
Ramadan Massoud Saad El-din
Project Manager
Helwan, Cairo, EgyptWork Experience
DESIGN AND SITE ENGINEERFull Time
AYOON EL MASEEF
Dec 2012 - Sep 2014 -1 yr, 9 months
Saudi Arabia
- Job Details:Responsibilities: • PLC and SCADA software development. • Resolve complex and unusual automation systems problems. • SITE ENGINEER: Responsible With A Team of Technicians to Perform Many Projects: - Raise The Efficiency of Power Station, Riyadh TV Center (KSA) (March – April 2011). Raise the efficiency of main generators panels, excitation panels, protection panels and auxiliaries’ panels and Raise the efficiency of main control system. - Riyadh TV Center (KSA-2011). Design a plan to increase number of sources and design ATS system to ensure that TV center is always feed, Design and Programming control system Using PLC LG (K120-S) and HMI (XGT-PANEL) to control in different sources using plc. - Al-Qurayat Radio Transmission Station (KSA-2012). Full Control of Generators by Using (COMAP Controller), ATS between Generators and Main Supply. , DESIGN AND PROGRAMMING SCADA System for Monitoring All Station Components. - Riyadh TV Center (KSA-2012). SCADA System of the TV Center Using (S7 PLC & WINCC SCADA) - Khomar Radio Transmission Station: Replacement And Renewal Project for Old Siemens switchgear and replacement with ABB SWITCHGEAR, Design Control System
design engineerFull Time
APECS
Jun 2009 - Dec 2012 -3 yrs, 6 months
Egypt , Cairo
- Job Details:Automation systems execution Experience: Responsibilities • PLC and SCADA software development. • Instrument programming and calibration • System Integration, Start-up, and Support. • Resolve complex and unusual automation systems problems. • SITE ENGINEER: Responsible With A Team of Technicians to Perform Many Projects: Damanhur wastewater treatment plant ( Aug. 2009 ) (Mimic Panel by using PLC - Instrumentation) - Upper Egypt Flour Mills Company ( Dec. 2009 ) Starting up wastewater pump station (Instrumentation & Control Panel) - 6 October Tertiary treatment plant (Feb. 2010 ) Full Automation for Filters operation using PLC and HMI - Al-shrouk 2 lift station (June 2010) Control System Using PLC – (instrumentation and programming) - Al-Shrouk 1400 pump Station ( Jan. 2011 ) (Control Panel & Mimic Panel both by using PLC) - AL-Sadat Wastewater Treatment Plant (2011) Full Automation for Filters operation using PLC and HMI. - Extension of Junction Screw Pumping Station (2012) Installing Monitoring & Control System and Design Scada System. - Badr Petroleum Company BAPETCO(2012) Start-up & Commissioning for synchronization board and generator set. - Start-up & Commissioning for Firefighting Systems - Cutler Hammer.
Education
Bachelor's Degree in ELECTRICAL POWER AND MACHINES DEPARTMENT
Helwan UniversityJan 2004 - Jan 2009 - 5 yr
Skills
- WIN KGL lg plc
- WINCC
- MOVICON
- S7-300 SIMATIC MANAGER
- XP BUILDER
- Wastewater Treatment
- Tertiary treatment plant
- Power Station,
- Radio Transmission Station
- Microsoft Visio
View More
Languages
Arabic
FluentEnglish
Advanced
Training & Certifications
ELECTRICAL POWER SYSTEMS DISTRIBUTION BASIC AND ADVANCED APPLICATION
JELECOM·2014AUTOMATION
APECS·2009AUTOMATION
APECS COMPANY·2009CONTROL
National Company for Cement.·2008ELECTRICAL POWER DISTRIBUTION
South Cairo Electricity Distribution Company.·2007ELECTRICAL POWER
Faculty of Engineering-Helwan University.·2005