
Ramy El Habashy
Product Line Manager-Kuwait
Dubai, United Arab EmiratesWork Experience
Product Line Manager-KuwaitFull Time
Weatherford Oil Tools
Dec 2015 - Apr 2016 -4 months
United Arab Emirates , Dubai
- Job Details:P&L responsibility of Gas Lift, Hydraulic Lift, Plunger Lift, Capillary, Water Flood, Mud Pumps, Industrial Pumps in Kuwait Providing technical and sales support for group of product lines, such as gas lift, hydraulic lift, plunger lift, capillary services, mud pumps, water injection and petrochemical pumping systems Preparing and submitting marketing material, handling products promotions, maintaining customer contacts, handling publications and attending industry forums. Converting customer needs into solutions and managing the ‘fuzzy front end’ as well as taking input from others and resolving challenging conflicts. Collaboratively working in a team with the engineering department and suggesting specific solutions. Monitoring changes which could impact projects.
Product Line Manager-MENAFull Time
Weatherford Oil Tools
Dec 2014 - Dec 2015 -1 yr
United Arab Emirates , Dubai
- Job Details:P&L responsibility of Hydraulic Lift Systems, Water Flood, Mud Pumps, Industrial Pumps in MENA region Undertaking decisions relating to development of new products and technologies, the time frame they need to be developed in (when), where they need to be introduced and how it is completed in the global marketplace. Delineating the product and required timing, participating in the engineering phase and managing introduced products.
Operations Manager-Eastern HemisphereFull Time
Weatherford Oil Tools
Nov 2011 - Dec 2014 -3 yrs, 1 month
United Arab Emirates , Dubai
- Job Details:P&L responsibility of Hydraulic Lift Systems, Water Flood, Mud Pumps, Industrial Pumps in the Eastern Hemisphere region Developed strategic plans, sourced new business and provided technical support for the eastern hemisphere region. Conducted feasibility studies and analysed model for artificial lift systems. Determined opportunities to improve and optimise production for hydraulic lift systems designs. Prepared and shared engineering procedures, project control procedures and detailed load-out lists for slickline, coiled tubing, well testing and well completion activities integrated with artificial lift operations. Steered the artificial lift systems integration with the production facilities. Engaged in activities such as commissioning, maintenance programmes and inventory control.
Operations Supervisor-Eastern HemisphereFull Time
Weatherford Oil Tools
Sep 2007 - Nov 2011 -4 yrs, 2 months
United Arab Emirates , Dubai
- Job Details:Reviewed facility and production/field and prepared artificial and assisted lift design, implementation, surveillance and enhancement using gas lift, jet pump, progressive cavity pump and S-rod pump. Ensured that all communicated information was of high quality and correct while supervising well integrity issues and completing new design for the existing wellbores. Provided daily engineering support to field operations for artificial lift designs and diagnostics; also used real time data, field reports, decline curves, pressure information, wireline information, rates, etc. Monitored AFE cost performance to ensure AFEs were written with a prudent amount of funds for the work to be performed. Oversaw the installation of hydraulic lift systems as well as water injection systems, multiphase pumps and jet pumping systems. Monitored field operations including downhole jet pumping as well as commissioning, maintenance and operation of jet pump surface equipment.
Education
BSc in Mechanical Power Mechatronics Engineering
Assiut University (AUN)Jan 1998 - Jan 2005 - 7 yr
Skills
Training & Certifications
Six Sigma
Gazelles Management Consultancy ·2016Primavera
SitesPower·2016Lean Six Sigma Green Belt (LSSGB)
Gazelles Management Consultancy·2016Sales
Weatherford Oil Tools·2015Gas Lift Systems
Weatherford Oil Tools·2014Project Management Profissional (PMP)
Project Management Institute·2014Project Management
Amideast·2013Production Optimization
Society of Petroleum Engineering·2013Hydraulic Lift Systems
Weatherford Oil Tools·2010Customer Service
Weatherford Oil Tools·2010