SS
Salem Gaber Salem
EXPERIENCED PROJECTS MANAGEMENT
Alexandria, EgyptWork Experience
Senior Project ManagerFull Time
Saudi Bin Ladin Group
Dec 2012 - Present -12 yrs, 6 months
Saudi Arabia , Jeddah
- Job Details:SBG is the biggest construction company in Middle East, having staff over 250K, head office is located at Jeddah City, KSA. I’m now working a Senior Project Manager for a mega governmental project located at Taif City. The initial contract value is SR 1.3 Billion. my responsibilities include all on and off site management issues to facilitate the delivery of the project on time, with approved budget and required quality standards.
General ManagerFull Time
Barons Court co.
Feb 1998 - Jul 2011 -13 yrs, 5 months
Egypt , Alexandria
- Job Details:“Barons Court Sports & Leisure Co. (BCSL) – a joint stock company is developing its project (Alex West) located at the west side of Alexandria City, Egypt of approximate area about 600 Acres (2 500 000 m2) to constitute a comprehensive Sports & Leisure Touristic Resort Community. This unique development is the largest private development within the limit of Alexandria city, it will be developed and controlled to provide the highest quality standards. The goal of this Community is to cater its services and facilities to a specific range of the residential market segment and ultimately offer a prestigious address and a desired destination year-round. The Sports facilities and Golf Course sets the theme for this development thus distinguishing it from other residential communities. The Barons Court comprehensive development shall contain an impressive retail center, 5 stars hotels, an international standard medical center, and other supports facilities that are required for a project of this magnitude.” The total investment cost of the project will reach to Three Billions Egyptian Pound ( about Five Hundred Million USD). During the period from 2005 and so far, completed the construction and then the operation of Radisson Blu hotel of capacity 262 keys, of cost about 200 million pounds, and also completion of construction and finishing work of the Conference Centre of capacity 3000 people, decoration and furniture works are ongoing. In addition to the construction of the first phase and the start of the second phase of 840 residential Villas. Numbers of Villas were sold about 600, of sales value around 850 million pounds, as well as infrastructure work and landscaping, roads and the first phase of the golf course. Responsibilities: 1.Reporting to the Managing Director, managing all technical, non-technical and administrative activities. 2.Setting up the technical and financial plan in cooperation with the different departments. 3.Setting up and monitoring the execution plan to adapt the company’s strategy •Position: Deputy General Manager from Jul 2001to Dec 2000 •Responsibilities: 1.Assist the managing director to manage all activities of the company. 2.Follow up the performance of the different department on daily basis. 3.Assist the managing director to adapt the approved plan of the board of directors. •Position: Engineering Department Manager from Feb 1998 to June 2001 •Responsibilities: 1.Reporting to the Managing director, handling all the engineering and technical activities of Alex West Project e.g., preparing tender documents for: design, supervision, construction and management the different stages of the project. 2.Follow up the progress of the design works with the different consultants.
Deputy General ManagerFull Time
a+b development Consultants, Engineers
May 1983 - Jan 1998 -14 yrs, 8 months
Saudi Arabia , Riyadh
- Job Details:“A+B Development (Arab Bureau for Development) is one of the largest Architecture and Engineering consultancy firms in Saudi Arabia. It was established in 1978 at Riyadh City with a branch in London UK. to provide technical support for the main office. A+B is witness to the construction booming in Saudi Arabia and during this active period was commissioned for the design and construction management of many major projects in most cities of the Kingdom varied between: 1.Public Buildings: e.g. sports facilities, hospitals, hotels and commercial centers. 2.Private Accommodations: e.g. palaces, villas and residential buildings.” A- Position: Deputy General Manager, Manager of Supervision Division. From Jan 1992 to Feb 1998 Major projects completed during this period: 1-Makkah Medical Center Project Makkah, K.S.A •Construction Management of 136 Beds General Hospital. Fully Equipped, turnkey project 2-Dammam Sports Center Project, Phase-II, Dammam, K.S.A •Design and supervision of phases II, •Client: Presidency of Youth Welfare, Riyadh, K.S.A. 3-Design and Supervision of Al-Ghazali Head Quarter Office Building in Sitteen Street, Riyadh. Design and supervision of Taiba Sheraton Hotel & Towers. Taiba Sheraton Hotel and towers is in Medina in the North Central Zone of the Holy Mosque. Approximate area 4000 m2. This project consists of three underground basements, Ground floor, Mezzanine floor and 14 typical floors with the facilities of 5 stars hotel, underground and over head water tanks, Helipad at roof, and all Electro-Mechanical services. A & E Services for General Dynamic Ltd. Co. (USA), in Royal Saudi Land Force (RSLF) Housing Project, Tabuk, K.S.A. Project consists of 152 residential units with full furniture, mosque, car parking, playground area, landscape area and all out door facilities and services, including power house, water and sewage treatment plants, UG water tanks.etc. •Client: Ministry of Defense/ General Dynamics Ltd. Co. •Position in this project was The Project Coordinator, at Riyadh office. B-Position: Projects’ Coordinator, Senior Structural Engineer. From Mar. 1987 to Dec 1991 1- Design of Al Rabieh Hotel, Al-Jouf, K.S.A. 2- Design of Dallah Private Hospital, Al Gassim, K.S.A 3- Design of Staff Housing Complex for Seihat Health and Social Center, Seihat, Eastern Province, K.S.A. C-Position: Project Manager From Feb. 1985 to Mar. 1987 Resident Project Manager for the construction supervision of Al-Hassoun Residential and commercial Center–Olaya–Riyadh. D-Position: Structural Site Engineer Asst. Project Manager From May 1983 to Feb. 1985 • Dammam Sports Center, Phase-I Dammam, K.S.A •Responsibilities: Follow-up and supervision all stages of construction works on daily basis, quality control, preparing reports, review and approve contractor’s payments. Client: Presidency of Youth Welfare, KSA
Site EngineerFull Time
Arab Contractors
Oct 1978 - May 1983 -4 yrs, 7 months
Egypt , Alexandria
- Job Details:• Position: Manager of Technical Office of Faculty of Education Project Alexandria University, Egypt. Responsible for all technical issues of the project,eg shop drawings, payment certificates, variation orders, procurment, time schedule • Position: Site Engineer of Institute of Islamic Studies for Holy Azhar Project, Alexandria, Egypt. responsible for all site activeties, coordination between different subcontractors, inspection and quality control.
Education
MBA in General Management
Arab Academy for Science, Technology and Maritime Transport (AAST)Jan 2007 - Jan 2009 - 2 yr
College Diploma in Structural Engineering
Alexandria University (ALEXU)Jan 1979 - Jan 1981 - 2 yr
BSc in Civil Engineering
Alexandria University (ALEXU)Jan 1973 - Jan 1978 - 5 yr
Skills
Languages
Arabic
FluentEnglish
Advanced