up of the site erection ,testing and commissioning activities as following Power block & buildings:- Installation of MV/LVSWGR, Transformers, bus duct, Panels & Cubicles (6.6 kv and 400 V). Installation of all Electrical works related to the buildings ( Earthing,Lighting ,Telecom,Fire alarm, access control.) Process field Infrastructure electrical work ( earthing, duct banks, ELP conduit , Cathodic protection…….) Electrical Equipment installation, A/G raceway,MV and LV cable pulling and termination Lighting system, Electrical Heat Tracing, Telecommunication & Fire alarm system. b. Review and evaluate the MOS & TRA of the subcontractors (PTJ,ENPPI,SIAC and orascom). c. Material Estimation & Preparing the BOQ. d. Determine manpower, tools, equipment, and material requirements for each activity. e. Site Inspection and Testing of all electrical Installation to comply with project specifications and approved ITP (MV & LV motors ,panels ,drivers ,….). f. Following pre-commissioning activities for the process and substations g. Operation and maintenance of electrical substation related to utility area.
  • senior QC engineerFull Time

    METITO

    Feb 2012 - May 2015 -3 yrs, 3 months

    • Education

      • College Diploma in Engineering

        Cairo University (CU)

        Jan 2010 - Jan 2012 - 2 yr

      • Bachelor's Degree in electrical engineering

        Menoufia University

        Jan 2004 

      Skills

      • Leadership
      • organized
      • time managment

      Languages

      • English

        Advanced

      Training & Certifications

      • project management for beginners

        PMI·2020
      • Mini mba

        Udemy·2020
      • Iso 9001 lead auditor

        Udemy·2020
      • Team leadership

        Soft skills·2009